Frequently Asked Questions

Account Management FAQs

How do I change my Contact Numbers?

Right Click → ‘Copy Link Address’

One may opt to change certain details pertaining to his/ her Corp account by using the RFS Self Service Portal,
https://rfs.gov.mt/myaccount.


The below instructions guide how one can update the Telephone, Mobile, and Other numbers through the RFS self-service portal.

  1. Navigate to https://rfs.gov.mt/MyAccount
  2. Click on Proceed to My Account
  3. If prompted, type in your Gov Email Address and Password
  4. Click Sign in
  5. Click on the Modify icon

    of one of the below fields (Depending on which field you wish to modify).
    1. Telephone Number
    2. Mobile Number
    3. Other Telephone
  6. A new page will load. Type in the new contact number accordingly in the fields located at the right-hand side.
  7. Should you wish to amend other contact fields:
    1. Tick the checkbox next to the respective field
    2. Type in the new contact number in the fields located at the right-hand side.
  8. Tick the below tick box to proceed if the details provided are accurate.
  9. Once all the necessary changes are made, click Apply
  10. Scroll down and click on the Submit button to submit your request for approval.

NOTE: Request must be approved by the Ministry’s respective RFS Approvers.

How do I change my Domain Password?

Right Click → ‘Copy Link Address’

When a new account is created for government employees, a new Persona Package is provided. A Persona Package includes the below;​

  • ​​​​​​A Domain Account (CORP)
  • A government Mailbox
  • Basic Internet Access​​

All of the above services, are accessible using the same credentials (Domain Username and password). If your workstation is connected to one of the domains (CORP ), the same credentials also applies to log in.​

One can change the CORP domain account password using different methods (mentioned below), depending on the requirements of the situation. All Passwords must meet a set of complexity requirements.

Click here to know which method best applies to you.


Password Complexity Guidelines

The Complexity policy settings determine if the password meet a series of guidelines (mostly mentioned hereunder) that are considered important for a strong password.

  • Password must not have been exposed to any danger or risks.
  • Passwords must not contain information pertaining to user such as: name, surname, ministry, department, country, and city.
  • The latest 5 previous used passwords cannot be reused.

Passwords must at least be 8 characters long and contain one character from three of the following categories:

    • English uppercase characters (A through Z)
    • English lowercase characters (a through z)
    • Numbers (0 through 9)
    • Symbols (for example, + – = ( ) & % ! ? > <
    • Passwords must NOT contain three (3) or more consecutive characters of the user’s username, name, or surname.

 

Domain Password can be changed using the below methods:


Method 1 – Using a workstation connected to MITA’s domain.

This option is used to change standard and privileged (e.g. DAS, DAU, DAC) accounts’ password using a workstation connected to the Government Network.

Requirements:

  • Access to a workstation
  • The workstation must be connected to the Government’s network (MAGNET) or VPN
  • Current password must be known.

Instructions:

  • Press ‘CTRL’ + ’ALT’ + ’Delete’ from a logged in workstation.
  • Select Change a Password

Type in the required details (Instructions below refers);

  • Username: CORP\surnn001
  • Old Password: Type in current password
  • New Password: Type in a new password
  • Confirm Password: Type the new password.

Method 2 – Using https://passwordchange.gov.mt/

This option allows users to change ONLY their standard CORP domain account password.

Requirements:

  • A device connected to any network connection.
  • Current password must be known.
  • Enrolled to the Multi-Factor Authentication (MFA)

Instructions:

  • Open an Internet browser and browse to https://passwordchange.gov.mt
  • Old Password: Type in the current password.
  • Create New Password: Type in a new password.
  • Confirm New Password: Type in again the new password.

Method 3 – Using the Self-Service Password Reset.

This option allows users to change ONLY their standard CORP domain account password.

Requirements:

  • A device connected to any network connection.
  • Must be registered to the MITA Password Reset System. More information available here.

Instructions:

  • Open an Internet browser and browse to https://passwordreset.gov.mt
  • If already registered, click on Reset Password after agreeing to the Terms & Conditions
  • Type in your domain username.
  • Click Next and follow the instructions provided in the portal.

Method 4 – Submitting an RFS request.

This option allows users to change their standard/ privileged (e.g. DAS, DAU, DAC) domain accounts’ password even if forgotten.

Requirements:

N/A

Instructions:

Users are to contact their respective IMU/ IT Department to submit the necessary request using rfs.gov.mt​. Once the RFS request has been submitted and approved (by the respective IMU/ IT Department), an automated tool will reset the password and send it to the password proxy.

NOTE: Password proxy is provided by the respective IMU/ IT Department when submitting the RFS request. Password might take up to a few minutes.


Method 5 – Using the MITA VPN service.

This option allows users to change their standard and privileged (e.g. DAS, DAU, DAC) domain accounts’ password using a workstation connected to a 3rd party network via VPN.

Requirements:

  • A workstation connected to any network connection.
  • Access to MITA VPN (using FortiClient)
  • Current password must be known.

Instructions:

  • Open FortiClient and connect to the Government’s network (MAGNET).
  • Once connected, Press ‘CTRL’ + ’ALT’ + ’Delete’ from a logged in workstation.
  • Select Change a Password​.

Type in the required details (Instructions below refers);​​​​​​​​​​​​​

  • Username: CORP\surnn001
  • Old Password: Type in current password.
  • New Password: Type in a new password.
  • Confirm Password: Type the new password.

If you are unable to determine which method is applicable for your password kindly click here

How do I change my Profile Picture?

Right Click → ‘Copy Link Address’

One may opt to change certain details pertaining to his/ her Corp account by using the RFS Self Service Portal, https://rfs.gov.mt/myaccount.


The below instructions, guides how you one can update the Telephone, Mobile and Other numbers through the RFS self-service portal.

  1. Navigate to https://rfs.gov.mt/MyAccount
  2. Click on Proceed to My Account
  3. If prompted, type in your Gov Email Address and Password
  4. Click Sign in

  5. Click on next to your current profile picutre
  6. Click on
  7. Select the file you would like to use (Image Requirements, Maximum Image Dimensions: 648px X 648px, Filetypes: .jpg or .jpeg, Maximum File size: 100 KB)
  8. Tick the box that states ‘I confirm that the image supplied is of me and conforms to the image requirements.’
  9. Click Apply
  10. Scroll down and click Submit
How do I check what Operating System my personal phone is running?

Right Click → ‘Copy Link Address’

You may need to know what Android version or iOS(iPhone) version your mobile is running for a lot of different reasons, like troubleshooting or finding features.


If you are using an Android phone follow the below steps:
  1. Open your phone’s Settings app.
  2. Near the bottom, tap About phone > Android version.
    • NOTE: Some models have the outlined section at the top of the settings section.

If you are using an iPhone follow the below steps:
  1. Open your phone’s Settings app.
  2. Tap General > About > iOS Version.
How do I remove my Profile Picture?

Right Click → ‘Copy Link Address’

One may opt to remove their profile picture to his/ her Corp account by using the RFS Self Service Portal, https://rfs.gov.mt/myaccount.


The below instructions, guides how you one can remove the Profile Picture through the RFS self-service portal.

  1. Navigate to https://rfs.gov.mt/MyAccount
  2. Click on Proceed to My Account
  3. If prompted, type in your Gov Email Address and Password
  4. Click Sign in
  5. Click on the Revert icon  found under your current Profile Picture.
  6. The image will be replaced by your respective initials. (e.g. Joe Smith is displayed as SJ)
  7. Tick the I confirm that the image supplied is of me and conforms to the image requirements.
  8. Click Apply
  9. Scroll down and click on the Submit button, to submit your request for approval.

NOTE: Request must be approved by the Ministry’s respective RFS Approvers.

MFA - How do I change my Multi Factor Authentication default method?

Right Click → ‘Copy Link Address’

If you’ve enrolled using only the SMS method, Microsoft strongly recommends enhancing your account security by also enrolling in the Microsoft Authenticator App. When you log into your account, a prompt will appear, guiding you through the process of enrolling in the Microsoft Authenticator App. You have the option to skip this step up to three times, but we highly recommend enrolling for added security.

NOTE: Should the above window not appear for you, and you are only enrolled using the SMS method please visit https://mfa.mita.gov.mt, navigate to the Security Info page and click + Add sign-in method from the top left. Choose the Authenticator app from the drop down menu and then the same steps will follow.

To begin the enrollment kindly click on Next, after which the below screen will appear.

As instructed, please download and install the Microsoft Authenticator app on your mobile device. This application is available from Google play storeiPhone App Store or Windows phone store.

The app is compatible with Android 8.0 or later and iOS 16.0 or later. To check what operating system your phone is running click here

Once you downloaded the app, follow the below steps to prepare the application for setting up the MFA.

  1. If prompted to allow notifications on your device, click ‘Allow’
  2. If prompted to accept Microsoft’s Privacy Statement, click ‘Accept’
  3. If prompted for ‘Help us improve Authenticator’, click ‘Continue’

From your computer click Next and you will be met with the below two screens (depending on the version of the app and mobile device, the mobile device section might different than the screenshot).

ComputerMobile Device

From your laptop or computer click Next. On your mobile device select Work or School account and then select Scan QR code (If prompted to allow Camera, click ‘Allow only while using the app’). With your mobile device scan the QR code shown on your computer.

ComputerMobile Device

Once you scan the QR code, your CORP account should appear within the Microsoft Authenticator App on your mobile device.

If your application states ‘App Lock enabled’, click ‘OK’ to dismiss the prompt.

Click Next on your Computer or Laptop.

In the following screen, your Computer will show you a number which you will need to input on your mobile device, and tap Yes as shown hereunder.

ComputerMobile Device

Once you complete the above, the following screen will appear and click Next.

Once you reach this point, the Security Info page will appear, showcasing all of your enrolled methods.

MFA - How do I enroll and use the Multi Factor Authentication?

Right Click → ‘Copy Link Address’

MITA provides Microsoft’s Azure Multi-Factor Authentication service that is used in conjunction with other MITA services to make their access more secure. The most common use is in conjunction with MITA’s VPN service.

One must first enroll to the Multi-Factor Authentication to be able to make use of such service. Users accessing the VPN service will be prompted with the normal Corp domain credentials and a token code / approval from the multi-factor authentication service depending on the selected method.

Instruction of how to enroll for the Multifactor Authentication can be found below:

Open an internet browser and navigate to the link https://mfa.mita.gov.mt (ideally from a laptop or computer, as you require your mobile device for another step)

The below screen should appear, login using your CORP email address ([email protected]) or UPN ([email protected]) and click Next

In the next page, type your CORP password and click Sign in

After you successfully login the below window will appear, click Next

For the following steps you require your mobile device.

The first method to setup is the Authenticator App.

As instructed in the following step, please download and install the Microsoft Authenticator app on your mobile device. This application is available from Google play storeiPhone App Store or Windows phone store.

The app is compatible with Android 8.0 or later and iOS 16.0 or later. To check what operating system your phone is running click here

Once you downloaded the app, follow the below steps to prepare the application for setting up the MFA.

  1. If prompted to allow notifications on your device, click ‘Allow’
  2. If prompted to accept Microsoft’s Privacy Statement, click ‘Accept’
  3. If prompted for ‘Help us improve Authenticator’, click ‘Continue’

From your computer click Next and you will be met with the below two screens (depending on the version of the app and mobile device, the mobile device section might different than the screenshot).

ComputerMobile Device

From your laptop or computer click Next. On your mobile device select Work or School account and then select Scan QR code (If prompted to allow Camera, click ‘Allow only while using the app’).With your mobile device scan the QR code shown on your computer.

ComputerMobile Device

Once you scan the QR code, your CORP account should appear within the Microsoft Authenticator App on your mobile device. 

If your application states ‘App Lock enabled’, click ‘OK’ to dismiss the prompt.

Click Next on your Computer or Laptop.

In the following screen, your Computer will show you a number which you will need to input on your mobile device, and tap Yes as shown hereunder.

ComputerMobile Device

Once you complete the above, the following screen will appear and click Next.

The second method to setup is your mobile number where you can approve the authentication either by a phone call or a text message.

From the following screen on your Computer, select the respective country code pertaining to your mobile number (e.g. Malta) and type in your mobile number and click Next.

If you choose for Microsoft to Call you, a robotic voice will instruct you to press # on your mobile phone and that way you will be verified. The process shown below is how you setup the SMS method.

A message from Microsoft should be received on your mobile device. Input the code received in the field as shown below and click Next.

The following window will appear indicating that the SMS was verified and click Next.

After successful completion of the above steps, the below screen will appear signifying that you are enrolled you may click Done and close the window.

Once two or more methods have been enrolled, you are now eligible to use the Self Service Password Reset (SSPR) portal. You can use the SSPR portal by clicking here


Instructions on how to install the VPN client software on a government workstation click here​. To know how to install the VPN client software on other machines click here.

MFA - Mobile Phone/ Device Changes

Right Click → ‘Copy Link Address’

If you are planning to change your device, we recommend updating your default MFA method to SMS before making the switch. This will allow you to set up MFA on your new device and remove the old one easily.

If the device change is unplanned and you no longer have access to your old device, please contact us through one of the following methods:


If you wish to follow steps on how to change your default MFA method, click here

If you wish to follow steps on how to enroll to MFA, click here

Password Reset System Instructions

Right Click → ‘Copy Link Address’

The Self Service Password Reset (SSPR) system is a Microsoft delivered feature that offers government enrolled users to a self-help facility to reset their Corp domain password if forgotten.

One must first enroll to the Self Service Password Reset (SSPR) system to be able to reset the Corp domain Password.

Click here for documented instructions of how one can enroll​ to the Self Service Password Reset (SSPR) system

Email FAQs

Accessing Online Archives from On-Premises Mailboxes

Right Click → ‘Copy Link Address’

From May 12, 2025, access to Online Archive mailboxes via Outlook on the Web (OWA) will no longer be available for on-premises mailboxes. However, you can continue to access your Online Archive using the Outlook Desktop application, which is not affected by this change.

If your mailbox is still on-premises and you do not have access to Outlook Desktop, kindly contact your respective Information Management Unit (IMU) or IT department. To find out how to do contact your IT click here. They can either explore moving your mailbox to the cloud to maintain archive access or explore other potential solutions.

Configure your email account on Android Devices using the “Outlook" Application

Right Click → ‘Copy Link Address’

The below instructions only apply when configuring your Government Mailbox on Android Devices using the Outlook application

NOTE: Microsoft Outlook Application is only supported on devices running Android Version 8.0 or later and can be downloaded from the Play Store.

  1. Make sure to have the latest version of Microsoft Outlook Application downloaded and installed
  2. Open the Microsoft Outlook application
  3. Type in your Government email address (i.e. [email protected])
  4. Click Continue

  5. You will be redirected to fs.mita.gov.mt, where you are required to type in you Corp domain password
  6. Once your domain password is typed in, Click Sign In

  7. You will be prompted to verify your authentication.
    • This depends on how you enrolled;
      • Type in the Multi-Factor Authentication code received by SMS.
      • Type in the Multi-Factor Authentication code received by the Microsoft Authenticator App.
      • Click Accept from the Notification received by the Microsoft Authenticator App.
      • Press the # Key from the phone call received.
  8. Once MFA Authentication is approved, you will be redirected to your Government mailbox.
  9. Mailbox is now successfully configured
Configure your email account on Android Devices using the Native Application

Right Click → ‘Copy Link Address’

The below instructions only apply when configuring your Government Mailbox on Android Devices using the Native application

  1. Open the Native mail application
  2. Click on Add an email address

  3. Select, Exchange and Office 365

  4. Type in your government Email Address
  5. Click Next
  6. You will be redirected to fs.mita.gov.mt, where you are required to type in your Corp domain password
  7. Once your domain password is typed in, Click Sign In

  8. You will be prompted to verify your authentication.
    • This depends on how you enrolled;
      • Type in the Multi-Factor Authentication code received by SMS.
      • Type in the Multi-Factor Authentication code received by the Microsoft Authenticator App.
      • Click Accept from the Notification received by the Microsoft Authenticator App.
      • Press the # Key from the phone call received.
  9. Once MFA Authentication is approved, your mailbox will be successfully configured

  10. Click Done
Create an email account on iOS Devices using the “Outlook” Application

Right Click → ‘Copy Link Address’

The below instructions only apply to configuring your Government Mailbox on iOS Devices using the Outlook application

NOTE: Microsoft Outlook Application is only supported on devices running iOS Version 16.0 or later and can be downloaded from the App Store.

  1. Make sure to have the latest version of Microsoft Outlook Application downloaded and installed
  2. Open the Microsoft Outlook application
  3. Type in your Government email address (i.e. [email protected])
  4. Click Add Account
  5. A screen similar to the below will prompt, click on Open Authenticator

  6. You will be redirected to fs.mita.gov.mt, where you are required to type in your Corp domain password
  7. Once your domain password is typed in, Click Sign In
  8. You will be prompted to verify your authentication.
    • This depends on how you enrolled;
      • Type in the Multi-Factor Authentication code received by SMS.
      • Type in the Multi-Factor Authentication code received by the Microsoft Authenticator App.
      • Click Accept from the Notification received by the Microsoft Authenticator App.
      • Press the # Key from the phone call received.
  9. Once MFA Authentication is approved, your mailbox will be successfully configured
Create an email account on iOS Devices using the Native Application

Right Click → ‘Copy Link Address’

The below instructions only apply for configuring your Government Mailbox on iOS Devices using the Native application

  1. Open the device Settings from the Home Screen
  2. Tap on Mail
  3. Tap on Accounts
  4. Tap on Add Account
  5. Select Microsoft Exchange
  6. Type in your government Email Address
  7. Click Next
  8. Click on Sign In if the below message prompts. The domain in the prompt will vary according to the user’s email address.
  9. You will be redirected to fs.mita.gov.mt, where you are required to type in you Corp domain password
  10. Once your domain password is typed in, Click Sign In
  11. You will be prompted to verify your authentication.
    • This depends on how you enrolled;
      • Type in the Multi-Factor Authentication code received by SMS.
      • Type in the Multi-Factor Authentication code received by the Microsoft Authenticator App.
      • Click Accept from the Notification received by the Microsoft Authenticator App.
      • Press the # Key from the phone call received.
  12. Once MFA Authentication is approved, your mailbox will be successfully configured
Email Recommendations of Use

Right Click → ‘Copy Link Address’

Correct use of Email

Email should be used primarily for business purposes.  Personal use is only acceptable in limited circumstances and if it does not interfere with the performance of the Account Holder’s duties or those of other Account Holders.


Mailbox Owner

The Government Email service is provided for business use only, and hence it is deemed to be the property of Government. Thus, any Emails, including attachments that are created, sent, received, or printed via the Email service become the property of Government.


Offline/ Archive Mail

It is good practice to regularly clean up the mailbox (including the Deleted Items and Sent Items folders) to keep the mailbox size as low as possible.  Remember that even calendar appointments take up mailbox space.  Click here to learn how to remove old unwanted calendar appointments. An Offline folder can be created to further reduce the size of the online mailbox.  It is recommended that regular backups of the Outlook Offline files are taken on media such as DVDs, USB Pen Drives, Archive Space R: drive (if you have the service enabled)  or External Hard Disks (you cannot store PST files on H: and P: folder ).  However, it is important to keep in mind that Microsoft neither supports nor recommends the use of PST files on a network drive.  This means that although you can back up onto a network drive that allows you to do so (such as R: if available – you cannot back up on P: or H:), the offline file being used must be stored on your local hard disk. This warning can be found within a Microsoft web page here.Since offline is in effect a local file, the offline file must be available to view or update offline email.  This means that although online features are available from anywhere using Microsoft Outlook Clients, the offline file must be available on the workstation being used in order to be accessed.

NOTE: Microsoft recommends keeping the size of a .pst file to less than 50GB for Outlook but it is recommendable to try to keep it much less than that.  Keep in mind that if this file is damaged or corrupted then you will possibly lose all the offline mail within that file.


SPAM, Phishing and Spoofing

SPAM: is the use of email to send unsolicited messages, usually for advertising purposes. MITA has a service in place to try to prevent as much as possible such emails from arriving to your inbox. However, it is not always technically possible to detect such emails without the risk of blocking legitimate ones. For this reason, emails that are likely to be spam might still be delivered to your inbox. However, one must keep in mind that there are technical constraints and the automated systems cannot be 100% accurate. To be entirely sure whether an email is SPAM or not one needs to contact the sender to verify the validity of the email.

Phishing: is similar to SPAM, but the sender is explicitly attempting to gain sensitive information from you, such as logins, passwords or credit card details.  In essence phishing emails rely on social engineering techniques to deceive users to willingly provide information to untrusted third parties.  Such emails are usually made to seem legitimate emails coming from popular web sites, and might sometimes press you by stating that your account will be closed or that your account has been compromised.  It is important not to click on any links and especially not to provide any password in such links.  The provided link is usually to a fake web site that may seem identical to the legitimate one.

Spoofing: is a method of sending emails (usually phishing emails or emails containing viruses/malware) that seem to originate from legitimate senders.  Thus you might receive an email from a person you know when in fact it was send from a malicious sender or from a virus on this person’s workstation.

NOTE: In all cases, if in doubt do not open suspicious emails and attachments. You may consult with MITA by forwarding the suspicious email (as an attachment .msg) to [email protected].


Use of Distribution Lists and Distribution Groups

When the business requires emails to be sent to many recipients, it might be better to put the recipients in the Blind Carbon Copy (Bcc) field while addressing the email to your own email address. This way the individual recipients would not be able to view the email addresses of all the other recipients. It is always recommended to limit the attachment size as much as possible and send such emails outside office hours, since such emails can generate higher load on the email servers and on the network. Emails that are not related to the business of the respective department, such as chain emails, should not be sent.


Attachments

Attachments facilitate the exchange of electronic documents between users.  In most cases compressing the files before attaching them greatly reduces the email size.  Attachments from unknown senders should not be opened.


Access from a Mobile Device

Access to email from mobile devices is dependent on the make and model of the device and also upon the software installed on the mobile phone model.

Email Service Description

Right Click → ‘Copy Link Address’

Current Email Service Description may be found on the CIO Portal. Please contact the respective Information Management Unit or IT Representative for access or MITA Call Centre for more information.

Exporting contacts from the Outlook (desktop version)

Right Click → ‘Copy Link Address’

Step 1: Open Outlook: Launch your Outlook desktop application.

  • Navigate to File Menu: Click on the File tab in the top left corner.
  • In Outlook365, go to Open & Export and then click Import/Export.

Step 2: Choose Export Option

  • In the Import and Export Wizard, select Export to a file and click Next.

Step 3: Choose the File Type

  • Select Comma Separated Values (CSV) or Outlook Data File (.PST) and click Next. According to the format supported by the account for importing data.

  • Select the Contacts Folder

Step 4: Choose the Contacts folder you want to export. If you have multiple contact folders, make sure to select the correct one.

Click Next.

Step 5: Save the File

  • Click on Browse to choose where you want to save the exported file and give it a name.

After selecting the location and name, click OK, then Next.

Step 6: Complete the Export and click Finish to start exporting your contacts.

How do I access Webmail From Personal Devices?

Right Click → ‘Copy Link Address’

This documentation provides instructions of how to log in to Webmail from a non-trusted device, such as mobile phones, tablets and personal workstations.

  • If using a MITA managed device (have an inventory number) than the below is not applicable.
  • If using a personal device, kindly go through the below process;
    • Enrolled to the Multi-Factor Authentication? This can be confirmed by navigating to https://mfa.mita.gov.mt.
      • If not enrolled, then enrolment must first be initiated. One can follow instruction found in the
        MITA Support Website. Once enrolment process has been complete, proceed to Method
      • If enrolled, then proceed to Method

Method
  1. After navigating to https://webmail.gov.mt, you will be prompted with the following requirement shown below:
  2. Type in you Government email address (i.e. [email protected]) and click Next
  3. You will be redirected to fs.mita.gov.mt where you are required to type in your CORP domain password:
  4. After the domain password is inserted you will be prompted to verify your authentication. This depends on how you have enrolled;
    – Type in the Multi-Factor Authentication code received by SMS.
    – Type in the Multi-Factor Authentication code received by the Microsoft Authenticator App.
    – Click Accept from the Notification received by the Microsoft Authenticator App.
    – Press the # Key from the phone call received.
  5. Once MFA authentication is successful, you will be ask to stay signed in. This option will reduce the number of times you will be asked to sign in.
    – This option can be accepted or declined to your desire by either pressing Yes or No

  6. After your selection you will be redirected to Webmail with successful authentication.
How do I add a generic mailbox to Outlook mobile?

Right Click → ‘Copy Link Address’

If you use Outlook for iOS or Outlook for Android, you can add a generic mailbox you have permissions to access on Outlook Mobile, if both your generic mailbox and personal mailbox have been migrated to the cloud.


Use a shared mailbox on a mobile device (Phone or Tablet)

To access a generic mailbox on a mobile device, use the following steps.

  1. Open Outlook
  2. Sign in to your primary account in Outlook for iOS or Android.
  3. Tap on your profile picture on the top left of the screen.
  4. Tap the Add Account or ‘+sign button in the left navigation pane, then tap Add a Shared Mailbox

NOTE: If you have multiple accounts in Outlook Mobile, select the account that has permissions to access the generic mailbox. 

After the account setup process completes, the generic mailbox will display in your account list in Outlook for iOS or Outlook for Android.

To remove a shared mailbox, go to Settings Accounts. Then tap on the shared mailbox and select Delete Account.

How do I apply for Email Additional Options?

Right Click → ‘Copy Link Address’

RFS are submitted by the respective IMU or IT department. Any related cost is indicated within RFS Portal.

The below services can be applied for through the ​RFS Portalhttps://rfs.gov.mt

NOTE: Instructions of how to submit such services can be found in the ‘Resource Mgmt. – Other Services‘.


Modify Persona Details

Business Justification: After an email account is created, there might be the need to modify the user details (e.g. Name, Surname, Position / Title, Department, Section / Location).


Exchange Online Archive

Business Justification: Office 365 mailboxes feature an online (cloud) archive service (Exchange Online Archive) intended to move (archive) emails within as a long-term repository while alleviating load from the mailbox itself. When activated, the user is presented with a new folder under the mailbox’s folder structure [Online Archive – email address] and may be managed as a normal Outlook folder.

  • The Exchange Online Archive service is attainable by design, on Government personal mailboxes only.

Additional Mailbox Size

Business Justification: Regular maintenance of the mailbox and the use of offline folders should always be attempted first before placing a request to increase the mailbox size. If there is still a justified work-related need to have a mailbox larger than standard, approval from your department’s management for the additional expense is required.


Mailbox Restore

Business Justification: It is possible for users to recover deleted emails up to 30 days after the emails have been deleted without the need to restore the mailbox. Please check this link​ to learn how this can be done. If this is unsuccessful, you can request for a mailbox restore to be performed by MITA. It is important to note that when the mailbox is backed up, the information stored is a snapshot of that time (i.e. If a mail/calendar appointment is sent/received and deleted during the same day, it will not be backed up in the daily backup. One has to keep in mind the available backup dates (i.e. the date from which the restore will be made) according to the backup schedule, since this limits the date options from which a restore can be made. Refer to the below table. The backup is taken at 1800HRS daily.

 
​Backup DateAvailable Restore​Mail Folder Structure 
​​​1 – 7 DaysAny day up to 7 days​​Yes
​0 – 30 DaysSelf-Recover: Users can recover email from the Deleted Items
folder. Click here to learn more.
N/A
RFS: If Deleted Items folder was purged, an RFS request must be raisedNo
 

Distribution Group

Business Justification: Server-Side Distribution Groups are used to send an email to a large number of users. An example of this is the DOI Information Releases that are sent by email. More technical information about Distribution Groups can be found here.

NOTE: When sending to the all email users distribution group, the maximum mail size including attachments is 20MB. This option might require another Non-Standard Request to increase the Maximum Number of Recipients.


Secure Email (AIP)

Business Justification: Secure Email is an email system whereby transmissions of email messages are encrypted. Emails sent using Secure Email can only be opened by clients who also have secure mail configured at their end. This service is required where higher security is required, such as when sending confidential information via email. More information can be found here.

How do I apply for Email Non-Standard Requests?

Right Click → ‘Copy Link Address’

Consideration should be given to all cases before non-standard request are made, ensuring that a valid business need for every request.  Such requests are submitted against a deviation from one or more policies or best practices. Additional charges might also be incurred to fulfil these requests.  In some instances, there might be additional risks and liabilities that will be carried by the respective user and/or department.

Approval from your department’s management as well as your CIO / IT Manager is required before proceeding with the request.


Un-Quarantine Email

Business Justification: Although the GFI e-mail filter is intended to block attachments that may pose security threats, there might be a valid business reason to un-quarantine such blocked email.

  • Method: Quarantined emails can be requested for release by forwarding the email sent by the E-mail filter to [email protected].

Multiple Email Addresses

Business Justification: If a person requires multiple email addresses pointing to the same mailbox (i.e. to the same role within government) a one or more secondary SMTP email addresses can be attached to the one physical mailbox.  The old email address is kept as secondary email address so that emails sent to the old address are not lost.  If you need to apply for a secondary SMTP use the method below.  It is important to keep in mind that The secondary SMTP email address needs to be a government email (usually @gov.mt).

  • Method: Send an email to your respective CIO or IT Manager.  If approved, your request will then be forwarded to the MITA Service Call Centre mailbox for processing.

NOTE 1: If the email address is in use or was previously used for a personal account pertaining to a different individual (i.e. not the same person requesting it), then the email address cannot be used. If the required email address was previously used by the same individual while in a different organisation, then approval from the previous organisation must be sought before the request can be processed.

NOTE 2: When there is a change in user details that triggers a change in the email address (e.g. change in surname, organisation etc.) MITA automatically sets the old email address as secondary SMTP and no further requests need to be made in this regard.


Access Generic Mailbox from a Mobile Device

Business Justification: Although it is possible to access a generic email from a mobile device, care should be taken with such requests since there are some technical limitations.  A generic email can be configured to be accessed from a smartphone by only one specific person.  This specific person must also have a secondary domain account, since it is not technically possible to access a generic email from an account that has a personal mailbox associated to it.

  • Method: An email from a person who can approve RFSs is to be sent to [email protected] including the user details and the generic mailbox to be accessed​.  A secondary domain account will be created and bound to the required generic mailbox.

Maximum Number of Recipients

Business Justification: As default, users can send up to a max of 200 recipients simultaneously. Some roles include duties to send business emails to a large number of recipients.  This can be, for example, via a Distribution Group, or via a local Distribution List within the contacts.  If the number of recipients exceeds the allowed limit, then the email is not sent.  In certain cases, it might be possible to send the same communication multiple times each time including a limited number of recipients.  However, if this functionality is required on an ongoing basis a request should be made as below.

Each ministry has a generic email account (Information Release at Ministry Name) that can send bulk emails.  If the requirement to send an email to multiple users is a one-off case then this account can be used. The respective Information Management Unit should be contacted to enquire about this facility.

NOTE: ​As per email GMICT policies, bulk email should only be sent before 08:00 and after 17:00. To protect the email infrastructure, failure to comply with the policy may result in the sender account being disabled.


Maximum Email Size

Business Justification: It is always recommended to keep the email size as small as possible. Compressing files before sending them as attachments can help to reduce the size. In any case the size of a single email cannot exceed 20MB. This includes both the email content and attachments.  If this size exceeds, then the email is not delivered.  In most cases splitting the attachments over several emails can serve as a workaround.


Mail Forwarding to a 3rd Party Mailbox

Business Justification: While from security point of view it is acceptable to forward or redirect your emails to another government mailbox (click here to learn how to set forwarding and redirection emails), forwarding emails to a Third Party Mailbox (i.e. not hosted by MITA) should be avoided. If you have a business reason to forward emails to other providers, you need to apply for a deviation from policy.

How do I apply for the Email Service?

Right Click → ‘Copy Link Address’

RFS are submitted by the respective IMU or IT department.  Any related cost is indicated within RFS Portal.


Personal Mailbox

All employees working with a Government Organisation who make use of MITA’s email service are provided with a Persona package, which includes a domain (Corp) account, Standard Internet access and a Government Email Service.

Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to submit a new Persona Package can be found in the ‘RFS Users Guide‘.


Generic Mailbox

A generic mailbox is a normal email account, with the difference that it is shared between a number of users. When granting rights to a generic mailbox, there can be these two different types of accesses that users can be assigned:

  • ​​​Send on Behalf rights allows the delegate to send messages from the mailbox. When this option is used the recipients see that the email was sent by the delegate (“<Delegate> on behalf of <Mailbox>”). However, replies to these messages are sent to the generic mailbox, not to the personal mailbox of the sender. Users assigned Send on Behalpermissions cannot make use of dedicated Outlook profiles of generic mailboxes.
  • Send As rights allows the delegate to send messages as if they came directly from the mailbox. Recipients see the emails as originating directly from the generic mailbox and there is no indication of the individual who sent the message. This can be partly mitigated by using a personal email signature within the email text. Users assigned Send As permissions can make use of dedicated Outlook profiles of generic mailboxes.
 
Such services can be applied for through the RFS Portal, https://rfs.gov.mt
 
NOTE: Instructions of how to submit for a New/ Modification or Deletion of a Generic Mailbox can be found in the ‘RFS Users Guide
 
NOTE: Users must have a personal email account to access a generic mailbox. Based on best practice, generic domain accounts are NOT associated with a generic mailbox. The reason is that is this is done there is no accountability for the mailbox and hence any operations within it may not be traceable in an audit/ investigation.​
How do I backup my PST files (Offline mail)?

Right Click → ‘Copy Link Address’

PST files, also known as Personal Storage Table files, are data files used by Microsoft Outlook to locally store and manage a wide range of data, with a primary focus on email messages. In addition to emails, Outlook utilizes PST files to store and organize various Outlook items like contacts, calendars, tasks, and notes. Among CORP users, PST files are often referred to as Offline Mail since they enable users to access their emails and related data even when offline, directly from their computers.

To ensure data safety and prevent any potential data loss, it is crucial to create backups of these locally saved PST files. It’s important to note however, that while you can use OneDrive for backing up your PST files, it’s important to only backup copies of the PST files in OneDrive rather than directly placing the ones mounted in Outlook. Accessing PST files from Outlook while they are not located on the same workstation (e.g. laptop), increases the chance of irreversible corruption and hence loss of data. For instructions on how to back up your data, please refer to this link.

How do I check my Mailbox Size?

Right Click → ‘Copy Link Address’

All mailboxes have a 10GB of free storage. To check the remaining free storage follow the below instruction depending on what Microsoft Product you are using;

Microsoft Outlook 365
  • ​Open Microsoft Outlook 365
  • Right click on your mailbox (found on the top left hand side of the screen)
  • Click on Data File Properties
  • Click on Folder Size

Outlook on the web

Once you login into your email account/ generic mailbox, click on the ‘gear icon’, and select Options

  1. The ‘Options’ window will prompt, on the left hand side menu, click ​My account
  2. Under My account you will be able to see the Mailbox size as per below

How do I configure a Generic Mailbox using a Dedicated Microsoft Outlook Profile? (SendAs Permissions)

Right Click → ‘Copy Link Address’

NOTE: This method only applies if you have Send As permissions on the Generic Mailbox. To confirm what type of access you have you may check from https://rfs.gov.mt/myaccount/ and select the My Resources tab.

  1. Open Outlook
  2. Select File > Account Settings > Change Profile. Outlook will prompt to close, click ‘OK‘. Now open outlook again.
  3. On the profile picker dialog box, select Options.
    NOTE: Before selecting New, select the check box for “Prompt a profile to be used.” If this is enabled, you will get a prompt every time you start Outlook to pick which profile you want to open. This is helpful when you have multiple profiles and need to switch between them.
  4. Select New.
  5. Type a name for the new Outlook Profile and select OK.
  6. In the next screen enter the share mailbox email address and click connect.
  7. Your will now be prompted for credentials. Enter your personal email address to authenticate let the process to complete and select done. Your profile is ready.
How do I configure Automated Emails on Applications, Scripts and Document Centers?

Right Click → ‘Copy Link Address’

The information below, explains how to correctly configure applications, scripts and document centers (such as printers/scanners) that are routing emails through MITA smtp relay service (smtp.email.local).

An email is communicated between 2 or more mailboxes, the receiver (To field) and the sender (From field), both mailboxes must have a valid email domain/ suffix. This also applies when configuring automated emails, otherwise the email will not be able to routed and will fail delivery.

The below table shows examples of a valid email domain/ suffix;

​Valid Email DomainInvalid Email Domain
​gov.mtx​​erox.com
​transport.gov.mt​server1.local
​arms.com.mt​test123.com

A valid smtp address is also required. The below samples show a valid smtp address;

  • <pinter_floor>@gov.mt
  • <server_name>@gov.mt
  • <application_name>@gov.mt
During configuration, the SMTP Server Settings must be configured using the Hostname (smtp.email.local) on port 25  and not the IP Address
If not already configured, the DNS must be configured using the following IP Addresses;
  • 10.81.0.3
  • 10.83.0.3
How do I configure Microsoft Outlook for a Personal Mailbox?

 Right Click → ‘Copy Link Address’

  1. Click the Start Button  found in the bottom left corner of the screen
  2. Type Control Panel and press Enter

  3. From the top right set the View by to ‘Large icons’
  4. click on the Mail application
  5. A new Window will prompt, click on Show Profiles…
  6. Click on Add…
  7. Type in a Profile Name to your liking
  8. Under the Email Account the Display Name and Email Address will automatically be generated
  9. Click Next
  10. Once automatic configuration is done, as shown below, click Finish
How do I configure the native Apple Mail application for Mac OS?

Right Click → ‘Copy Link Address’

To configure the Apple Mail applications that comes as a standard with Mac OS with the email provided by MITA, please carry out the following steps:

 
NOTE: If you need to use Microsoft Outlook instead please click here​.
  1. Ensure internet connectivity and open Mail.
  2. Add Account
  3. If this is the first time opening the application, you will be presented with an “Add Account” Dialogue.  Choose “Exchange” and then click on “Continue”
  4. If Mail has been already set up to access other personal mailboxes, click on “Mail” (next to File, Edit, View….) and then click on “Add Account”.  Choose “Exchange” and then click on  “Continue”
  5. Insert Name and Surname in the “Name” text box.
  6. Insert your Government Email Address  in the “Email Address” text box.
  7. Insert your Government Email password in the “Password” text box
  8. Click on “Sign In”.
  9. Type in “webmail.gov.mt” as Incoming and Outgoing URL​
  10. You will be presented with an error stating “Unable to verify account name or password”.  Insert your Corp username in full (Corp\surnn001001) and click “Next”.
  11. Select the apps to synchronize and click “Done”.​
How do I create a recurring Calendar appointment?

Right Click → ‘Copy Link Address’

A recurring appointment is an appointment that is repeated on a regular basis (e.g. every Monday, once a week, every Wednesday once a month, etc.)

To create a recurring appointment follow the below instructions, depending on what Microsoft Outlook you are using;


Microsoft Outlook 
  • Select Calendar icon, left section on Outlook
  • Set up appointment, click New > New Appointment
  • Compose appointment details, then click Recurrence button
  • An Appointment Recurrence dialog will pop up
  • Select the preferred Appointment TimeRecurrence Pattern and Range of recurrence
  • Once finished click Ok
  • Click on Save & Close to save the appointment

Microsoft Outlook on the web (webmail)

Once you login into your email account/ generic mailbox, click on the ‘functions’ button and select Calendar

  1. Click on the  button
  2. Fill in all the required details of the appointment
  3. Under Repeat, select one of the conditions

    Condition Other… will give further options to repeat the calendar appointment as per below;
  4. Click
How do I delete old Calendar appointments?

Right Click → ‘Copy Link Address’

Calendar appointments and any documents attached to these appointments take up space from your allocated mailbox size.  To manage your mailbox size it is good practice to remove all the unwanted Calendar appointments.

NOTEKeep in mind that once deleted from your Calendar the appointments cannot be viewed.

To delete appointments from your respective Microsoft Outlook follow the below steps:


 Microsoft Outlook 
  • Open Microsoft Outlook
  • Click on Calendar
  • Select the View menu and click on Change View and select List
  • Select the items (Sort by date) you wish to delete (Pressing CTRL+A selects all items)
  • Click on the delete icon (or press the DEL key)
  • To go back to the previous Calendar view select the View menu and click on Calendar.

If you delete an item by mistake and you wish to know how to recover it please click here.


Microsoft Outlook on the web (webmail)

Once you login into your email account/ generic mailbox, click on the ‘functions’ button and select Calendar

  1. Browse the date of the calendar using one of the following (Circled in red) functions to search for the appointment
  2. Left click on the required meeting/appointment and click on the Decline button or Cancel button
How do I ensure I don't lose my contacts saved on my phone if my identity or mailbox is going to be deleted?

Right Click → ‘Copy Link Address’

In certain cases, users might have their telephone contacts (stored in their personal phones) pointing to Exchange. This is either configured by the user or set by the default on certain phones. Such contacts may be lost if the mailbox or identity is deleted. Before deleting the identity or mailbox, it is important to seek assistance from MITA to ensure your contacts are not lost.

How do I extend a Generic Mailbox within the same Microsoft Outlook Profile? (Mac OS)

Right Click → ‘Copy Link Address’

NOTE: The below method applies on both Send As and On Behalf of permissions on the Generic Mailbox. 


How to add a Generic Mailbox on Mac OS
  1. From the ribbon at the top, click on Tools

2. Click on Accounts

3. From the bottom left click the + sign and click on New Account…

4. Type the email address of the generic mailbox you wish to add.

5. In the following screen, you will be prompted to authenticate using your account. Therefore remove the generic email written and type your personal email address and click Next.

Please note that you need to use an account that has access to the generic mailbox in order to proceed with the following steps.

6. Type in your password and click Sign in

7. Approve the sign in request using your default MFA method.

8. Click Done

8. To complete the setup, simply close the window by clicking on the top left corner.

How do I extend a Generic Mailbox within the same Microsoft Outlook Profile? (Send On Behalf Of Permissions)

Right Click → ‘Copy Link Address’

NOTE: For this method to work, you need to have Send On Behalf Of rights on the Generic Mailbox. To confirm what type of access you have you may check from https://rfs.gov.mt/myaccount/ and select the My Resources tab.

  1. Open MS Outlook
  2. Right Click on your personal Email Address from the left-hand side menu
  3. A new window will prompt, Click on Advanced…
  4. Another window will prompt, select the Advanced tab
  5. Click Add…

  6. Type in the email address of the Generic Mailbox and click OK

  7. The Generic Mailbox will be added as shown below
  8. Click on OK twice
  9. The Generic Mailbox will be added to the left-hand side menu
  10. Click on the Arrow to expand and view folders under the Generic Mailbox.
How do I extend a Generic Mailbox within the same Microsoft Outlook Profile? (SendAs Permissions)

Right Click → ‘Copy Link Address’

NOTE: This method only applies if you have Send As permissions on the Generic Mailbox. To confirm what type of access you have you may check from https://rfs.gov.mt/myaccount/ and select the My Resources tab.

  1. Open MS Outlook
  2. From the Top Left corner, click File
  3. Under Info, click Account Settings and select Account Settings…

  4. A new window will prompt, Under the tab Email, click New…

  5. Another window will prompt to have the Generic Mailbox configured
  6. Type in the Generic Mailbox email address
  7. Click Connect

  8. Select Microsoft 365

  9. Log in window will prompt
  10. Type in your personal government Email Address (i.e. [email protected]) and Password
  11. Click Sign in

  12. Click Done


  13. Close and re-open Outlook
How do I manage Spam email?

Right Click → ‘Copy Link Address’

Although MITA has a SPAM filter in place, a number of such emails can still make it to your inbox. Check the SPAM, Phishing and Spoofing information in the Email – Recommendations of Use page.

Microsoft Outlook offers the facility to set a rule to automatically move such emails to a required folder. To configure it in Microsoft Outlook follow these steps:

Microsoft Outlook
  • Open Microsoft Outlook
  • In the Quick Access Toolbar under Home click on Rules
  • Click Manage Rules & Alerts
  • In the Rules and Alerts dialog box, on the E-mail Rules tab, click New Rule
  • Under Step1: Select Move messages with specific words in the subject to a folder
  • Click Next
  • Under Step 2: (lower part of the Rules Wizard), click specific words and in the Specify words or phrases to search for in the subject: write “[SPAM] -” (without the quotes)
  • Click Add
  • Click OK
  • Also under Step 2: (lower part of the Rules Wizard), click specified folder and select Deleted Items folder or any other folder of your choice (note that if you select another folder you will have to delete unwanted emails manually)
  • Click OK
  • Click Next 3 times
  • Check Run this rule now on messages already in “Inbox”
  • Click Finish
  • Click Apply
  • Click OK

Outlook on the Web (webmail)

Once you login into your email account/ generic mailbox, click on the ‘gear icon’ and select Options

A new window prompts, on the left side menu, click on Inbox and sweep rules

  • click on the  icon
  • Fill in the required information as per below;
    • Name: Type in a name to identify the rule (i.e. SPAM Rule)
    • Condition: Select, It include these words > in the subject…
      • Specify words: [SPAM]
      • Click  and OK
    • Action: Select, Move, copy, or delete > Copy the message to folder…
      • Select a folder of your choosing (i.e. Junk E-Mail folder)
      • Click  and OK
    • Untick Stop processing more rules

    The rule conditions and actions should be similar to the below;

  • Click  button to save the rule
How do I migrate .pst file to Exchange Online Archive?

Right Click → ‘Copy Link Address’

Click here for instruction on how to migrate .pst files to Microsoft’s Exchange Online Archive.

How do I migrate one mailbox to the cloud?

Right Click → ‘Copy Link Address’

This can be done by visiting rfs.gov.mt, Persona Management (for personal mailboxes) and Resource Management (for generic mailboxes).

In Persona Management, search for the required mailbox, click on Core Services and select the Cloud Mailbox tick box. After agreeing with the service description note, the logger may submit the request for client approval. Once approved by the RFS approver (client), the mailbox will move to the cloud. By migrating mailboxes to the cloud, the logger and approver confirm their agreement with the entirety of the service description.

In Resource Management, search for the required mailbox, select the Cloud Mailbox tick box. After agreeing with the service description note, the logger may submit the request for client approval. Once approved by the RFS approver (client), the mailbox will move to the cloud. By migrating mailboxes to the cloud, the logger and approver confirm their agreement with the entirety of the service description.

How do I move emails to Online Archive?

Right Click → ‘Copy Link Address’

Automatic Method (Preferred Method)

To set automatic archiving to the online archive a setting must be changed within the Outlook Client. To apply the setting, kindly follow the steps below;

  1. Right-click the required mailbox folder (e.g., Inbox)
  2. Click properties.
  3. Go to the Policy tab.
  4. In the Online Archive section, select;

a. 90 days, 1 year or 2 years so that emails will be retained in the online folder for the selected duration (90 days, 1 year or 2 years), after which the emails will be moved from the online folder to the corresponding folder with the same folder name in the mailbox’s Online Archive.

OR

b. ‘Parent Folder Policy’ to cancel any previously selected retention policy. When this policy is set, no emails will be moved automatically to the mailbox’s online archive.

  1. Click apply and OK
  • NOTE:
    • It is important to note that like all cloud mailboxes, the Online Archive is not backed up within our systems (no point in time restores are available).
    • You can either select a retention of 90 days, 1 year or 2 years. Any mail within the given folder which is older than the selected age (90 days, 1 year or 2 years) is moved to a folder within your Online Archive labelled with the same folder name.
    • These policies may only be applied to personal mailboxes (not shared/generic).
    • When the policy is applied to a folder within the mailbox (e.g., Inbox) all sub-folders within the said folder will inherit the policy, unless individually overwritten.
    • If you request to have your mailbox migrated to the cloud, the policies need to be re-applied on the respective folders.
    • The policy may require a few hours to be executed.
    • A different policy may be applied to different folders.

Manual method

The below method is used to move Email from your government personal mailbox to the Online Archive. This option may also be used to move email content from PST files to the respective Online Archive. It is also recommended to have a backup copy of the PST file before attempting any operation on it. MITA cannot provide restores of PST files in case of corruption or loss.

This method processes its services in the background and should not hinder Microsoft Outlook’s performance, irrespective of the traditional ‘drag and drop’ method.

  1. Open Microsoft Outlook 
  2. Select the emails you would like to move/ archive to the Exchange Online Archive by highlighting them.
  3. In Microsoft Outlook,
  4. Navigate to the Home Tab
  5. Click on Move
  6. Click Other Folder


  7. A new window will prompt, Select the destination folder within the Online Archive.
    (Note: The destination folder needs to be manually created within the Online Archive before the above step.)
  8. Click OK

NOTE: Kindly ensure that the workstation does not switch to a state that interrupts communication with the network, as this may stop or cause problems for the ongoing process.

It is recommended to test this method by using small batches of unimportant emails so that you gain familiarity with how it works and avoid unrecoverable data loss. After testing, it is still strongly recommended to continue moving small batches of emails at any given point in time to avoid potentially unrecoverable loss of emails. Repeat as a batch is confirmed to have completed archiving. Please contact MITA Call Centre if required, before attempting archiving.

How do I recall an email?

Right Click → ‘Copy Link Address’

If you sent an email by mistake or after you sent it you realised that you need to modify something, there is an option in Microsoft Outlook that allows you to do so.

NOTE: The success of this method depends on the recipients’ actions. If the recipient read the original email immediately (e.g. from a mobile device) or even after the recall attempt has been made, the original email would still have been disclosed.

To try to recall a sent message from Microsoft Outlook (this option is not available from webmail or from mobile devices) perform the following:

Outlook 365
  • Open Microsoft Outlook
  • Click on the Sent Items Folder
  • Double click on the email you wish to recall or delete
  • Click File
  • Under Info select Resend or Recall
  • Select Recall This Message…
  • This opens the Recall Option dialog
  • Select the required option
  • Click OK
How do I recover Deleted Items?

Right Click → ‘Copy Link Address’

Deleted emails or calendar items are stored in the Deleted Items folder, still taking up storage from your allocated mailbox size.

It is good practice to empty the Deleted Items folder, to free up your mailbox storage. This can be done by;​

  1. Right click on the Deleted Items folder
  2. Select Empty folder

NOTEEmptying the Deleted Items folder, will permanently deleted all items found in the Deleted Items folder.

If by ACCIDENT you have permanently deleted emails or a calendar items, it is possible to recover them for a period of time after they have been deleted. (Retention in accordance with the Email Service Definition)

The below 2 methods will assist in trying to restore deleted items depending on whether the item is still in the Deleted Items folder or not.


Microsoft Outlook – Recover items from the Deleted Items folder
  1. Open Microsoft Outlook
  2. Browse and select the Deleted Items folder from the left-hand side menu
  3. Right click on the email/ calendar item you wish to recover
  4. Select Move to Folder
  5. Select the folder where you need the mail to be recovered to
  6. Click on Move​

If the required email/ calendar item is NOT found in the Deleted Items folder;

  1. Open Microsoft Outlook
  2. Browse and select the Deleted Items folder from the left-hand side menu
  3. Right click on the email/ calendar item you wish to recover
  4. Switch to the Home tab
  5. Click on Recover Deleted Items from Server
  6. Click on the items you want to recover
  7. Select Recover Selected Items
  8. Click OK​

NOTE: This works only if the item was deleted within the retention period. Once an item is recovered, it will automatically be placed under the Deleted Items folder


Outlook on the web – Recover items from the Deleted Items folder​
  1. Login into your email account/ generic mailbox
  2. Browse and select the Deleted Items folder from the left-hand side menu
  3. Right click on the email/ calendar item you wish to recover
  4. Select Move to a different folder
  5. Select the folder where you need the mail to be recovered to
  6. Click on Move​

If the required email/ calendar item is NOT found in the Deleted Items folder;

  1. Login into your email account/ generic mailbox
  2. Browse and select the Deleted Items folder from the left-hand side menu
  3. Click on the Recover deleted items found on top of the emails list​
  4. Select the required email you wish to recover and select Recover

NOTE: This works only if the item was deleted within the retention period. Once an item is recovered, it will automatically be placed under the Deleted Items folder​

How do I set an Automatic Out Of Office Reply?

Right Click → ‘Copy Link Address’

If you will not be able to read incoming emails of your personal mailbox (e.g. you will be on vacation leave) it is good practice to set a message to notify people who send you an email that you will not be available.


Microsoft Outlook 365
  • ​Open Microsoft Outlook 365
  • Click File
  • Under Info select Automatic Replies
  • In the Out of Office Assistant dialog box, click Send automatic replies.
  • Click on Only Send during this time range: and set the dates and time as requested
  • In the text box, type the message that you want to send while you are out of the office
  • Click on Outside My Organization tab and repeat the same settings and text

Outlook on the Web

Once you login into your email account/ generic mailbox, click on the ‘gear icon’, and select Automatic replies

A new window prompts;

  1. Tick the Send automatic replies

  2. ​Should you require to set a starting date and a finishing date of when such automatic replies are sent, check the ​Send replies only during this time period and select the dates and time
  3. Type in the required message in the specified fields as shown below. Should you require automatic replies to be send also to external organisations check the ​Send automatic reply messages to senders outside my organisation

  4. Click on  to save the automatic replies.
How do I set Forwarding and Redirection?

Right Click → ‘Copy Link Address’

NOTE: Setting up a redirection rule to any non-Government mailbox is strictly prohibited as section 35 of the GMICT – Electronic Mail Policy.

Sometimes it might be required to auto forward (i.e. automatically forward) emails to another mailbox.  While forwarding to a third party email is usually not allowed for security reasons (click here for more details on Mail Forwarding to a Third Party Mailbox if you have a business reason to do so), below you can find guidelines on how to go about it for transferring emails to other gov mailboxes.

By using a rule, any received email message that match conditions specified in the rule can be forwarded or redirected to another email account. Usually it is required that all email messages are automatically forwarded (auto forwarded) to another recipient.

One must first understand that there are two different ways how messages are sent to another mailbox.

  • Message forwarding: When a rule automatically forwards a message that you receive, the rule adds the designation “FW:” to the beginning of the Subject line, changes the message formatting, and forwards the message to the account specified by the rule. The recipient represented by the account sees that the message came from you. A copy of the message you received is left in your Inbox or in the folder to which the message was originally delivered.
  • Message redirection: When a rule automatically redirects a message that you receive, the rule sends the message, unchanged, to the account specified by the rule. To the recipient, the message appears as though it came directly from the original sender. There is no indication that the message was delivered by way of your account. A copy of the message you received is left in your Inbox or in the folder to which the message was originally delivered
​Follow the below instructions to set forwarding/ redirection on;

Microsoft Outlook Client 
  1. Click the File menu, Info and select Manage Rules and Alerts
  2. Click on New Rule
  3. Under Start from a blank rule click Apply rule on messages I receive, and then click Next.
  4. Under Select condition(s) select the check box next to each condition that you want the incoming message to match and then click Next. E.g. where my name is in the To or Cc box and where my name is not in the To box
  5. Under Select action(s) select forward it to people or distribution list / redirect it to people or distribution list (depending on whether you wish to forward or redirect emails – refer to description further above)
  6. Under  Edit the rule description click the underlined value that corresponds to the condition (in this case people or distribution list), and then select/search for the mailbox to which you want mails to be forwarded to. Click Next twice.
  7. Fill in the rule name as required in the Specify a name for this rule.
  8. To run this rule on the messages that are already in your folders check the Run this rule now on messages already in … check box. To apply this rule to all your e-mail accounts and inboxes, select the Create this rule on all accounts check box. This option is greyed out if you do not have more than one e-mail account or Inbox.
  9. Click on Finish

Microsoft Outlook on the web (webmail)
Once you login into your email account/ generic mailbox, click on the ‘gear icon’ and select Options

A new window prompts, on the left side menu, click on Inbox and sweep rules
 
  1. Click on the  icon
  2. Fill in the required information as per below;
    1. Name: Type in a name to identify the rule (i.e. Auto Forward E-mails)
    2. Condition: Select, My name is > in to the To or Cc line
    3. Action: Forward, redirect, or send > Forward the message to… or Redirect the message to…
      1. A new windows will prompt, type in the email address you want to forward the messages to as per below
      2. Click Save

d.     Untick Stop processing more rules

The rule conditions and actions should be similar below;
 

3. Click  button to save the rule​

How do I set my Email Signature in Microsoft Outlook?

Right Click → ‘Copy Link Address’

In an effort to consolidate the corporate government image, an initiative has been triggered to install standard image signatures across all government users.  The below scripts have been compiled to work both on workstations connected to a MITA managed domain and on personal workstations running Windows OS using a third party internet connection.​

To set your email signature for Microsoft Outlook 365 on a Windows workstation please open the appropriate zip file and double click on the script within the zipped file.  If you have a Mac workstation please click here to follow the instructions how to set the signature manually.

After executing the script, the new email signature will automatically be installed on the workstation you are using. If you need to set your signature on other workstations you need to repeat the process from those workstations. Note that the signature will only be visible when using the Microsoft Outlook client. The signature will not be visible when the email is accessed via webmail (webmail.gov.mt).

NOTE: For the signature script to work Microsoft Outlook must be set to send emails as HTML (not Text). This can be checked from the Tools Menu – Outlook Options – Mail tab – Compose messages section. Government workstations have this configured by default. It is also important that the latest MS Office service packs are installed for the signature to work properly.

If changes within your details are necessary, kindly contact your respective IMU or IT Department.


If your mailbox has been migrated to the cloud while on the license of E3/E5, when setting a signature on Outlook Classic, it will automatically replicate itself on Cloud Webmail (https://outlook.office.com/) and eventually Outlook New.


Below is a list of the available signatures for Government Departments and further below for Ministry Secretariat /  Private Secretariat.  At the bottom of the page are the signature for Government Entities.  Click on the respective link pertaining to your organisation & department / secretariat to download the zip file with the script to modify your signature.

​Organisation AbbreviationOrganisation Full Name​Download Link
HORParliament of Malta – HORClick here​
MALMinistry for Accommodation and LandsClick here
MAFFMinistry for Agriculture, Fisheries and Food SupplyClick here
MACHMinistry for Arts, Culture and National HeritageClick here​
MEERMinistry for Energy, the Environment and the Regeneration of the Grand HarbourClick here
​METPMinistry for the Economy, Technology and Strategic ProjectsClick here
MESMinistry for Education and SportClick here
MERMinistry for Equality and Civil RightsClick here
MFEAMinistry for Foreign and European AffairsClick here​
MFDC​​​​​​​​​​​​​​​​​​​​​Ministry for European Funds, Social Dialogue and Consumer ProtectionClick here
MFFMinistry for FinanceClick here​
ODPM​​​​​​​​​​​​​​​​​​​Office of the Deputy Prime Minister and Ministry for Health (Excluding MDH)Click here
ODPM​​​​​​​​​​​​​​​​​​​Office of the Deputy Prime Minister and Ministry for Health (Mater Dei Hospital)Click here​
MJRIMinistry for Justice, Research and InnovationClick here
MLGPMinistry for Local Government and Public WorksClick here
​MFG​Ministry for GozoClick here​
MHSMinistry for Home Affairs and SecurityClick here​
​MSAAMinistry for Social and Affordable AccommodationClick here
​MFTMinistry for TourismClick here
MTIPMinistry for Transport, Infrastructure And Public WorksClick here
MIVMinistry for Inclusion And The Voluntary SectorClick here
MIPEMinistry for Infrastructure, Planning and EmploymentClick here
MSFMinistry for Social Policy and the FamilyClick here
MSMMinistry for Sustainable MobilityClick here
MYWIMinistry for Youth, Wellbeing and the Implementation of the Electoral ProgrammeClick here
​OPM​Cabinet Office​Click here
​OPMElectoral Office​​​Contact IT support
​OPM​All OPM Departments except the above​​Click here
OPM​Manual Signature
(Officers will be asked to input details manually)​
Click here​
OPM-ESEquality, Reforms and Social DialogueClick here
​OPROffice of the PresidentClick here
​OPR – CSJCommissioner for Standards of the JudiciaryClick here
Non-CORP joined workstationManual Signature
(Officers will be asked to input details manually)
Click here​
​Organisation​​Secretariat​Download Link
​All​Ministry Secretariat /  Private SecretariatClick here
​Abbreviation​​Government Entity Name​Download Link
AFMArmed Forces of MaltaClick here​​​​
​Agenzija Sapport​Agenzija Sapport​Click here​​​​
ARBAsset Recovery BureauClick here
ARMAquatic Resources MaltaClick here
ARUCAuthority on the Responsible Use of CannabisClick here​​​​
AWASAgency for the Welfare of Asylum SeekersClick here​​​​
BABroadcasting AuthorityClick here​​​​
BAAIBureau Of Air Accident InvestigationClick here
CAAClimate Action AuthorityClick here
CEMaltaCircular Economy MaltaClick here​
CGBVDVCommission on Gender-Based Violence and Domestic ViolenceClick here
​CFCCommissioner For Children​​Click here​​
RAMRiżorsi Agrikoli MaltaClick here
CSACorrectional Services AgencyClick here
​PPL​Projects Plus Ltd​Click here​​​​
​EUPAEuropean Union Programmes Agency​Click here​​​​
​MPOMalta Philharmonic OrchestraClick here​​​​
​ArchivesNational ArchivesClick here​​​​
MICASMalta International Contemporary Arts SpaceClick here​​​​
SCHSuperintendence of Cultural HeritageClick here​​​​
FKFondazzjoni Kreattivita’Click here​​​​
PTRPjazza Teatru RjalClick here​​​​
VCAValletta Cultural AgencyClick here​​​​
GHRCGrand Harbour Regeneration Corporation(GHRC)Click here​​​​
ACM​​Arts Council MaltaClick here​​​​​​
​BCA​Building & Construction AgencyClick here​​​​​​​
​Court ServicesCourt Services Agency ​Click here
DSADetention Services AgencyClick here
​ELTCEnglish Language Teaching Council​Click here​
​ERAEnvironment & Resources Authority​Click here​
EWAThe Energy and Water AgencyClick here
FITA​Foundation for Information Technology AccessibilityClick here​
FSSA​Food Safety and Security AuthorityClick here​
FMFestivals MaltaClick here
FMSFoundation For Medical ServicesClick here
HA​Housing Authority​Click here​​
​HMHeritage Malta​​​Click here​
Identita​Identita​Click here​
IEInstitute for EducationClick here
IPAInternational Protection AgencyClick here
​ITS​Institute Of Tourism Studies​​Click here
Jobsplus​Jobsplus​Click here​​
JO​Joint Office​Click here​​
​JU​JudiciaryClick here
LAMLegal Aid MaltaClick here
LCLocal CouncilsClick here
LESA​​Local Enforcement​ System AgencyClick here​
LRA​Land Registration AgencyClick here​
​KF​Kottonera FoundationClick here​
KMKor MaltaClick here
MACMalta Arbitration CentreClick here
​Malta Libraries​​Malta Libraries​Click here​
MBR​​Malta Business RegistryClick here​
MCCAA​Malta Competition and Consumer Affairs Authority​Click here​
​MCESD​Malta Council For Economic and Social DevelopmentClick here
​MDBMalta Development Bank​​Click here​​
MFAMalta Food AgencyClick here
MFAC​Malta Fiscal Advisory Council​Click here​
MFC​​Malta Freeport CorporationClick here​
MFC​Malta Film Commission​​​Click here​
MFWSThe Malta Foundation for the wellbeing of SocietyClick here​
​MGA​Malta Gaming Authority​Click here
​MGI​Malta Government Investments​​Click here​
​​MIMCOLMalta Investment Management Company Limited​Click here​
​​​​​MITA​Malta Information Technology Agency​​Click here
NAONational Audit OfficeClick here
NCCNational Coordinating Committee on Combating Money Laundering & Funding of TerrorismClick here
​NDSFNational Development and Social Fund​​​Click here​​
OAFSOffice Of The Arbiter For Financial Services​​​Click here​
​OAGOffice Of The Attorney GeneralClick here
PGProject GreenClick here
PGLProjects Gozo LtdClick here
​PSC​Public Service Commission​Click here
​PMA​Property Market Agency​Click here
RGFResponsible Gaming FoundationClick here
SA​Office of the State Advocate​Click here​​
​​​​SCSASocial Care Standards Authority​Click here​​
Servizz.Gov​Servizz.Gov​ (Agents only)Click here​
Servizz.Gov​Servizz.Gov​ (Head Office)Click here​
​Teatru Manoel​Teatru Manoel​​Click here
TMTransport MaltaClick here
VSAVictim Support AgencyClick here
How do I set my Email Signature on Mac OS?

Right Click → ‘Copy Link Address’

The scripts provided here that facilitate the configuration of a standard signature are written for Windows operating system and thus are not compatible with Mac OS workstation.  For Mac these have to be set manually as explained below.

  1. Copy the signature from someone else who has an identical signature (highlight the required text and images, and press the cmd and c keys simultaneously.  The safest is to use an email from someone within your section (who has set his signature using the respective script).
  2. Open Outlook for Mac and go to Outlook menu – Preferences.
  3. A window will open with a number of icons.  Click on the Show All button and then click on the Signatures icon from the Email section.  A new window will open.
  4. Click on the plus (+) icon at the left hand side of the window.  Double click on “Untitled” to give your signature a description.  This description is for your information only and will not be seen by the recipients.
  5. In the signature area (right top part of the window) remove any text that might be present and paste the signature previously copied by pressing the command and v keys simultaneously.
  6. Due to compatibility issues between MS Office for windows and Office for Mac you might need to rearrange some items.  In some cases it might be better to paste the copied signature in Word, switch on the table borders, arrange the items from Word itself and then switch off the borders and copy the signature again from Word.
  7. From the Choose default signature dropdowns, select your government email in the Account dropdown and your new signature for both New messages and Replies/forwards dropdowns.
How do I set my Email Signature on Webmail?

Right Click → ‘Copy Link Address’

How to Configure the Email Signature on Webmail

Open an internet browser and open https:\\webmail.gov.mt (Sign in with your CORP credentials if prompted)

Find an email with a signature identical to the one you wish to have. This could be an email of yours, that you have sent with a signature configured from Outlook, or else an email received from someone else within your section, who has set their signature using the respective script as described here.

Select the signature from the chosen email, right click on it and copy it as shown below.

Click on the Settings symbol found at the top right, as shown below and select Options

Click on Email Signature from the menu on the left-hand side and paste the signature in the box shown below.

If the signature copied, was your own, you can click on Save from the top. However, if the signature copied belonged to someone else, you may modify the details to reflect your own and then Save it once finished.

Once the above is complete click on from the top left to go back to your emails.

How do I set my Generic Mailbox Email Signature?

Right Click → ‘Copy Link Address’

How to Configure the Email Signature for a Generic Mailbox

NOTE: To create a signature for a generic mailbox you must first have your personal mailbox one configured.

Open Outlook and click on New Email.

Then go to Signature and Signatures…

The following window should appear and click on New.

Type a name for your signature in the dialog field and click OK.

(In the example shown the signature was named Generic Mailbox)

The name chosen should now appear in the box at the top left of your window, just below your CORP username.

Click on your CORP username and select the entire signature from the bottom window. Right click on it and select copy.

Click on the generic mailbox signature name that you created from the top left (1) and right click (2) to paste your signature in the box at the bottom (3) as shown in the following screenshot.

After your signature is pasted, modify the details of the signature to reflect those of the generic mailbox. Once finished click on OK.

After completing the previous step, the generic mailbox signature has been created and configured.

When you require to send an email from your generic mailbox using its respective signature you may do so by clicking on

Go to Signature and select your generic mailbox signature

The generic mailbox signature which you have created should now appear for you to use.

How do I set my Personal Mailbox Email Signature?

Right Click → ‘Copy Link Address’

The information listed below, explain how you can download and configure your email signature.

NOTE: To be able to download and configure an email signature using the mentioned scripts, you must have access to an Outlook application from a Windows operating system, either by having a local installation (such as Office 2016) or else be in possession of an Office E3 license or higher. If you access your mailbox using webmail.gov.mt or Outlook on Mac OS, you may copy the signature from your Outlook or from someone else who has an identical signature. The safest is to use an email from someone within your section (who has set their signature using the respective script). Click WebmailGeneric Mailbox or Mac OS for more information on how you can set your signature for webmail.gov.mt, generic mailbox or Mac OS.


How to Configure the Email Signature for a Personal Mailbox

Click on the following link (which will open for you in a separate tab) and scroll down until you reach the ‘Email – How do I set my Email Signature in Microsoft Outlook?’ section as displayed below:

If you scroll down a bit further a three-part list will be visible consisting of all the signatures that are available for download. The first being those pertaining to the Government Departments, the second for the Ministry Secretariat / Private Secretariat and lastly the signatures for the Government Entities. Depending on your place of work, once you identify the correct signature to be used, you may click on the ‘Click Here’ adjacent to it for the signature script to download. (MITA’s signature will be used as an example)

One of the zip files screenshotted below will be downloaded.

NOTE: Irrespective of whichever zip file was downloaded for you, the same steps apply.

Once the download is complete, kindly navigate to the downloads folder and click on the zip file.

Open the VBScript Script File found inside, and the below screen should appear. Click Open.

If it prompts you to enter your details such as your Mobile Number, you may do so or leave blank if not required and click OK.

The following screen should now appear indicating that you have succeeded to configure the signature for your personal mailbox. Click OK.

As indicated by the next window, close your Outlook and re-open it. Your email signature should now be visible when writing a new email, and when replying to or forwarding an email.

If you click on New Email and any of your signature details appear incorrectly,

you may modify them by going to Signature and Signatures…

The below window will appear where you may modify your signature from the bottom window. When you are satisfied with how your signature appears, click on OK. Close the New Email window and re-open it.

The Signature should now be how you modified it.

NOTE: If the incorrect details were any of the following: Name, Position, Section, Office, or Department, kindly liaise with your IMU / IT section to raise an RFS to correct them for you in your CORP account. If your telephone number was incorrect, you may correct it from https://rfs.gov.mt/MyAccount. Should you encounter any difficulty and not manage to update it yourself, your IMU / IT section can also raise an RFS on your behalf.

How do I set up and backup an Offline mailbox (archive) in Outlook?

Right Click → ‘Copy Link Address’

How to configure Offline mail in Outlook

The online mailbox has limited capacity to store emails (including attachments) and calendar appointments.  To learn how you can check your mailbox size click here. Where Microsoft Outlook is being used it has the facility to set an offline folder pst file to allow you to move items from the online mailbox to an offline file.

NOTE: Refer to Email – Recommendations Of Use for recommendations on maximum size of .pst file.


To create a new offline mail (archive) in Microsoft Outlook carry out the following steps:
  • Open Microsoft Outlook
  • Click on File and under Info Select Account Setting
  • Select Account Settings
  • Account Settings window will open
  • Select the Second Tab called Data Files
  • Click on Add..
  • Create or Open Outlook Data File will open
  • Select the destination of where you want to create the Offline mail (This location will be needed to back up the Offline mail)
  • Type in a File name of your choice
  • Click OK
  • Click Close
  • Offline mail will be visible in the side view of Outlook​

If you already have an existing offline mail (archive) pst file and you want to configure Outlook to view it perform the following steps:
  • Open Microsoft Outlook
  • Click on File and under Info Select Account Setting
  • Select Account Settings
  • Account Settings window will open
  • Select the Second Tab called Data Files
  • Click on Add..​
  • Provide the location and name of the pst file in which the offline mail is stored. Usually this is stored on your workstation hard disk.  If the offline mail is stored on a pen drive or a CD it is advisable to copy it to the local hard disk before you proceed.
  • Click OK
  • Click Close
  • Offline mail will be visible in the side view of Outlook​

If you want to back up an existing offline mail (archive) pst file do the following:​
  • Open Microsoft Outlook
  • Click on File and under Info Select Account Setting
  • Select Account Settings
  • Account Settings window will open
  • Select the Second Tab called Data Files
  • Click on the required offline (archive) pst file to be backed up and click on the icon with the yellow folder called Open File Location.. 
  • This will open a Windows folder where the offline (archive) pst file is located
  • CLOSE MICROSOFT OUTLOOK – this is important since if you will not close it the backup will not be performed correctly
  • Right click on the required pst file and select Copy
  • Navigate to locate the destination folder where you wish to back up the file (e.g. Pen Drive)
  • Right click in a blank area in the destination folder and select Paste​

NOTE: When items are deleted from offline mail, the file size of the offline mail does not automatically reduce.  Sometimes it may be a problem to copy large files to a pen drive, so the following steps might be useful to try to reduce the offline file size.  Always make a copy of the offline mail before you attempt this procedure:​

  • From the File Menu Click Account Settings and select Account Settings
  • From the Data Files tab, click on the data file you want to compact, and then click Settings
  • Click on Compact Now
How do I set up email Tracking Options?

Right Click → ‘Copy Link Address’

A delivery receipt tells you that an email message  was delivered to the recipient’s mailbox, but not whether  the recipient has seen it or read it. A read receipt tells you that message was opened. In both cases,  you receive a message  notification in your Inbox.


Microsoft Outlook 365
  1. Click the File tab
  2. Select Options
  3. Click Mail
  4. Under Tracking, select the Delivery receipt confirming the message was delivered to the recipient`s e-mail server or Read receipt confirming the recipient viewed the message check box.
How do I set up Microsoft Outlook for Mac OS?

Right Click → ‘Copy Link Address’

To set up Office Outlook 365 on macOS, you can follow these steps:


How to setup a Personal Mailbox
  1. When you first launch the Outlook app for the first time, the below window will appear, kindly click on Add Email Account

2.  Type your personal gov email address and click Continue

3. In the following window input the details as follows and click on Add Account

Method: Username and Password

Email Address: [email protected] (your gov email address)

DOMAIN\username or Email Address: corp\surnn001 (your corp\username)

Password: Your password

4. Click Done.

How do I share my Calendar to 3rd Party Apps on Mobile?

Right Click → ‘Copy Link Address’

To share your Outlook Calendar with other applications (Google Calendar, Native Calendar App) carry out the steps of one of the following methods:


Sharing Outlook Calendar to 3rd party apps on Android
  1. Set up your Outlook app on your phone using the following this FAQ
  2. Configuring Outlook’s settings
    1. Tap on your Profile picture located either top left or bottom left
    2. Tap on the Settings Icon
    3. Scroll to Calendar and tap on it
    4. Enable ‘Sync Calendars’ if prompted to allow access to your calendar, tap yes
  3. Go into your 3rd party application and check if the calendar has synced, if the calendar hasn’t synced follow the below steps
    1. Check that the account has been added to the app, usually found under ‘Manage Accounts’
    2. Make sure that the calendar is enabled from the side panel

Sharing Outlook Calendar to 3rd party apps on iOS

To set up calendar apps you require to sign into the native mail app using your government email.

  1. Set up your Mail app with your government email using the following this FAQ
  2. Go into your 3rd party application and check if the calendar has synced, if the calendar hasn’t synced follow the below steps
    1. Check that the account has been added to the app, usually found under ‘Manage Accounts’
    2. Make sure that the calendar is enabled from the side panel

Disclaimer: Third-party applications (including Google Calendar and Native Calendar Apps) are not directly supported by MITA. While the provided instructions aim to assist with integration, MITA cannot guarantee full compatibility or provide technical support for these third-party tools. Please refer to the support resources of the respective applications for further assistance.

How do I share my Calendar?

Right Click → ‘Copy Link Address’

To share your government Calendar with other users carry out the steps of one of the following methods:


Sharing a Calendar in Microsoft Outlook 365
  1. Open Microsoft Outlook​
  2. Click on the calendar icon found at the bottom of the screen​​
  3. Under the Home tab, click on Share Calendar
  4. Type in the ​recipient’s email address of who require access to the calendar
  5. Select the type of permissions using the drop down menu. Each permission is followed by an explanation​.
  6. Click Send

An email will be sent containing the invitation of the calendar. The recipient/s who has been given permissions need to follow the below procedure in order to access calendar:

  1. Open Microsoft Outlook
  2. Browse and open the email with the calendar invitation 
  3. Click on Open this Calendar

  4. The new shared calendar will be visible under ​My Calendars


Stop sharing Calendar in Microsoft Outlook 365
  1. Open Microsoft Outlook
  2. Click on the calendar icon found in the bottom of the screen​​
  3. Under the Home tab, click on Calendar Permissions

  4. Select the recipient you wish to stop sharing to and click on Remove

  5. Click Apply and OK

Sharing a Calendar in Microsoft Outlook on the web
  1. Login into your email account/ generic mailbox, click on the ‘functions’ button and select Calendar

  2. Click on the Share button
  3. Type in the recipient email address in the Share with: field and press Enter
  4. Select the type of permissions required using the drop down menu

  5. Click Send

An email will be sent containing the invitation of the calendar. The recipient/s who has been given permissions need to follow the below procedure in order to access calendar:

  1. Login into your email account/ generic mailbox.
  2. Browse and open the email with the calendar invitation 
  3. Click on the Accept button
  4. Calendar will be listed under Other Calendars


Stop sharing a Calendar in Microsoft Outlook on the web
  1. Login into your email account/ generic mailbox, click on the ‘functions’ button and select Calendar​

  2. Under Your Calendars, right click Calendar and select Permissions…

  3. A side window will open, next to recipient you wish to stop sharing the calendar with, click on the ‘cross icon’ to stop sharing
  4. Click Save
How do I turn Cached Exchange Mode on or off?

Right Click → ‘Copy Link Address’

Use Cached Exchange Mode to work with emails even when your network connection is slow or unavailable.

NOTE: When using Outlook with a Microsoft 365 mailbox, we recommend always using Cached Exchange Mode.


About Cached Exchange Mode

Cached Exchange Mode enables a better experience, in this mode, a copy of your mailbox is saved on your computer. This copy provides quick access to your data, and it is frequently updated with the server that runs Microsoft Exchange.

Notes: 

  • Cached Exchange Mode is the default when you add an Exchange or Microsoft 365 account.
  • We recommend always using Cached Exchange Mode with an Exchange or Microsoft 365 account.
  • Outlook.com accounts default to Cached Exchange Mode and cannot be changed.

Turn Cached Exchange Mode on or off
  1. Click File > Account Settings > Account Settings.Account Settings in the Backstage view
  2. Click the Exchange or Microsoft 365, and then click Change.Change command in the Account Settings dialog box
  3. Under Offline Settings, check Use Cached Exchange Mode.Use Cached Exchange Mode check box in the Change Account dialog box
    OR

Account setup dialog, Exchange Account Settings page.

4. Exit, and then restart Outlook.

If you want to turn off Cached Exchange Mode, repeat the steps, but clear Use Cached Exchange Mode.

By default, 12 months of your email is available offline, but you can control how much mail is kept offline by changing the slider.

How do I use Mail Merge?

Right Click → ‘Copy Link Address’

Using Microsoft Word, one can send an email to multiple individuals separately, by utilizing the Mail Merge functionality in conjunction with Microsoft Outlook. The Mail Merge will send the emails from the default mailbox of your Outlook profile, which is currently open. Hence, if you make use of multiple Outlook Profiles, make sure that the default mailbox open is the one you wish to send your emails from. This functionality is not available on webmail or from mobile devices.

To use this option kindly perform the following steps:

  1. Open Microsoft Outlook and if prompted, select the Profile you wish to send your emails from.

2. Open the Microsoft Word document with the email contents you wish to send or else, you may open a new blank document and type in the contents at a later stage.

3. From the ribbon at the top, select Mailings (marked in red)

4. Click on Start Mail Merge and select E-mail Messages

NOTE: From this point onwards, you may formulate the email contents you wish to send.

5. Click on Select Recipients

The below 3 options should appear. Kindly proceed from the indicated step, according to your preferred option.

6. If you click on Type a New List… the below window will appear:

Here, you have the flexibility to customize the columns of your recipients depending on what information you require about them such as, their Title, First Name, Last Name, Email Address and more from the customize columns button. Once you select the preferred columns, you may proceed to enter the data of your recipients as screenshotted below.

Upon inputting all the recipients in the New Address List dialogue box, click on OK. At this stage you will be prompted to Save your Address List on your computer, where you are able to name it as you like and save it in your preferred location. You may skip to step 9.

7. If you click on Use an Existing List… the following window will appear, where you can locate your pre-existing address list and open it. Once opened, you may skip to step 9.

8. If you click on Choose from Outlook Contacts… the below window will appear where you are prompted to choose a contacts folder to import.

Once selected, the following screen will show where you can modify your contacts list as explained in the window itself and click OK. Continue from Step 9.

9. The Mail Merge functionality allows you to use fields from the Address List, to personalize each individual email. You can do this by clicking on the Insert Merge Field button in the ribbon. This will display all the data fields you may use in your email content.

For instance, if you choose «First_Name» «Last_Name» and place them in the email content, in the email sent, the recipient will read their full name.

Mail MergeEmail Received by recipient

To test the fields chosen, you may click on Preview Results (marked in red) to check that the correct fields are being shown. You may go through all the emails by using the arrows marked in green.

10. Once the email content is complete you may proceed to click on Finish & Merge and Select Send Email Messages.

11. The below window will appear, where you are prompted to select the field containing the email addresses in the To: field and to type the Subject of the email in the Subject line: field.

Within the Send records section, you may select whether to send the email to All, the currently shown record, or select the records required using the From: and To: options. Once all the fields are filled, kindly click on OK.  The emails will now be sent.

How do I use Webmail for Personal or Generic accounts?

Right Click → ‘Copy Link Address’

The Email service provided by MITA offers the Outlook on the Web facility, also known as webmail.  This is a feature that allows users to access it from a web browser from any location or from your personal PC / Laptop (not just from work) as long as an internet connection is available.  One has to keep in mind that offline emails are only available on the workstation where they were set and are not available through this facility.

Although Outlook on the Web is accessible from most browsers, including from mobile devices, there might be some limitations depending which operating system and browser version you are using.  More information on these limitations can be found here.

If your device / operating system are not fully compatible you will use the OWA light version.  To know which features are not available in the light version please click here.


Logging In to Outlook on the web

To use the webmail service, open an internet browser of your choice and type the following in the URL: https://webmail.gov.mt

The below page will be displayed and will ask to login using your government credentials (Government Email Address and password).

 

Email Address:          Your Government Email Address (e.g. [email protected])
Password:                  Your domain password.


Accessing a Generic Mailbox using Outlook on the web (On Computer/ Laptop)

Login to https://webmail.gov.mt (as explained above) using your government credentials. Once logged in to your email account;

  1. ​Click on the person icon found in the top right corner of the screen, and select Open another mailbox…

  2. Once selected, a new window will prompt. Enter the generic mailbox email address and click Open
  3. A new browser tab will automatically open the generic mailbox account

​​NOTE: You can only access generic mailboxes of which you have permissions to.


Composing and Sending a New Email

Once you login into your email account, make sure that the selected function is set as Mail. This can be confirmed by having Mail written in the top left corner of the ​screen

  1. Click on the  button and the below window will prompt, replacing the reading pane
  2. Below one can find the icons found in the ‘New Email’ window, further explained; (Kindly refer to the letters found in the image above)

a. To send the current email

b. To attach an item

c. To discard the current email

d. Other options (Such as Save Draft, Set Importance etc.)

e. To open the ‘New Email’ window in a separate window

f. To enter recipients email addresses

g. To enter recipients email addresses in Bcc

h. To enter recipients email addresses in Cc

i. To type in the email’s subject

j. To type in the email’s message

k. Font options

l. Most relevant shortcuts

m. To import a template which was saved earlier


Reading and Replying to Emails

Once you login into your email account, make sure that the selected function is set as Mail. This can be confirmed by having Mail written in the top left corner of the screen

You will be automatically re-directed to your inbox folder, where a set of new emails may be found as per below picture

Reading: Double click on the email which you may wish to read. This will prompt a new window expanding the selected email with more details.
Replying to Emails: Double click on the email which you may wish to reply. This will prompt a new window expanding the selected email with more details and actions.

​One of the actions found is the Reply all. Such action can be found in 2 buttons as shown as shown below. Select either Reply, Reply all or Forward depending on your needs;​

  • Reply: Will reply only to the sender
  • Reply all: Will reply to all recipients in the email
  • Forward: Will forward the whole email including attachments to a new recipient​


Logging Out from Outlook on the web

When you are done processing emails you should always log out of your session.  This is especially more important if you are using a shared workstation at work or a PC in public places.

To log out,

  1. ​Click on the ‘person icon’ found in the top right corner of the screen, and select Sign out
  2. Close all browser windows to ensure that your credential are not used in another session/ window and cannot be used by someone else.
How do I view my work email on my mobile?

Right Click → ‘Copy Link Address’

In order to access, your work email from your mobile, you may either open your browser and use https://webmail.gov.mt or else you may use an email Client application as described below.

For security and support purposes, users shall only connect to the respective mailbox/es using any one of the below authorised email Client applications:

Other email Client applications such as the Gmail app are not supported and are not recommended to be used.

How do I view Online Archive on my mobile?

Right Click → ‘Copy Link Address’

The Online Archive cannot be accessed through the mobile Outlook App. However, you can still view it using WebMail. For optimal access to the Online Archive, it’s crucial to use the website’s Desktop version. Additionally, please be aware that on WebMail, the Online Archive is referred to as the In-Place Archive, though the contents and folder structure remain the same.

Kindly follow the below steps:


If you are using the Google Chrome app (Android)
  1. Navigate to webmail.gov.mt
  2. Open the browser menu from the top right as shown below.

3. Select Desktop site to open  the site in Desktop mode.

4.The In-Place Archive will be visible on the left hand side. (You may need to zoom or pan around the screen to better view the emails).


If you are using the Safari app (iOS)
  1. Navigate to webmail.gov.mt
  2. Click on AA shown on the bottom right.

3. Select Request Desktop Website to open site in Desktop mode.

#

4.The In-Place Archive will be visible on the left hand side. (You may need to zoom or pan around the screen to better view the emails).

If my mailbox has cached mode enabled, what is the maximum file size (.ost) that I can have on my workstation?

Right Click → ‘Copy Link Address’

The .ost file should not exceed 50Gb. It is important to reduce the synchronization period if your mailbox if 50Gb or more. Kindly find below steps to reduce the synchronization period:

  1. Open Outlook → Select File → Account Setting → Account Settings. Once done, the below window will appear with your email address/es.
  2. Select the account you want to modify and click ‘Change’. Cache settings will show up.
  3. The ‘Download email for the past’ setting can be configured to lesser values.
  4. For example, the below screen shows the cache set to sync the past year’s data only. Once you have set the sync period, click next, done and then restart Outlook.

My mailbox has just been migrated to the cloud and I am experiencing issues

Right Click → ‘Copy Link Address’

If your mailbox has been migrated to the cloud, it is important for you to refer to and understand the end-to-end content of the Email Service – Cloud Service Description 5.2. This is because by using the Email Service on Cloud, you’re agreeing with this said document.

For further information or clarification kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected]

Potential issues that you may encounter soon after your mailbox has been migrated to the cloud include:

  • The importance of checking all aspects within 6 days from migration so as to be able to resort to on-premises restores on time.
  • Rules and policies currently applied to your on-premises mailbox, will need to be re-applied.
  • You may need to delete the Outlook profile (laptop and/or phone/tablet) and recreate it.
  • You may also need to reboot the workstation or mobile device to ensure Outlook points to the new service location.
  • Some mobile phone models may lose phone contacts and calendar entries. This should be sorted by allowing a few hours. However you should consider backing up the contacts beforehand if you have a specific phone brand (refer to the Email Service – Cloud Service Description 5.2.
My mailbox is planned to be migrated to the cloud. What information should I be made aware of?

Right Click → ‘Copy Link Address’

As your mailbox will be migrated to the cloud, it is important for you to refer to, understand, and agree with the end-to-end content of the Email Service – Cloud Service Description 5.2.

For further information or clarification kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected]

Amongst other things to look into before the migration date include:

  • Reduce the mailbox size as much as possible, using the Outlook policies with retention dates of either 2 years, 1 year, and 90 days. Such policies allow you to move emails from the mailbox to the Online Archive on the cloud.
  • Certain mobile phone models may be pre-configured to save your phone contacts to Outlook. You may wish to take a backup of these contacts before migration date. Click here for more information.
My mailbox was migrated to the cloud but now I cannot access it and the message says my mailbox does not exist.

Right Click → ‘Copy Link Address’

In this case, you may either use a different browser e.g. Microsoft Edge, or else access your mailbox via https://outlook.office.com/mail/

Outlook Support Matrix

Right Click → ‘Copy Link Address’

Find below the current support matrix for the versions of outlook, its licenses and the state of a mailbox Cloud vs On-Premise.

 Cloud MailboxOn-Premise Mailbox
LicenseOutlook ClassicOutlook WebOutlook NewOutlook MobileOutlook ClassicOutlook WebOutlook NewOutlook Mobile
E1Not availableRecommendedNot availableSupportedNot availableRecommendedNot availableSupported
F3
E3/E5RecommendedSupportedSupported – Limited FunctionalityRecommendedSupported
 
E1 – Email SignatureNot availableManual Copy & Paste SignatureManual Copy & Paste SignatureManual Copy & Paste SignatureNot availableManual Copy & Paste SignatureNot availableManual Copy & Paste Signature
F3 – Email SignatureNot available
E3/E5 – Email SignatureAutomatedAutomated (Sync from Outlook Classic)Automated (Sync from Outlook Classic)Automated
Remove an email account from Android Devices using the “Outlook” Application

Right Click → ‘Copy Link Address’

The below instructions only applies if you are using the Outlook application on Android Devices.

  1. Open the Microsoft Outlook application
  2. Click on the Exchange Icon, located at the top left-hand side

  3. Click on the Setting button at the bottom of the menu
  4. Click on the respective email account which you would like to have removed

  5. To double check that the account has been removed, repeat step 4 and 5
  6. Ensure that the Outlook account is no longer visible.
Remove an email account from Android Devices using the Native Application

Right Click → ‘Copy Link Address’

The below instructions only applies if you are using the Native email application on Android Devices.

  1. Navigate to the mobile Settings 
  2. Choose Accounts
  3. Click on the Account and select Remove Account

  4. Click on Remove Account
Remove an email account from iOS Devices using the "Outlook" Application

Right Click → ‘Copy Link Address’

The below instructions only applies if you are using the Outlook application on iOS Devices.

  1. Open the Microsoft Outlook application
  2. Click on the Exchange Icon, located at the top left-hand side

  3. Click on the Setting button at the bottom of the menu
  4. Click on the respective email account which you would like to have removed

  5. To double check that the account has been removed, repeat step 4 and 5
  6. Ensure that the Outlook account is no longer visible.
Remove an email account from iOS Devices using the Native Application

Right Click → ‘Copy Link Address’

The below instructions only applies if you are using the Native email application on iOS Devices.

  1. Open the device Settings from the Home Screen
  2. Tap on Mail
  3. Choose Accounts
  4. Click on the respective email account which you would like to have removed
  5. Click Delete Account

  6. Tap Delete from my iPhone
Securing Gadgets at the palm of your hand

Right Click → ‘Copy Link Address’

Accessing Government services is now closer to your fingertips. Most Government services are now accessible from any device or location and at any point in time. In this regard, we must ensure that security plays a vital role in protecting our identity as well as safeguarding the data that we are entrusted with. Ultimately, this data would hold information that are records of our citizens, including yours.

Protecting mobile devices especially when accessing Government’s services and data, must be considered as crucial. Failing to protect your device might lead to unauthorised access, which may result in compromising your data.  That is why MITA believes and constantly updates its systems and assets in order to continuously protect its infrastructure and data. To help in these practices, especially when using your mobile devices, you are required to do your part.

Please note that MITA only provides support to contracted devices.  It is expected that personal and mobile devices are supported through the users’ own support channels, if required.

Although standards are in place across the world, devices and different operating systems offer different varieties of security features. We encourage you to follow your vendors’ recommendation on which security best practices can be adopted from your end.

Furthermore, visit ncc-mita.gov.mt for tips on how to adopt cyber hygiene best practices within your daily lifestyle.

The below are some quick guides to start you off:

On your Device

  • Set a complex password, pin, passphrase or biometrics to access a device. Setting up at least two of these is a good start although other measures are required.
  • Use different passwords for different accounts. Using a variety of passwords will limit the extent of the breach just in case this happens.
  • Change your password, pin, passphrase frequently. Changing them regularly, makes them more secure and difficult to guess.
  • Download apps only from official stores. Downloading from official sources may keep malware apps away from your device.
  • Keep your Operating System and Apps updated. Updating to the latest versions apart from having the latest features, will mitigate vulnerabilities.
  • Don’t leave devices unattended. Having physical access to your device, facilitates cybercriminals to steal your data apart from the device itself.
  • Lock devices when not in use. Locking down your device prevents from accidental hits whilst keeping away trespassers. You may set your device to automatically lock after a period of inactivity.
  • Enable Multi Factor Authentication (MFA). Usernames and passwords on their own are not considered as secure and thus the recommended use of MFA. Adding an extra layer of security that sends you or requires a code generated on a previously determined device is also helpful.
  • Be cautious when Apps ask for permissions to phone’s photos, microphone, location and notifications. Giving access to necessary resources only and while in use, can offer some peace of mind.
  • Set privacy settings on your device. Hiding notifications if phone is locked, protects you from eavesdropping and stops others from accessing your information without you knowing.
  • Enable Apps’ permissions with caution. Only use the permissions necessary for your app to work.
  • Enable the track my device feature for tracking purposes. Tracking your device will help you find your device if you lose it or otherwise.
  • Enable the remote locking or wiping option after several incorrect logins. Attempting to access your mobile from your behind might give away your device but at least not to your data.

Your mindset

  • Never reply to unexpected messages or click/tap on links from unknown or unexpected sources. Replying to an unexpected message or clicking/tapping on erroneous links might lead you to become a ransomware or a phishing victim.
  • Use known Wi-Fi networks that are secure. Having access to Wi-Fi which is open does not mean that it is secure.
  • Limit the use of public Wi-Fi for non-sensitive data only. Accessing banking, personal information or corporate’s data over a public Wi-Fi is not recommended.
To check where your iPhone contacts are stored, follow these steps to check the default account

Right Click → ‘Copy Link Address’

Go to “Settings” on your iPhone.

Scroll down and tap on “Contacts.”

Tap on “Default Account.” This will show you the account where new contacts are saved by default, such as iCloud, Exchange, Gmail or another account.

The default account option is available only when the contacts option is selected:

Go to “Settings” > “Contacts” > “Accounts.”

Here, you can see all the accounts linked to your iPhone, such as iCloud, Gmail, Exchange, etc. Tapping on Exchange account will show whether the contacts are being synced from that account.

If you’re using Exchange for contacts, select “Exchange”

If the “Contacts” toggle is turned on, indicating that your contacts are stored and synced with the default account.

By following these steps, you can determine where your iPhone contacts are stored and managed.

What are Distribution Lists?

Right Click → ‘Copy Link Address’

An email distribution list is a group of contacts which you can choose as a single recipient. When an e-mail is sent to the specified distribution list, all the contacts in that list will receive a copy of the e-mail. It has to kept in mind that by default one can only send up to 200 recipients simultaneously. To increase this limit one has to apply for the non standard request to increase the Maximum Number of Recipients.

There are two types of distribution lists: server-side and a local distribution list.

Server-side email distribution lists are created, modified or deleted following an RFS request, and can only contain government e-mail addresses found on the email server. Such lists or groups are query based, meaning that the list is calculated on the fly based on a predetermined parameters (e.g. users’ organisation = ministry x). Examples of a server distribution list would contain the users within a specified department or for all the users within a specific ministry.

These lists can be used by anyone who has been authorised by an RFS, and can be used from any workstation that has outlook properly configured or from webmail.


Local email distribution lists can only be created through the client’s workstation (Outlook software or webmail), but can include email addresses from third party providers such as Gmail and Yahoo.

These lists can be only used by the person who has created them, and can be used from any workstation that has outlook properly configured or from webmail.

There are two main methods of creating a local distribution list, one is by inserting contacts manually through Outlook, and the other is by importing contacts from a file, for example Microsoft Excel.


Microsoft Outlook 365
  1. Open Outlook
  2. Under the Hom​e tab, Click New Items > More Items Contact group
  3. A new window will prompt;, type in a Name for the group
  4. Click on Add Members
  5. Choose on of the following;
    1. From Outlook Contacts (Select a contact saved locally in your contacts)
    2. From Address Book (Select contacts from the Global Address List)
    3. New E-mail Contact (To manually insert members)​
  6. Click Save & Close
What is the maximum email size that I can send or receive?

Right Click → ‘Copy Link Address’

The maximum message (email) size that can be sent/received is 20Mb. This includes attachments and what is referred to as message bloating which includes the headers and processing data added by the service while processing a message. Such bloating typically expands the message by 1.73% and therefore must be compensated for. This applies to any email, sent/received within Government or inbound/outbound.

What should I check if my mailbox is performing slowly?

Right Click → ‘Copy Link Address’

If you have a cloud mailbox and performance is not up to the required expectations, please check the below list before contacting MITA for support:

Migrating a mailbox to the cloud implies constantly communicating over the internet. At times, this results in slower performance. Before logging performance incidents/complaints, the Client shall determine whether the below parameters have been set/confirmed from their end:

  1. Good connection, ideally tested using Government wired or reliable wireless (not 3rd party connectivity or 4/5G)
  2. Cached-mode is enabled. OST file syncing all relevant mailboxes not to exceed 50Gb
  3. Mailbox size maintained or retention policies (as included in this document) are applied
  4. Ensure using the latest version of Outlook (Classic or New) including from mobile

Internet FAQs

How do I apply for Internet Additional Options?

Right Click → ‘Copy Link Address’

RFS are submitted by the respective IMU or IT department.  Any related cost is indicated within RFS Portal.

The below services can be applied for through the ​RFS Portalhttps://rfs.gov.mt

NOTE: Instructions of how to submit such services can be found in the ‘Resource Mgmt. – Other Services‘.


Additional Internet Packages

Business Justification: If the business needs require access to additional Internet Packages other than the Standard package provided with the Persona Package, one can apply for additional Internet Packages (Kindly communicate with your respective RFS loggers as to apply for these packages).


Internet Audit History Report

Business Justification: There might be cases when information about the internet activity made by a specific Internet account is required by the user’s superiors.  MITA offers the facility to request an audit history of Internet related activity.  The information provided includes the Internet address of sites accessed and the respective date and time stamp.  A standard report can generate information on the last 60 days of activity, while an ad-hoc report can also get older data.  The latter takes more time to compile.


Internet Reports

Standard Internet Report – Current & Previous Month

Ad-Hoc Internet Report – Older than the last 2 months

How do I apply for Internet Non-Standard Requests?

Right Click → ‘Copy Link Address’

Consideration should be given to all cases before non-standard request are made, ensuring that a valid business need for every request.  Such requests are submitted against a deviation from one or more policies or best practices. Additional charges might also be incurred to fulfil these requests.  In some instances, there might be additional risks and liabilities that will be carried by the respective user and/or department.

RFS are submitted by the respective IMU or IT department.  Any related cost is indicated within RFS Portal.

The below services can be applied for through the ​RFS Portalhttps://rfs.gov.mt


NOTE
: Instructions of how to submit such services can be found in the ‘Resource Mgmt. – Other Services‘.


​​​Access the Prohibitive Package

Business Justification: If your work requires you to access sites that fall under the Prohibitive Package, then the request can be made as below. The request is vetted and approved by the MITA Information Security Department before it is processed.


Unauthenticated Web Site

Business Justification:  Un-Authenticated sites contain pages that need to be be accessed by everyone on the Magnet without the need to have a MITA Internet Account. All sites that end .gov.mt are an example of such sites.  Due to the business nature of a particular site, there can be a need to have it accessible to all Government users i.e. make the site as un-authenticated. All requests are evaluated by the MITA Security Department and their final approval is required to process such requests.

NOTE: Users from within schools do not follow this process.

Deviation from policy content:  Electronic Mail and Internet Services Directive

How do I apply for the Internet Service?

Right Click → ‘Copy Link Address’

RFS are submitted by the respective IMU or IT department.  Any related cost is indicated within RFS Portal.


Internet Account

Business Justification: Internet is used to search and access information related to the line of business of the respective user.  All users who have a government email account are automatically granted standard internet access.

NOTE: Instructions of how to submit a new Persona Package can be found in the ‘RFS Users Guide‘.

How do I Subscribe to RSS Feeds?

Right Click → ‘Copy Link Address’

RSS (Rich Site Summary or Really Simple Syndication) is a service which provides a “feed” that is updated regularly. User can subscribe to an RSS feed to automatically receive the updated information.

RSS feeds can be viewed in different ways, with the easiest methods being the following – you can find more information on each method further below:

  • Use a web browser to surf the RSS feed page – this might require installing add-ons / extensions to the browser
  • Configure Microsoft Outlook to receive the information directly in the RSS feeds folder – you can then view them using Outlook.

Microsoft Outlook offers a built in RSS feed reader, which allows the user to easily view RSS Feeds. To configure RSS feeds in Microsoft Outlook kindly follow the below steps:


Subscribe to an RSS Feed from Outlook
  1. In Outlook, right-click the ‘RSS Feeds‘ or ‘RSS subscriptions‘ folder and choose Add a New RSS Feed.
  2. In the New RSS Feed dialog box, enter the URL of the RSS Feed.Enter the URL for the RSS Feed

    NOTE: If you need help finding the RSS feed URL on a website, look for an RSS icon. Button image Right-click that icon, and then copy the shortcut to the Clipboard. Press Ctrl+V to paste the information from the Clipboard into the RSS Feed location box.

  3. Choose Add > OK.

Remove an RSS Feed from Outlook

To remove an RSS Feed from Outlook, right-click the folder containing the RSS Feed and choose Delete folder. This action will unsubscribe you from the RSS Feed in Outlook.

NOTE: You can’t delete the default RSS Feeds folder from Outlook. But you can delete any subfolders that contain RSS feeds you’ve added.

You can also remove an RSS Feed through the Account Settings dialog box.

  1. Choose File > Account Settings > Account Settings.
  2. On the RSS Feeds tab, choose the RSS Feed you want to unsubscribe from, and then choose Remove.

NOTE: If you can’t remove an RSS Feed in Outlook, and you synchronized Outlook with the CFL, see Remove an RSS Feed that keeps reappearing in Outlook.

I am getting Page Blocked warning

Right Click → ‘Copy Link Address’

As explained in the Internet – Service Definition section, the Internet service provided by MITA includes a filter that groups websites into a set of categories.  Whenever you try to access a website that falls under a category for which you do not have access, the Government Internet Filtering page is shown with the Page Blocked message as below.  The category is shown similar to the screen shot below (outlined in red).

In these cases you need to apply for the additional Internet Packages (refer to the section Internet – How do I apply for Additional Options?). Kindly communicate with your respective RFS loggers as to apply for different packages should you believe you need access to the blocked web page.

 
​The below is a short list of popular websites that require additional Internet Packages to be accessed or to function properly:
Web Site​URL​Internet Package required
​​Facebookhttps://www.facebook.com/​​Standard Plus
​Drop Boxhttps://www.dropbox.com/​Standard Plus
We Transfer​https://www.wetransfer.com/​Standard Plus​​
Softpediahttp://www.softpedia.com/​Standard Plus​
Internet Recommendations of Use

Right Click → ‘Copy Link Address’

Like any other password, Internet account passwords should NOT be shared.  It has to be kept in mind that in the majority of the cases your internet password is also your email password, which makes sharing the password even worse.

The Internet account provided by MITA is a personal account, and the responsibility of such account relies on the Permitted User.  The GMICT Security Policy specifies that passwords should never be shared or stored in a visible location.  Additionally, the activity carried out be other users utilising a shared account will be attributed to the Account holder and s/he will be held responsible for such activity.


Disconnecting from the Internet
  • When using a Workstation that is shared by other persons it is good practice to disconnect and log off from the internet.  To logoff go to http://logoff.gov.mt/

Audio and Video Streaming

  • Audio and Video streaming takes up more bandwidth than a normal website, and for this reason special attention should be made when frequently accessing sites providing these services (e.g. sites allowing you to listen to radio or watch video clips).  There should be valid business requirements for individuals to access such sites
Internet Service Description

Right Click → ‘Copy Link Address’

RFS are submitted by the respective IMU or IT department.  Any related cost is indicated within RFS Portal.


Who is entitled for the Service?

All Government employees who make use of MITA’s email service are provided with a Persona package, which includes a domain (Corp) account, Standard Internet access and a Government Email Service. Most users authenticate the Internet Service automatically, once logged in to the workstation, using the Single Sign On (SSO) technology. Workstations not connected to the MAlta Government NETwork (MAGNET) must authenticate to the Internet by logging in to https://logon.gov.mt using the Corp domain credentials. Any additional internet packages are granted following requests via the RFS Portalhttps://rfs.gov.mt. This service is available only to sites that are connected to the MAGNET


Internet Packages
  • The Internet service provided by MITA offers a more secure browsing experience by regulating access according to the category of sites which a user is allowed to view.  This is facilitated by an industry standard web filtering back-end system that sets a specific category (or categories) for each web site.
  • Each internet user has access to one or more packages and each package can access a pre-defined list of categories. Thus, to be able to view a particular site the user must have the respective internet package that allows access to the category of the site being accessed.  To view the complete list of the categories that can be accessed by each package, kindly communicate with personnel that have access to the CIO Portal as to view the internet service catalogue.
  • It must be noted that MITA does not have control on these categories and although recommendations on incorrect categories can be made upon request, it is up to the discretion of the supplier to accept or discard such recommendations.  One must also keep in mind that it takes some time for new websites to be properly categorised by the system.
  • When a new internet account is created, the Standard Internet Access Package is given by default. Users can have further access by applying for additional Internet Packages (Kindly communicate with your respective RFS loggers as to apply for these packages) according to the business needs either during the account creation or at a later stage.
    • The following is the list of Internet Packages provided by MITA. Some of the Internet Packages, must be applied for RFS Portal.

NOTEThis list does not apply to users in schools since these have a different set-up managed by personnel from the ministry of Education).

​Internet Package Name   How to Apply
​Internet Standard​Provided b​y default as part of the Persona Package
​Internet Standard PlusRFS Portal
​Internet RestrictedRFS Portal
​Internet ProhibitiveRFS Portal
​No Internet
 
 

NOTE: Instructions of how to submit a new Persona Package can be found in the RFS Service Classification.

Most users authenticate the Internet Service automatically, once logged in to the workstation, using the Single Sign On (SSO) technology. However, users who are not connected to the MAlta Government NETwork (MAGNET) must authenticate to the Internet by logging in to https://logon.gov.mt using the Corp domain credentials.

The internet service is configured to request authentication after 12 hours from when the internet was initially accessed (i.e. credentials were provided to login) even if the connection is being used.

Internet Service Information

Right Click → ‘Copy Link Address’

The service provided by MITA offers Internet to users within Government Departments and several Government Entities.  The following is a list of features provided by this service:

  • Authentication using the CORP or Embassies domain login and password
  • Access of Internet from multiple workstations simultaneously using the same account
  • Internet Filter that blocks access to potentially harmful sites
  • Web sites grouped by categories to facilitate level of access
  • Security appliances in place to prevent illegal access to the government network from the internet
  • Caching of HTTP websites for improved performance

NOTE: The Internet filter for users within schools is managed by the Ministry of Education.

This Service targets a Service Level of 99.6% availability on a 24×7 basis. Note that this target Service Level excludes unavailability of other services, such as network and workstation, on which this service depends.  SLAs for requests are specific to the type of request as below.  Note that these SLAs are applicable during MITA Office Hours only.

 
​​​​​Request Description​​SLA
​Internet Access issue​s19 hours
​​​​Create / Modify / Delete Internet Account​1 working day
​​​Internet Filter issues (within MITA’s control)​​19 hours
​​Internet Performance Issues​19 hours
​​Generation of standard internet report​​5 days
​​Generation of ad-hoc Internet reports ​30 working days
 
Web page can't be displayed or not available

Right Click → ‘Copy Link Address’

Below are some basic troubleshooting steps to assist you in determining whether you have an internet related problem.

  • Ensure that you are logged on to the internet.  Type logon.gov.mt in the browser URL bar and if you are presented with a page to type in your credentials (user name and password) type them in, click on the Log In button and try to access the required web page again.
  • If you are able to access the Internet service but a particular web site is not accessible you can check if the web site is down by using free online services such as http://www.downforeveryoneorjustme.com/ which will tell you if the web site is down for everyone else, in which case you have to wait until the site owner / provider fixes the issue.
  • Try to use a different browser (if available) to see if the issue solves itself when using a different browser.
  • Try to clear the browser cache.  Click here to see how to clear Internet Explorer cache.

Network Services FAQs

All building does not have access to Network

Right Click → ‘Copy Link Address’

This could be the result of multiple issues. The most common one being power outage. To this effect, check that network equipment is switched on. If any of the below devices is switched on or issue persists after power is restored, kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected] so that we may log an incident and assist accordingly. 

Can I know on which network I am on?

Right Click → ‘Copy Link Address’

In order to figure out to which network you are connected to, the IP Address of your workstation is required. This can be obtained by opening a web browser such as Microsoft Edge, Google Chrome or Mozilla Firefox and browse to address https://myip.gov.mt. This website will display your workstation’s IP Address. You are only connected to the Government Network if this IP address starts with 10 or 172, otherwise you might be connected to a third party network which will not give you access to MAGNET services.

Gov-MT and Gov-MT Guest WIFI names are not showing or very poor signal.

Right Click → ‘Copy Link Address’

Make sure that you have a MITA managed Wi-Fi access point nearby. If there is a Wi-Fi access point available in the vicinity, make sure that it is powered on.

If you are next to the Wi-Fi access point and can confirm that the Wi-Fi is present on other devices, but not on your laptop, kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected] so that we may log an incident and assist accordingly. 

How can the LAN Procurement Framework be used to procure network equipment?

Right Click → ‘Copy Link Address’

The LAN Procurement Framework has been set to provide clients the opportunity to procure LAN equipment approved by MITA at reduced prices. Wired and wireless LAN equipment can be procured by accessing the online web portal and selecting the required LAN equipment. Portal is here

This portal can be used to calculate the expenses of procurement or to submit an order. In both cases, select the required LAN equipment from the available menus. When ready to place an order, make sure to upload separate LPOs (an LPO for wired devices and a separate LPO for wireless devices) and click submit. This will automatically send emails to supplier who will then contact you for logistics purposes.

How do I connect a firewall to MAGNET?

Right Click → ‘Copy Link Address’

Kindly follow diagrams below to connect a firewall to MAGNET. Ensure that the correct diagram is consulted based on the network connection type installed.

How do I request access to Systems over the Network?

Right Click → ‘Copy Link Address’

To secure the network infrastructure and the systems residing across government, access to systems is restricted according to use. To this effect, network access to systems (if not already available according to categorization and past network access requests) shall be requested through Network Access Configuration Request (from https://rfs.gov.mt), endorsed with the multi-access sheet. Following approval by internal stakeholders, network access configuration can then be carried out

How do I set an IP reservation?

Right Click → ‘Copy Link Address’

To reserve an IP address, please follow these steps that can found in the ‘Resource Mgmt. – Other Services‘ section of the RFS portal:

NOTE: You must have RFS logger rights to perform these steps.

  1. Navigate to Rfs.gov.mt.
  2. Select ‘Resource Management’ > ‘Other Services’.
  3. Search for your username and click ‘Create’.
  4. Click ‘Service picker’ (magnifying glass), then search for and select the service ‘IP Reservation’.
  5. Choose the radio button for ‘IP Reservation’.

For additional assistance, please contact the MITA Call Centre at 2599 2777, extension 1.

I am experiencing a slow connection. What can the issue be?

Right Click → ‘Copy Link Address’

If you are the only person experiencing slow connection on the network, you can check with your respective IMU that the workstation has adequate resources and that are not being exhausted. Performance issues can also be experienced due to an application, in which case, it may be ideal to contact the application owner.

On the other hand, should performance issues be noticed on the entire site network, it could be that the bandwidth available to site is being fully utilized. Use speed test available at https://speedtest.gov.mt to measure your network performance and liaise with your IMU accordingly to raise incidents required to initiate troubleshooting by MITA.

I am unable to browse internet websites although I’m able to access MITA service/websites

Right Click → ‘Copy Link Address’

This can happen when you are connected to the network, but not authorized to browse the internet (not authenticated with Single Sign On or SSO). You may authenticate to the internet by authenticating on https://logon.gov.mt.

Should the issue persist, make sure you are connected to the network ideally by cable (not wireless) and restart your laptop / PC. This will make your Windows authorization to take effect on your internet access.

If all the steps above have been performed and you are still facing issues, kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected] so that we may log an incident and assist accordingly. 

I cannot connect to GOVMT on my mobile phone

Right Click → ‘Copy Link Address’

It is important to note that devices which are not CORP-joined (such as mobile phones) will be able to connect to GovCorp, however, these will be placed in a Guest network with limited functionality/access. Only CORP-joined devices will be placed in a CORP network and able to access CORP services.

I do not have access to all systems over the network, but my colleagues do

Right Click → ‘Copy Link Address’

Connect to a network wall port (network outlet/plug) of a colleague who is accessing the system to confirm whether issue is specific to your network outlet / plug only.

Should you be able to access all systems when connected to the colleague’s wall port, contact your IT personnel stating the steps performed. Further troubleshooting steps can then be carried out with the assistance of MITA.

VPN - How do I apply for Additional Options?

Right Click → ‘Copy Link Address’

Change Multi-Factor Authentication Method
  • Business Justification: In most cases the multi factor authentication method can be changed by the user as indicated here.  In some cases, such as when the registered phone / mobile number are not accessible, then the user must send an email from his personal government email to the generic SCC mailbox.  Alternatively, an RFS approver from the user’s organisation can send an email on the user’s behalf to [email protected].
VPN - How do I apply for Non-Standard Requests?

Right Click → ‘Copy Link Address’

Consideration should be given to all cases before non-standard request are made, ensuring that a valid business need for every request.  Such requests are submitted against a deviation from one or more policies or best practices. Additional charges might also be incurred to fulfil these requests.  In some instances, there might be additional risks and liabilities that will be carried by the respective user and/or department.

Approval from your department’s management as well as your CIO / IT Manager is required before proceeding with the request.

Remote Desktop Connection
  • Business Justification: Although it is not recommendable due to the risk it carries, there might be business and technical requirement to allow the Remote Desktop Protocol (RDP) over the Virtual Private Network (VPN) service.

Method: The normal RFS has to be used (refer to the section VPN – How do I apply for the Service) but further security vetting for such a request will have to be conducted.

VPN - How do I apply for the Service?

Right Click → ‘Copy Link Address’

Create VPN Account

Business Justification: Users who require to access systems hosted at MITA from third party connections (e.g. from home) or suppliers who need to perform support on systems hosted on the MAGNET. Accesses are granted according to the VPN profile that is determined by the user’s Organisation, Department and Section.  When applying for users who need to have new accesses (i.e. new VPN profile) then you must also raise an RFS for a new VPN Profile Group. Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to submit an RFS to apply for a VPN Account can be found in the ‘RFS Users Guide‘.


Delete VPN Account

Business Justification: To remove VPN access to a user who no longer require having VPN account, an RFS request must be submitted. Users who no longer are government employee, VPN access is revoked automatically once the Persona Package is deleted. Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to submit an RFS to revoke a VPN Account can be found in the ‘RFS Users Guide‘.


VPN Profile Group

Business Justification: VPN profile groups dictated what accesses are allowed via VPN.  For example, each ministry has its own access to systems that are specific for the respective ministry.  More information about this can be found in the CIO portal.  Client’s suppliers using VPN often have their own VPN profile group to limit access to the systems that they support. If changes to VPN profiles / groups (e.g. VPN access to a new system) is required, a request must be raised. Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to submit an RFS to Create/ Modify or Delete VPN Profile can be found in the ‘Resource Mgmt. – Other Services‘.

VPN - How do I connect to MITA VPN?

Right Click → ‘Copy Link Address’

Before connecting to the MITA VPN, you would have to confirm that you have access to the VPN service. This may be done by following the below steps;

  1. Visit the website https://rfs.gov.mt/MyAccount/
  2. Scroll to the section of ‘Core Services’ and make sure you have the VPN access.

  1. Should this field be unticked, kindly communicate with your respective IT logger so that they may raise an RFS so that you would gain access to the VPN service. To know your IT loggers are you may follow the FAQ page – RFS – How do I know who my IT Loggers are?

Once the above has been confirmed the following steps may be performed;

  1. Make sure that you have FortiClient VPN installed – if not go to https://vpn.mita.gov.mt, download and install the software.
  2. Next Identify what MFA authentication method you are using by navigating to https://mfa.mita.gov.mt.

  1. Enter your CORP credentials and click ‘Connect’

  1. Halfway through the authentication process, you will be prompted to confirm authentication by any one of the following controls:
  • If using the Authenticator App – press “Approve” or “Deny” accordingly on your mobile phone
  • If using the mobile App but using the One Time Pass Code – enter the 6-digit passcode in the space provided on the FortiClient VPN software
  • If using the SMS authentication service – enter the 6-digit passcode sent to your mobile device. In case you do not receive an SMS, ensure that the correct number is configured at https://mfa.mita.gov.mt.
VPN - How do I install and use the VPN software on a Government Workstation?

Right Click → ‘Copy Link Address’

A Virtual Private Network (VPN) extends a private network across public network. VPN users are able to send and receive data across shared or public networks as if their computer device was directly connected to the Government network (MAGNET).

MITA provides a VPN client called FortiClient . FortiClient access is established in conjunction with the Multi-Factor Authenticaton token, therefore one must enroll to the Multi-Factor before using FortiClient.


Installing FortiClient VPN software (On a Government Supported Workstation)

Requirements

  • Access to a workstation
  • ​Workstation must be connected to the Government Network (MAGNET)

Instructions:

Windows ​​Software Center Instructions:

  • Click on the Start Button
  • Type and click on the Software Center App
  • Under Applications, click on the Fortinet VPN Client (version number may be different) and select Install 

Windows ​​Instructions:
​This requires admin credentials, you may need to contact your respective IT or contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected] for further assistance.

  • AMD/Intel-Based Processors
    • Download FortiClient VPN from one of the following sources:
    • Run the installer.
    • Follow the on-screen instructions to complete the installation.
  • ARM-Based Processors
    • Download FortiClient VPN from Fortinet Direct Link.
    • Open the downloaded file.
    • Follow the prompts to install the application.

NOTE: To install FortiClient on a personal workstation, kindly click here


Using FortiClient VPN software (On Government Supported Workstation)

NOTE: Workstation must be connected to a Third-Party network connection. VPN does not work if workstation is connected to the government network (MAGNET)

  1. After the installation is complete the FortiClient shortcut icon ​is created on the desktop. A green shield icon with a white check mark also should be visible in the taskbar. ​
  2. Double click on the shortcut to log in using to MITA’s VPN service.
  3. Enter your Corp domain username (e.g. surnn001) and password 
  4. Click on the Connect button.
  5. Depending on the Multi Factor Authentication method chosen, you will now be asked to enter the token code / approve the Multi Factor Authentication. Click here for more information.
  6. You will now be connected to the MITA VPN service.
  7. To disconnect click on the FortiClient icon in the taskbar and click on the Disconnect button.​

NOTE: Should you require to access/ map a Network drive (Such as P: Drive), click here.

VPN - How do I install and use the VPN software on a Personal Workstation?

Right Click → ‘Copy Link Address’

A Virtual Private Network (VPN) extends a private network across public network. VPN users are able to send and receive data across shared or public networks as if their computer device was directly connected to the Government network (MAGNET).

MITA provides a VPN client called FortiClient . FortiClient access is established in conjunction with the Multi-Factor Authenticaton token, therefore one must enroll to the Multi-Factor before using FortiClient.


Installing FortiClient VPN software (On personal Workstation)

Requirements:

  • Workstation must be connected to any network connection
  • Corp domain password must be known
  • Workstation must have one of the below Operating System:
    • Microsoft Windows 7,8.1, 10 and 11 (32 and 64 bit)
    • Mac OS X v10.15, 11 and 12
    • Linux Ubuntu 18.04 or newer, Red Hat 7.4 newer or CentOS 7.4 or newer ​

Windows ​​Instructions: ​

  • AMD/Intel-Based Processors
    • Download FortiClient VPN from one of the following sources:
    • Run the installer.
    • Follow the on-screen instructions to complete the installation.
  • ARM-Based Processors
    • Download FortiClient VPN from Fortinet Direct Link.
    • Open the downloaded file.
    • Follow the prompts to install the application.

MacOS ​​Instructions: ​

  • Intel-Based Processors
    • Download FortiClient VPN from Fortinet Direct Link.
    • Open the downloaded file.
    • Follow the prompts to install the application.
  • ARM-Based Processors (Apple Silicon)
    • Open the Mac App Store.
    • Search for FortiClient VPN.
    • Download and install the application following standard macOS procedures.

Linux ​​Instructions: ​

  • Red Hat-Based Distributions (CentOS, Fedora, etc.)
    • Download FortiClient VPN from Fortinet Direct Link.
    • Install the package using the package manager:
      sudo yum install <package_name>.rpm
  • Debian-Based Distributions (Ubuntu, Debian, etc.)
    • Download FortiClient VPN from Fortinet Direct Link.
    • Install the package using the package manager:
      sudo apt install ./<package_name>.deb
  • Resolve any dependency issues if needed using package management tools.

NOTE: To install FortiClient on a government support workstation, kindly click here


Using FortiClient VPN software (On personal Workstation)
  1. After the installation is complete the FortiClient shortcut icon ​is created on the desktop. A green shield icon with a white check mark also should be visible in the taskbar.
  2. Double click on the shortcut to log in using to MITA’s VPN service.
  3. Enter your Corp domain username (e.g. surnn001) and password 
  4. Click on the Connect button.
  5. Depending on the Multi Factor Authentication method chosen, you will now be asked to enter the token code / approve the Multi Factor Authentication. Click here for more information.
  6. You will now be connected to the MITA VPN service.
  7. To disconnect click on the FortiClient icon in the taskbar and click on the Disconnect button.​

NOTE: Should you require to access/ map a Network drive (Such as P: Drive), click here.

VPN - How do I install and use the VPN software on a Mobile Device?

Right Click → ‘Copy Link Address’

A Virtual Private Network (VPN) extends a private network across public network. VPN users are able to send and receive data across shared or public networks as if their computer device was directly connected to the Government network (MAGNET).

MITA provides a VPN client called FortiClient . FortiClient access is established in conjunction with the Multi-Factor Authenticaton token, therefore one must enroll to the Multi-Factor before using FortiClient.


Installing FortiClient VPN software (On Mobile Device)

​​Instructions: ​

  • Open the respective App Store (Google Play Store / Apple App Store)
  • Search for FortiClient VPN
  • Download and install the application

Configuring FortiClient VPN software (On Android)
  1. Open FortiClient VPN and accept Privacy Policy
  2. Grant permission for notifications from FortiClient VPN
  3. Enable “Unrestricted Battery Usage”
  4. Allow to run the app in the background
  5. Set the name to “MITA VPN” and choose VPN type “SSL VPN”
  6. Choose Servers setting
  7. Type “vpn1.secure.gov.mt” as a server name
  8. Tap on options in the top right corner
  9. Choose VPN option
  10. Press on MITA VPN tunnel
  11. Allow to create a VPN connection
  12. Press Connect
  13. Enter your credentials accordingly
  14. Approve via Microsoft Authenticator App

    Once connected the below is shown

Configuring FortiClient VPN software (On iOS)
  1. Open FortiClient VPN and Allow notification policies
  2. Allow for FortiClient to use network on the iPhone
  3. Go in the connection section
  4. Select Add Configuration
  5. Configure the following settings such as Name “MITA VPN” and Server address “vpn1.secure.gov.mt”. Then Save
  6. Check that the VPN connection MITA VPN selected and go back to the main page
  7. Tap the connect switch and wait for the prompt
  8. It will prompt you to enter your credentials
  9. After the credentials have been entered you should receive a notification from the Microsoft Authenticator, Approve the sign-in from Microsoft Authenticator:

    Once connected the below is shown.
VPN - I can connect to MITA VPN from home, but not from office. What can the problem be?

Right Click → ‘Copy Link Address’

A VPN is basically emulating your work network whilst not at the office allowing you to access work related files as though you are in the office. If you attempt to login into VPN when connected to the office network, a VPN connection will not be established.

VPN - I can connect to MITA VPN, however I am unable to access a MITA service. What shall I do?

Right Click → ‘Copy Link Address’

When using MITA VPN, everyone has access to generic MITA services. When connecting to VPN but you do not have access to any MITA services, try to re-install the FortiClient.

When connecting to MITA VPN and a specific service is not available, contact your respective IT Logger to raise a network access configuration RFS to provide access from your VPN to the specific service.

Kindly follow the below steps to find out who your respective IT Loggers are;

  1. Navigate to https://rfs.gov.mt/myaccount
  2. Click on ‘Proceed to My Account’
  3. From the 4 tabs on the top click on ‘My IT Department Contacts’
  4. Under the section ‘IT Loggers’ you will find your respective IT and their contact details
VPN - Recommendations of Use

Right Click → ‘Copy Link Address’

Below are some considerations for the correct use of the Virtual Private Network (VPN) service.

Security Considerations
  • The VPN service is coupled with the multi-factor authentication to provide a more secure service.  It is important to keep this in mind when selecting the multi-factor authentication method.  For example, selecting a phone number that is also accessible by other persons is not good practice. Similarly, if your mobile is used for one of the methods, ensure that you always keep it in sight and that it is kept locked.
VPN - Service Description

Right Click → ‘Copy Link Address’

Who is entitled for the Service?
  • The Virtual Private Network (VPN) service can be granted to government employees or suppliers who need to access systems hosted at MITA.

Multi Factor Authentication
  • To make the service more secure, to access the VPN service users must provide both their domain credentials as well as multi factor authentication.  Various methods of multi factor authentication can be set by the user.  More information about this can be found here.

Terms and Conditions
  • When using the MITA VPN service users are bound by the Terms and Conditions as found here.

Use of Domain Account for Secure Token
  • A personal CORP account is required to be used in conjunction with the Secure Token every time a user needs to connect to the VPN service.  Thus it is mandatory to have a domain account to make use of this service.

Third party suppliers / contractors performing work for multiple organisations (Ministries and Entities) must have a separate personal domain account for each organisation they support.  This is because each organisation can request the deletion of the supplier’s specific domain account when the supplier’s services for that organisation are no longer required.

VPN - Service Information

Right Click → ‘Copy Link Address’

The Virtual Private Network (VPN) service provides secure remote access to systems hosted at MITA over standard personal internet connectivity. The service provided by MITA is offered to the following using personal domain accounts:

  • Users within government who need to access applications or Office Automation folders from home; (teleworking)
  • Third party suppliers who need to provide support on services hosted at MITA
What is the process of configuring and connect MITA approved LAN equipment?

Right Click → ‘Copy Link Address’

Raise an RFS for the configuration of LAN equipment (wired and wireless). Once this RFS is at MITA’s end, MITA Network Engineering Services team will contact you to schedule a timeslot for configuration and setup. It is important that no prior work is carried out by the IMU or any other 3rd parties so that the instructions given by MITA can be followed in full and effectively.

To carry out network equipment configuration, only a console cable is required with configuration carried out through a remote session. To this effect, no devices shall be sent to MITA for configuration.

What types of network connections are offered by MITA?

Right Click → ‘Copy Link Address’

MITA offers different types of MAGNET connections, ranging from broadband to fibre technologies. Broadband connections can be either ADSL at a bandwidth of 50Mbps/10Mbps or Cable at a bandwidth of 100Mbps/20Mbps. On the other hand, fibre connections are categorised into two types – Type A (single fibre with no backup) or Type C (dual fibre one acting as a backup). Bandwidths available on fibre connections are 50Mbps, 100Mbps and 200Mbps. Selection of any one of these services is carried out via the RFS system.

When decommissioning a MAGNET site and / or hardware, how shall it be returned to MITA?

Right Click → ‘Copy Link Address’

From time-to-time, MAGNET network connections might no longer be required. To stop billing and reporting on sites which are no longer in use, it is important to:

  1. Raise an RFS for the decommission of the connection – include the site name and connection ID found within the network contacts section of the CIO portal
  2. Return Firewall to MITA Data Centre St Venera – important to include its power supply. Failure to do so can lead MITA to charge for equipment.
Which wireless does MITA manage and how to I get online?

Right Click → ‘Copy Link Address’

Currently MITA manage the below wireless SSIDs

SSID NameDescription
GovCorpProvides resident users network access to CORP services just like wired network access
GovGuestProvides Guest internet mainly for mobile phones

It is important to note that devices which are not CORP-joined (such as mobile phones) will be able to connect to GovCorp, however, these will be placed in a Guest network with limited functionality/access. Only CORP-joined devices will be placed in a CORP network and able to access CORP services.

Why am I shown that I am connected to WiFi but still have no internet access?

Right Click → ‘Copy Link Address’

When connected to any of the government WIFI services, there is a chance that you won’t have internet access. In this case, check your device’s notification area to see if the selected Wi-Fi network requires sign-in. If so, sign-in through the portal to have time limited access until the following day.

If you don’t have internet through WIFI, check the signal and check with other colleagues if they are experiencing the same issue.

If you are next to the Wi-Fi access point and can confirm that the Wi-Fi is present and working on other devices, but not on your laptop, kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected] so that we may log a call and assist accordingly. 

Microsoft Office 365 FAQs

AIP - How to use Azure Information Protection (AIP)

Right Click → ‘Copy Link Address’

Secure Mail has been migrated to the Azure platform and has been expanded to cater its security features on other MS Office applications, such as Word documents.

Click here for instructions on how to make use of the Azure Information Protection(AIP).

Excel - How do I password protect a Workbook file?

Right Click → ‘Copy Link Address’

Microsoft Excel has the facility to allow you set a file in such a way that the user is asked for a password to be able to view the file and another password to be able to edit the file.

The following steps need to be performed:

  • Open the required workbook
  • Click on the File menu and select the Save As option
  • Click on the Tools button (to the left hand of the Save button) and select General Options… (refer to below screen shot)

  • You will now be prompted with two possible passwords – make sure that you remember any password that you type in as the file might be inaccessible if you forget it
  • Type a password in the Password to open textbox if you want the users to be prompted for this password when they want to view the file (you will be prompted to re-enter the password to verify it)
  • Type a password in the Password to modify textbox if you want the users to be prompted for this password when they want to edit the file (you will be prompted to re-enter the password to verify it)
  • Finally select the location and File name and click on the Save button
How can I know what type of Microsoft Office License has been assigned to my CORP Account?

Right Click → ‘Copy Link Address’

In order to make use of an Office 365 package your CORP Account or Workstation must be assigned a license.

To check whether your account has a license, and if so, which type of Office 365 license, kindly follow the below steps:

  1. Kindly navigate to the link https://rfs.gov.mt/MyAccount
  2. Click on Proceed to My Account

3. If prompted, please sign in with your CORP credentials.

4. Once the page loads, kindly scroll down till you reach the Core Services Section, where in the Other Services box you will have the Microsoft Office 365 license listed (eg: Microsoft 365 E1, Microsoft 365 E3 or Microsoft 365 E5)

To confirm whether your Shared Workstation has an Office 365 license assigned to it, kindly click here.

How do I activate Office 365?

Right Click → ‘Copy Link Address’

This FAQ is only applicable for Office 365. It is NOT applicable for Office 2016. Office 365 asks you to register the first time you load an Office application (e.g, Word). If when you load the Office application and you are not asked to register, go to the File menu and click on Account. A page that contains the product information with will be displayed and the Subscription Product should be “Microsoft 365 Apps for enterprise”.

To register / activate Office 365 follow the below steps:

  • Load the Office 365 application and you will be prompted to activate the product
  • Enter your Email address (e.g, [email protected])
  • If prompted for a password use your CORP password

If you have an E5 license you can activate your Office 365 license on up to 5 devices. If you wish to unregister / deactivate an account from a particular device, please follow the below steps:

  • Log in https://portal.office.com using your Email credentials (e.g, ​[email protected])
  • Click on your profile icon in the bottom left corner of the window.
  • Click on “My Microsoft 365 profile”
  • Click on “Apps & devices”
  • Under Office, Click on “Devices”
  • Select the device you no longer use and click on “Sign Out” and confirm
How do I confirm that a Microsoft 365 apps per device license is installed on a shared workstation?

Right Click → ‘Copy Link Address’

In order to make use of an Office 365 package your CORP Account or Workstation must be assigned a license.

To confirm whether your Shared Workstation has an Office 365 license assigned to it, kindly follow the below steps:

  1. From the Windows Taskbar, search for Word

2. From the left side menu, click on Account

3. If beneath the Product information Section, you have written Belongs to: This device as shown in the screenshot, then the license being used is of the Workstation.

To check whether your account has a license, and if so, which type of Office 365 license, kindly click here.

How do I Install Microsoft Office Maltese Language Pack?

Right Click → ‘Copy Link Address’

Kindly follow the below instructions to install the Microsoft Office Maltese Language Pack.

  1. Click the Start Button and type Software Center 
  2. Click on the Software Center App
  3. Through the Software Center, click on the Applications
  4. Click on the MS Office Language Pack x86
  5. Click on Install

How do I install Microsoft Project?

Right Click → ‘Copy Link Address’

Kindly follow the below instructions to install the Microsoft Office Project.

NOTE: In order to install Microsoft Project, you will need to have the appropriate license, you may check your license at https://rfs.gov.mt/myaccount and scrolling to the section ‘Other Services’


Microsoft Project Installation
  1. Click the Start Button and type Software Center 
  2. Click on the Software Center App
  3. Through the Software Center, click on the Applications
  4. Click on the MS Office 365 ProPlus – Project Professional 2016 Retail
  5. Click Install

Please note that on rare occasions, this installation process might not complete successfully. If this happens, kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected]

How do I install Microsoft Visio?

Right Click → ‘Copy Link Address’

Kindly follow the below instructions to install the Microsoft Office Visio.

NOTE: In order to install Microsoft Visio, you will need to have the appropriate license, you may check your license at https://rfs.gov.mt/myaccount and scrolling to the section ‘Other Services’


Microsoft Visio Installation
  1. Click the Start Button and type Software Center 
  2. Click on the Software Center App
  3. Through the Software Center, click on the Applications
  4. Click on the MS Office 365 ProPlus – Visio Professional 2016 Retail Plan2
  5. Click Install

Please note that on rare occasions, this installation process might not complete successfully. If this happens, kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected]

How do I set up Microsoft Office 365 on Mac?

Right Click → ‘Copy Link Address’

To install Microsoft Office 365 on Mac OS using the E3/E5 license provided with your CORP account, kindly follow the steps found in this link

How do I use the Skype Meetings App?

Right Click → ‘Copy Link Address’

To learn how to use the Skype Meetings App kindly follow this document

Office 365 Licence Summary

Right Click → ‘Copy Link Address’

Office 365 E1 – Enterprise Office

The below applications are only available through the office.com website.

  • Word: A word processing application.
  • Excel: A spreadsheet application.
  • PowerPoint: A presentation application.
  • OneNote: A note-taking application.
  • Outlook: An email and calendaring application.
  • Publisher: A desktop publishing application.
  • Access: A database management application.
  • OneDrive for Business: A cloud storage and file-sharing service.
  • Teams: A collaboration platform for chat, video meetings, and file sharing.
  • SharePoint: A web-based collaboration platform for document management and storage

Office 365 E3 and E5 – Enterprise Office

The following applications are available through Office.com and local installation:

  • Word: A word processing application.
  • Excel: A spreadsheet application.
  • PowerPoint: A presentation application.
  • OneNote: A note-taking application.
  • Outlook: An email and calendaring application.
  • Publisher: A desktop publishing application.
  • Access: A database management application.
  • OneDrive for Business: A cloud storage and file-sharing service.
  • Teams: A collaboration platform for chat, video meetings, and file sharing.
  • SharePoint: A web-based collaboration platform for document management and storage

Office 365 – Enterprise Office – Apps per Device Licence:

The below applications are only available only through a workstation that uses a common government-shared device installed with Microsoft 365 Apps and through the office.com website. Important to note that One Drive is not locally installed among the other Office 365 applications.

  • Word: A word processing application.
  • Excel: A spreadsheet application.
  • PowerPoint: A presentation application.
  • OneNote: A note-taking application.
  • Outlook: An email and calendaring application.
  • Publisher: A desktop publishing application.
  • Access: A database management application.
  • OneDrive for Business: A cloud storage and file-sharing service.
  • Teams: A collaboration platform for chat, video meetings, and file sharing.
  • SharePoint: A web-based collaboration platform for document management and storage

Voice Teams Service:

All plans include Voice Teams Service with M365 Phone system enabled and premium support.


Amount of Installations:

E1: None since office licence allows access only through Office.com.

E3 and E5: Up to five PCs or Macs, five tablets, and five phones per user.

Apps per Device Licence: Office applications will only be installed on the requested Workstation.


MS Exchange Online:

Included in all plans.


OneDrive for Business:

E1: Only available through https://onedrive.live.com/login/.

E5 and E3: Available through https://onedrive.live.com/login/ and local installation, which will sync/back up local data.

Apps per Device Licence: Unavailable locally on the workstation. Only available through https://onedrive.live.com/login/

OneDrive - How do I backup my files using OneDrive?

Right Click → ‘Copy Link Address’

Important Note

The Windows operating system has a maximum file path length of 260 characters, but this limit is often reduced to 255 characters due to some reserved characters that take up extra space.

Example – If you have a folder structure like:

‘C:\Users\username\Documents\Projects\2025\Development\Testing\Reports\Final\Drafts\Version1\Images\Screenshots\UI\April\Meeting\Notes\Extra\Research\Backup\OldVersions\TeamReview\
PendingApproval\Archive\’

And you try to save a file with a very long name such as:

Detailed_Interface_Comparison_Report_For_Internal_Review_Version_3_Final_Draft.docx

The combined path length may exceed the 255-character limit. In this case, Windows will either prevent the file from being saved or give a random error.


Data Backup with Office 365 E1 License

NOTE: With an Office 365 E1 license a user will access Office 365 apps online only and will have the OneDrive sync option enabled.

  1. Navigate to www.office.com, and sign in with your CORP credentials (e.g. [email protected])
  2. Once you are in, you can create, access and work on documents with the Office online web version.
  3. By default, the below folders are automatically included in your OneDrive.
    Desktop
    Documents
    Pictures
  4. If you are working on a word document, select File and choose Save As.
  5. Select one of the above folders from location. To list all these folders select ‘more save locations’.
  6. Enter name of the file and the extension the file is to be saved in.
    Click on Save Here.
  7. Any folders/files placed in the above folders will be automatically backed up on OneDrive

If you want to upload files which you would have saved locally on your workstation (C: Drive) follow these steps:
  1. Access www.office.com
  2. Click on the App Launcher at the top-left and select the OneDrive icon
  3. Select the OneDrive file directory where you want to upload your files.
  4. Click on Upload and locate your files saved locally on your workstation (C: Drive).
  5. The selected files will be uploaded on OneDrive and saved under the selected file directory.

Data Backup with an Office 365 E3 / E5 License on the primary Government device

NOTE: With an E3 license a user will have Office 365 desktop apps installed on their primary Government device and will have the OneDrive sync option enabled.

  1. Check that OneDrive app is installed by confirming a blue cloud is present in the tray as shown.
  2. Click on the workstation start button. In the search box enter OneDrive
  3. Double click on OneDrive app.
  4. Confirm that the below three folders are created on your workstation.
  5. Locate the path which you would have used to save your files locally on your workstation (C: Drive).
  6. Copy the files that you want to backup in one of the above three folders.
  7. Any folders/files placed in the above folders will be automatically backed up on OneDrive

Alternatively, you can save a document or file, by following the below steps.

  1. If you are working on a Word document, select File and choose Save As.
  2. Select OneDrive – Malta Information Technology Agency
  3. Enter the name of the file and the extension the file is to be saved in.
  4. Click the Save button.

Data Backup with any Office 365 license on a shared device with Office 365 apps per device installed

NOTE: A user having any Office 365 license (E1, E3 or E5) using a common Government shared device, will have the Office 365 desktop apps installed on the workstation BUT the OneDrive sync option is disabled.

In such case, you may follow the method used in the Office 365 E1 License (above) since the OneDrive app is not available on the shared device, only the online version is available. This means that the backup and saving of files will not occur automatically, hence it needs to be performed manually.

To know what type of license has been assigned to your CORP account or to the workstation you are using click on the respective link hereunder:

Licence associated with my CORP Account

Licence assigned to my workstation

OneDrive - How do I Restore a previous version of a file stored in OneDrive

Right Click → ‘Copy Link Address’

With version history, you can see and restore older versions of your files stored in OneDrive or SharePoint. Version history works with all file types, including Microsoft 365 files, PDFs, CAD files, photos, videos, and more. If you need to, you may be able to restore deleted OneDrive files from the recycle bin.

  1. Sign in to OneDrive with your personal Microsoft account or your work or school account.
  2. Select the file that you want to restore to an earlier version (you can only restore one file at a time), right-click, then select Version history.
    Note: In Classic view, select the document, then at the top, select More > Version History.
  3. In the Version History pane, do one of the following
    If you’re signed in to OneDrive or SharePoint with a work or school account (such as a Microsoft 365 account), select the ellipses () next to the version of the document that you want to restore, and then click Restore.

In Classic view or previous versions of SharePoint Server, select the arrow next to the version of the document that you want to restore, and then click Restore.


Use Version history in File Explorer

If you have the OneDrive sync app installed on your PC, right-click the file that you want to restore to an earlier version in File Explorer and select Version history.  Then select the ellipses () next to the version you want and click Restore.

The document version you selected becomes the current version. The previous current version becomes the previous version in the list.

OneDrive - What do the OneDrive icons mean?

Right Click → ‘Copy Link Address’

The Microsoft OneDrive icons in desktop notification areas, menu bars, Windows File Explorer and macOS Finder tell you the sync state of the file or folder.

If you don’t see any desktop notification or menu bar icons, OneDrive may be hidden, not installed or not running. Learn more.


Blue circle with an “i”

If you see a blue circle with an informational letter “i” in it over a OneDrive cloud icon in the notification area, it means there are new messages about how best to use OneDrive, or to inform you about new or unused features.

Select the OneDrive cloud icon to see any messages and actions to take.

Red circle with white cross

A red circle with a white cross means that a file or folder cannot be synced. You’ll see this in File Explorer or on the OneDrive notification area icons.

Click the blue or white OneDrive icon in the notification area to learn more about the problem.

For more help, read how to Fix OneDrive sync problems.

Gray OneDrive cloud icon with a line through it

A grayed-out OneDrive icon with a line through it means you’re not signed in, or OneDrive setup hasn’t completed.

Press  Press the Windows key, search for OneDrive and then open the OneDrive desktop app.

Note: If you see the error message “You’re already syncing a personal OneDrive on this computer”, follow the steps to unlink and relink your account.

OneDrive paused icon

The paused symbol over the OneDrive or OneDrive for work or school icon means your files are not currently syncing.

To resume syncing, select the relevant OneDrive icon in the notification or menu bar area, select More and then Resume syncing.

Learn more about How to Pause and Resume sync in OneDrive.

OneDrive icon with sync pending arrows

The circular arrows over the OneDrive or OneDrive for work or school notification icons signify that sync is in progress. This includes when you are uploading files, or OneDrive is syncing new files from the cloud to your PC.

Sync icons may also be seen online on OneDrive.com.

OneDrive will also check for other file or folder changes and may show “Processing changes”. If OneDrive shows “Processing changes” for a long time, it could be because you have an online file open, a very large file syncing, a lot of files stuck in a queue. To help resolve these problems, read OneDrive is stuck on “Processing changes”.

If you’re seeing the sync pending icon in File Explorer, read OneDrive is stuck on “Sync pending”.

Red with white bar OneDrive icon

If you see a red “no entry” style icon over your OneDrive icon, it means your account is blocked.

Learn more about what to do when your OneDrive account is frozen.

Yellow exclamation mark OneDrive icon

If you see a yellow warning triangle over your OneDrive or OneDrive for work or school icon, it means your account needs attention. Select the icon to see the warning message displayed in the activity center.
Files with this icon won’t sync

You may see this icon if you sign in to OneDrive with a work or school account. It means your admin has blocked the sync of certain file types. It’s most common to block Outlook data files.

If you also sign in to OneDrive with a personal account, the same restrictions will apply.

Learn how to remove an Outlook .pst data file from OneDrive.

People icon next to a file or folder

If you see a “people” icon next to your OneDrive files or folders, this indicates the file or folder has been shared with other people.

Learn more about how to change sharing at Share OneDrive files and folders.

Blue cloud icon

A blue cloud icon next to your OneDrive files or folders indicates that the file is only available online. Online-only files don’t take up space on your computer.

You can’t open online-only files when your device isn’t connected to the Internet. Learn more about OneDrive Files On-Demand

Green tick icons

When you open an online-only file, it downloads to your device and becomes a locally available file. You can open a locally available file anytime, even without Internet access.

If you need more space, you can change the file back to online only. Just right-click the file and select “Free up space.”

Learn more about OneDrive Files On-Demand

Solid green circle with the white check mark

Files that you mark as “Always keep on this device” have the green circle with the white check mark.

These always available files download to your device and take up space, but they’re always there for you even when you’re offline.

Learn more about OneDrive Files On-Demand

Gray X on desktop icons

This is not a OneDrive icon, but a corrupted Windows shortcut icon. If you see a gray X over your Windows Desktop shortcuts, try these tips:

  • Right-click on your Desktop and select Refresh.
  • Uninstall any backup applications that are not longer used. Restart your computer after each uninstallation.
Padlock icon

OneDrive will show a padlock icon next to the sync status if the file or folder has settings which prevent it from syncing.

Learn more about restrictions and limitations when you sync files and folders.

Why do I have two OneDrive icons?

If you have signed in to the OneDrive sync app with both work or school and a personal account, you will see two OneDrive sync icons.

The blue one is for your work or school account, the white one is for your personal account.

Learn how to add an account in OneDrive.

Chain icon on a folder
A chain or link icon over a folder means it’s a shortcut to another folder that has been shared.
Brown box on Desktop icons

A brown box over your Windows Desktop icons can be caused by an issue with Windows Explorer.

To resolve the issue, restart Windows Explorer:

  1. Press Windows key  + E.
  2. Press CTRL + ALT + DEL and select Task Manager.
  3. Select More details to show all the apps.
  4. On the Processes tab, under Apps, right-click on Windows Explorer.
  5. Select Restart.
Shortcut Arrow

If you see a shortcut arrow over files that are not shortcuts, the solution is to Restart Windows File Explorer.

To resolve the issue, restart Windows Explorer:

  1. Press Windows key  + E.
  2. Press CTRL + ALT + DEL and select Task Manager.
  3. Select More details to show all the apps.
  4. On the Processes tab, under Apps, right-click on Windows Explorer.
  5. Select Restart.
For more information visit the full list of OneDrive icons and their meaning from here.
Teams - Call Group, Call Forwading and Delegates features

Right Click → ‘Copy Link Address’

Microsoft Teams provides call handling features such as Call Group and Delegates, which help ensure calls are answered when you are unavailable.


Call Group

A Call Group allows you to define a group of colleagues who can answer your incoming calls.

Instructions:

  1. Click on the (⋯) on the top right of teams.
  2. Click Settings.
  3. Go to Calls.
  4. Under Manage call group select Add a call group.
  5. Type a name to add a person to your call group.

Using Call Forwarding

When someone calls you, the call can ring you, select contacts or your set call group, depending on how you configure your call settings in Microsoft Teams.

Instructions:

  1. In Microsoft Teams, click the icon (⋯) in the top-right corner.
  2. Click Settings.
  3. Select Calls.
  4. Under Call handling and forwarding, configure your preferred options below.
    Each section has its own settings:
    • When you receive a call
      • Do not ring anyone else (default).
      • Also ring a new number or contact.
      • Also ring a call group (if configured).
    • When you’re in a call and receive another call
      • Play a busy signal.
      • Let new calls ring me (default).
      • Redirect as if a call is unanswered.
    • When you can’t answer a call
      • Do not redirect calls.
      • Redirect to voicemail (default).
      • Redirect to a new number or contact.
      • Redirect to a call group (if configured).
    • Ring for this many seconds before redirecting
      • 5, 10, 15, 20, 30, 40, 50, or 60 seconds.

NOTE:
Some options may not be available depending on your Microsoft Teams licence and configuration. If you do not see the settings listed above, please contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected]


Delegates

The Delegate feature allows you to assign one or more colleagues to make and receive calls on your behalf. This is typically used in roles where call handling is shared or managed by another person (e.g. a PA / secretary setup).

Instructions:

  1. Click on the (⋯) on the top right of teams.
  2. Click Settings.
  3. Go to Calls and locate the Manage Delegates section.
  4. Click Add a delegate and select the colleague you wish to assign.

NOTE:
Availability of Call Groups and Delegates may vary depending on your Teams license configuration. If the options are not visible in Teams, kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected]

Teams - Can I admit an unknown bot, application, or user from the lobby?

Right Click → ‘Copy Link Address’

No. Organizers and co-organizers should verify each request before admitting someone into a Teams meeting. Unknown bots, applications, or users should not be admitted into the meeting.

NOTE: If you are unsure whether a participant should be admitted, confirm with the meeting organizer before allowing access.

Teams - Can third-party AI bots or applications join Teams meetings?

Right Click → ‘Copy Link Address’

Once the change is implemented, third-party AI bots or applications will be blocked from entering Microsoft Teams meetings. This change is being introduced to help secure Teams meetings and prevent unknown third-party tools from joining.

NOTE: Microsoft Copilot and Facilitator will not be affected by this change.

Teams - Guidelines / Best Practices

Right Click → ‘Copy Link Address’

Correct use of Microsoft Teams

Microsoft Teams should be used primarily for business communication and collaboration. Use Teams Chat for quick communication and Meetings/Calls for structured discussions.


Status and Availability

Keep your status updated (Available, Busy, Do Not Disturb) to help colleagues understand your availability. When sharing your screen or presenting, ensure you are sharing only the required window/content.


Calls, Transfers and Shared Call Handling

When you are unavailable, consider using Call Group or Delegates to ensure calls are answered. When transferring calls, confirm the destination (user/number) before completing the transfer.


Meetings

For meetings, join a few minutes early to test audio devices. Where possible, use a headset to reduce background noise and echo. When recording or inviting external participants, ensure it is necessary and in line with your department’s procedures.


Files and Collaboration

Use Teams Channels to keep communication and files structured by topic. Share files through Teams so that documents remain accessible and version-controlled, rather than sharing multiple copies by email.

NOTE:
If you require assistance with Teams calling features, kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected]

Teams - How do I allow participants to join a meeting without waiting in the lobby?

Right Click → ‘Copy Link Address’

If there is a requirement for participants to join without being admitted by an organizer or co-organizer, the meeting lobby settings can be changed from Outlook.

To change the lobby bypass option:

  1. Open Outlook.
  2. Double-click on the Teams meeting.
  3. Select Meeting Options.
    1. For Outlook Classic


    2. For Outlook New


      Or



  4. A new Meeting Options window will open.
  5. Under Who can bypass the lobby, click the dropdown arrow.


  6. Select the option that suits your meeting requirements.


  7. Click Save.


NOTE: Due to privacy and security concerns, it is not recommended to set Who can bypass the lobby to Everyone.

Teams - How do I assign a co organizer to a meeting?

Right Click → ‘Copy Link Address’

A co-organizer can help manage a Teams meeting, including admitting participants from the lobby when the meeting organizer is unavailable.

Before assigning a co-organizer, the person must already be included as an attendee in the Teams meeting invitation.

To assign a co-organizer:

  1. Open Outlook.
  2. Double-click on the Teams meeting.
  3. Confirm that the person you want to make a co-organizer has been added to the meeting invitation.

    If they have not yet been invited, add them as an attendee and send the meeting update.

  4. Select Meeting Options.
    1. For Outlook Classic
      Meeting Options in Outlook Classic

    2. For Outlook New
      Meeting Options in Outlook New


      Or

      Alternative Meeting Options location in Outlook New

  5. A new Meeting Options window will open.
  6. Under Roles


  7. Click the Choose co-organizers field and select the person you want to assign.


  8. Select Apply or Save to confirm the change.

NOTE: Only people who have already been invited to the meeting can be selected as co-organizers. External participants cannot be assigned as co-organizers.

NOTE: Up to 10 co-organizers can be assigned to a Teams meeting. Co-organizers have most organizer permissions, but they cannot replace the original meeting organizer or edit and resend the meeting invitation.

Teams - How do I share a file in Teams?

Right Click → ‘Copy Link Address’

Share files from your device with other people in Teams. This includes files stored in your Teams OneDrive, channels, and chats, as well as files on your local device. Send the file itself or a link to it.


Share a file from OneDrive in Teams

When you upload a file to Teams, you can share it anytime with other people and groups.

To share a file in Teams for desktop:

  1. Select OneDrive   in Teams.
  2. Go to My files  OneDrive My files icon.
  3. Hover over the file you want to share and select Share  Share icon.
    1. Select Copy link  OD copy link icon to get a link you can paste into chat or email.
    2. Select Sharing settings  The "Settings" button found in the user interface to specify people and their permissions with the file.
  4. Select Apply to save changes.
  5. Select Send  Send icon.

Share a file in a chat

To share a file in a chat message:

  1. Select Chat  Teams Chat Tab icon​​​​​​​ in Teams.
  2. Open the chat conversation you want to share a file in.
  3. In the compose box, select Actions and apps Cross icon at top of the screenAttach file  Choose file button.
  4. Select a file and add an optional message.
  5. Select Send  Send icon.

NOTE: If you want to share a file from your computer’s file directory, you can drag it into the message.

Learn more about sharing files here.

Teams - How do I share my screen in a chat?

Right Click → ‘Copy Link Address’

You can share your screen without starting a video call when you’re chatting with one or more people in Teams. Select More options Microsoft Teams more options icon in the upper-right corner and then click Screen sharing Teams Share icon

    Share your screen in a MS Teams chat

Choose the screen you’d like to share or select Window to select from open programs. 

The other participants in the chat will receive a notification asking them to accept your screen share. Once they do, they’ll be able to see your screen and continue the chat.

When you’re done sharing, go to your meeting controls and select Stop sharing.

 

Learn more about sharing your screen here.

Teams - How to set Busy on Busy Functionality

Right Click → ‘Copy Link Address’

Busy on Busy is a feature within Microsoft Teams which manages how incoming calls are handled when a user is already in a Call, Meeting or Presenting.

With the option of Busy on Busy incoming calls can be automatically met with a busy tone or can be routed according to the user’s unanswered settings.

Kindly find below different scenarios of the Busy on Busy functionality

 Busy on Busy DisabledBusy on Busy EnabledBusy on Busy Unanswered
Available> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
Busy> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
In a call> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
User is not notified with the call
> Call is found in missed calls
User is met with a busy tone
User is not notified with the call
> Call is found in missed calls
User is redirected to Unanswered setting immediately
In a meeting> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
User is not notified with the call
> Call is found in missed calls
User is met with a busy tone
> User is not notified with the call
> Call is found in missed calls
> User is redirected to Unanswered setting immediately
Be right Back> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
Away> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
> User is notified with the call (pop up).
> Call is found in missed calls
> If unanswered, settings take effect
Do not Disturb> User is not notified with the call
> Call is found in missed calls
> If unanswered, settings take effect
> User is not notified with the call
> Call is found in missed calls
> If unanswered, settings take effect
> User is not notified with the call.
> Call is found in missed calls
> If unanswered, settings take effect
Presenting> User is not notified with the call
> Call is found in missed calls
> If unanswered, settings take effect
User is not notified with the call
> Call is found in missed calls
User is met with a busy tone
> User is not notified with the call
> Call is found in missed calls
> User is redirected to Unanswered setting immediately
Focusing> User is not notified with the call
> Call is found in missed calls
> If unanswered, settings take effect
> User is not notified with the call
> Call is found in missed calls
> If unanswered, settings take effect
> User is not notified with the call.
> Call is found in missed calls
> If unanswered, settings take effect
Teams - Should I set “Who can bypass the lobby” to Everyone?

Right Click → ‘Copy Link Address’

No, this is not recommended. Setting Who can bypass the lobby to Everyone may allow unintended or unknown participants to join the meeting without being reviewed by an organizer or co-organizer.

For better meeting security, use a more restricted option such as:

  1. Only organizers and co-organizers
  2. People who were invited
  3. People in my org

Choose the least open option that still meets the needs of the meeting.

Teams - Transfer / Redirect a call using a telephone number

Right Click → ‘Copy Link Address’

During an active Microsoft Teams call, you can transfer (redirect) the call to another person by entering their telephone number, instead of searching by name.


Transfer a call using a telephone number (during a Teams call)
  1. While in a Teams call, click Transfer (top-right of the call window).
  2. Choose one of the following options:
    1. Transfer – transfers the call immediately.
    2. Consult then Transfer – lets you speak to the person first, then transfer the call.
  3. In the search field, type the telephone number of the person you want to transfer the call to.
  4. Select the matching number from the results.
  5. Click Transfer to complete the transfer.

NOTE:
The Transfer option using a telephone number is only available if your Teams account is enabled with Teams Telephony. If you are unable to transfer using a number, kindly contact us via the chatbot service , by telephone on 25992777, or by emailing us at [email protected]

Teams - What should I do if I organise a meeting but cannot attend?

Right Click → ‘Copy Link Address’

If you organise a Teams meeting but will not be able to attend, you should assign a co-organizer before the meeting starts. The co-organizer will be able to join the meeting and admit participants from the lobby.

NOTE: If no organizer or co-organizer is present, participants may remain waiting in the lobby.

Teams - Which lobby bypass option should I choose?

Right Click → ‘Copy Link Address’

The option should be selected depending on who is expected to attend the meeting.

Common options include:

  • Only organizers and co-organizers – recommended default option.
  • People who were invited – allows invited participants to bypass the lobby.
  • People in my org – allows people from your organisation to bypass the lobby.
  • People in my org and guests – allows internal users and guests to bypass the lobby.
  • People in my org, trusted orgs, and guests – allows a wider group of trusted participants to bypass the lobby.
  • Everyone – allows all participants to bypass the lobby.

NOTE: The Everyone option is not recommended due to privacy concerns.

Teams - Who can admit participants from the lobby?

Right Click → ‘Copy Link Address’

Only organizers and co-organizers can admit participants from the lobby. Before admitting anyone, organizers and co-organizers should verify that the person requesting access is expected to join the meeting.

NOTE: Unknown users, bots, or applications should not be admitted into the meeting.

Teams - Who should I contact for assistance with Teams meeting lobby settings?

Right Click → ‘Copy Link Address’

If you require further assistance or clarification regarding Microsoft Teams meeting lobby settings or the blocking of third-party AI bots and applications, kindly contact:

[email protected]

Teams - Why am I being asked to wait in the lobby when joining a meeting?

Right Click → ‘Copy Link Address’

MITA is updating Microsoft Teams meeting settings to improve meeting security and reduce the risk of unknown users, bots, or third-party applications joining meetings.

By default, newly created meetings and already scheduled meetings will only allow organizers and co-organizers to bypass the lobby. This means that participants will wait in the lobby until they are admitted by the meeting organizer or co-organizer.

NOTE: If the organizer will not be able to attend the meeting, a co-organizer should be assigned so that attendees can be admitted into the meeting.

Where can I learn on Microsoft 365 products and tools?

Right Click → ‘Copy Link Address’

Where can I access MITA – Microsoft 365 online training material for OneDrive and SharePoint Online?

For MITA – Microsoft 365 online training material and courses follow this link:

https://govmt.sharepoint.com/sites/mstraining/

Where can I attend further training on OneDrive or other Microsoft 365 products and tools?

For MITA – Microsoft 365 learning pathways follow this link:

https://govmt.sharepoint.com/sites/mstraining/SitePages/MS-Training.aspx?source=https%3a//govmt.sharepoint.com/sites/mstraining

Service Portals FAQs

RFS - How do I check any pending requests I have?

Right Click → ‘Copy Link Address’

To check on any pending requests you have, click on RFS My Account below (this will open https://rfs.gov.mt/myaccount in a new tab)

If prompted, please sign in with your CORP credentials.

Navigate to the Second Tab My Requests from where you can find your RFS Requests and Ticket Requests

RFS - How do I know what licenses and access rights I have?

Right Click → ‘Copy Link Address’

To know what licenses and access rights you were granted, click on RFS My Account below (this will open https://rfs.gov.mt/myaccount in a new tab)

If prompted, please sign in with your CORP credentials.

Navigate to:

The First Tab My Account from where you can find your respective licenses.

Third Tab My Resources from where you can find your respective access rights.

RFS - How do I know who my IT Loggers are?

Right Click → ‘Copy Link Address’

To know who your IT Loggers are click on RFS My Account below (this will open https://rfs.gov.mt/myaccount in a new tab) If prompted, please sign in with your CORP credentials. Navigate to the Fourth Tab My IT Department Contacts from where you can find your Generic IT Contact as well as the respective IT Loggers.
MARVAL - User Guides

Right Click → ‘Copy Link Address’

For comprehensive instructions on using the MARVAL system, please refer to the following user guides:

IMU – MARVAL User Guide

Subcontractors – MARVAL User Guide

These guides provide detailed information to help you effectively navigate and utilize the MARVAL platform.

What is gethardware.gov.mt used for?

Right Click → ‘Copy Link Address’

gethardware.gov.mt is the website used for the purchase of hardware through the government framework.

Gethardware Portal - How can I see what type of hardware is being offered?

‘Right Click → “Copy Link Address”

Once you select the type of hardware you wish to purchase, you will find a document listing the specifications for that particular item.

Gethardware Portal - What is the next step after I submit my order?

‘Right Click → “Copy Link Address”

The procurement department will process your submitted order and send you a quotation. Once they receive the Local Purchase Order (LPO) from you, the order will be forwarded to the supplier.

Gethardware Portal - What should one keep in mind when submitting a request on gethardware.gov.mt?

‘Right Click → “Copy Link Address”

• Before submitting a request, make sure your entity is listed on the platform. If you cannot find your entity, email [email protected] so it can be added.

• For large orders (50 laptops or more), it is recommended to contact [email protected] in advance.

• Additionally, all requests should ideally be submitted through your entity’s IMU/IT department to ensure proper coordination and processing.

• Should you require further information or clarification forward an email to: [email protected]

Workstation FAQs

ASR - Can I disable ASR, turn off Microsoft Defender, or add an exception myself?

Right Click → ‘Copy Link Address’

ASR rules, Microsoft Defender settings, and any required exclusions or exceptions are managed by MITA respective teams on CORP devices. End users should not attempt to:
  1. Turn off Microsoft Defender Antivirus.
  2. Turn off real-time protection.
  3. Add local exclusions.
  4. Rename, move, or copy files to avoid a security block.
  5. Use another tool or location to bypass the rule.
If a legitimate business application or process is being blocked, report the issue through our chatbot service , by telephone on 25992777, or by emailing us at [email protected]. The issue can then be reviewed by the respective teams.
ASR - Does ASR apply to all devices?

Right Click → ‘Copy Link Address’

ASR applies to supported CORP devices where the relevant Microsoft Defender policies have been deployed. ASR is intended for CORP devices and is being introduced using a phased approach. Depending on the device, Windows version, and deployment phase, the same action may be audited, warned, or blocked.

 

NOTE: If you are unsure whether your device is affected by ASR, report the Windows Security message through our chatbot service , by telephone on 25992777, or by emailing us at [email protected] and include a screenshot.
ASR - How can I check which item was blocked in Windows Security?

Right Click → ‘Copy Link Address’

Windows Security may show more information about the blocked action in Protection history. Follow the below steps:
  1. Open the Start menu.
  2. Search for Windows Security and open it.
  3. Select Protection history.
  4. Look for an entry that matches the date and time of the issue.
  5. Open the relevant entry.
  6. Check whether it mentions Blocked by: Attack surface reduction.
  7. If shown, take note of the application, process name, file path, affected item, and rule name.
NOTE: The layout may differ slightly depending on the Windows version, but the required area is Windows Security > Protection history.
ASR - Should I click “Unblock” when the Windows Security warning appears?

Right Click → ‘Copy Link Address’

Some Windows Security warnings may show options such as OK, Unblock, or Email. Before selecting Unblock, check the below:
  1. You recognise the file, sender, website, application, or business process.
  2. The action is required for your work.
  3. You are confident that the file or action is expected.
If any of the above is not clear, select OK or close the prompt and report the issue through our chatbot service , by telephone on 25992777, or by emailing us at [email protected].

 

NOTE: Do not keep selecting Unblock for recurring prompts. Recurring warnings should be reviewed by our teams, in this case contact us for further assistance.
ASR - What are Attack Surface Reduction Rules?

Right Click → ‘Copy Link Address’

Attack Surface Reduction Rules, also known as ASR rules, are Microsoft Defender security controls used to help protect CORP devices. ASR rules reduce the risk of unsafe actions being allowed to run on a device. They are designed to block or warn about behaviour commonly associated with malware, ransomware, suspicious scripts, unsafe email attachments, and other risky activity.

 

ASR rules can work in different modes:
  1. Audit Mode – The action is monitored and recorded, but the user may not see anything.
  2. Warn Mode – The user may receive a warning before continuing, depending on the rule and device configuration.
  3. Block Mode – The action is blocked for security reasons.
NOTE: These settings are managed by MITA respective teams on CORP devices and cannot be changed by the end user.
ASR - What information should I provide when reporting an ASR block?

Right Click → ‘Copy Link Address’

The support or security team will need enough information to understand what was blocked and whether it is a legitimate business requirement. Kindly provide the following information:
  1. A screenshot of the Windows Security message or Protection history entry.
  2. The exact message shown, if visible.
  3. The file name and full file path, if shown.
  4. The application involved, such as Outlook, Word, Excel, Adobe Reader, a browser, or a business application.
  5. Where the file or content came from, such as email, website download, Teams, USB drive, Office document, PDF, or compressed archive.
  6. What you were trying to do when the message appeared.
  7. Which options were shown, such as OK, Unblock, or Email, and which one was selected.
  8. The date and time of the issue.
  9. The device inventory number.
  10. Whether the issue affects only you or multiple users/devices.
  11. Why the file, application, or process is required for business use.
NOTE: Do not attempt to bypass the block while waiting for review.
ASR - What should I do if Windows Security blocks a file, attachment, script, or application action?

Right Click → ‘Copy Link Address’

If Windows Security blocks something, do not try to bypass the message. Follow the below steps:
  1. Stop and check whether the file or action is expected and required for work.
  2. Confirm where the file came from, such as an email attachment, Teams message, website download, USB drive, Office document, PDF, or business application.
  3. Do not repeatedly retry the action.
  4. Do not rename, move, copy, or run the file from another location to avoid the block.
  5. Do not disable Microsoft Defender or change security settings.
  6. Take a screenshot of the Windows Security message.
  7. If the file or action is required for business use, report the issue through our chatbot service , by telephone on 25992777, or by emailing us at [email protected].
NOTE: If you are unsure whether the file or action is safe, do not continue, please contact us immediately.
ASR - What types of activity can ASR rules block or warn about?

Right Click → ‘Copy Link Address’

ASR rules can warn about or block activity that is risky, unusual, or commonly associated with malware. Examples include:
  1. Office applications starting other programs unexpectedly.
  2. Office applications creating executable content.
  3. Adobe Reader starting another process unexpectedly.
  4. Executable content launching from email or webmail.
  5. Suspicious or hidden script activity.
  6. JavaScript or VBScript launching downloaded content.
  7. Untrusted or unsigned processes running from USB storage.
  8. Behaviour associated with ransomware protection.
  9. Activity linked to credential theft, lateral movement, persistence, or vulnerable signed drivers.
NOTE: The exact behaviour depends on the policy applied to the device.
ASR - Why am I seeing a Windows Security message saying “This content is blocked”?

Right Click → ‘Copy Link Address’

A Windows Security message may appear when Microsoft Defender stops an action that is considered risky or unusual on a CORP device. This does not always mean that the file is malicious. It means that the action being attempted matched a security rule and was either warned or blocked for protection.

 

This can happen when, for example:
  1. An email attachment or downloaded file tries to run executable content.
  2. A Word, Excel, PowerPoint, Outlook, or other Office file tries to start another program.
  3. A script tries to run suspicious or hidden code.
  4. A file from a USB drive tries to run and is not trusted or signed.
  5. An application action resembles behaviour commonly used by malware or ransomware.
NOTE: If you were not expecting the file or action, do not continue. Close the message and report it through our chatbot service , by telephone on 25992777, or by emailing us at [email protected].
ASR - Why was a normal document, PDF, or email attachment blocked?

Right Click → ‘Copy Link Address’

A document, PDF, or attachment can be blocked even if it looks normal to the user. This usually happens because of what the file or application is trying to do in the background. For example, it may try to:
  1. Start another program.
  2. Create or run executable content.
  3. Run a script or macro.
  4. Launch downloaded content.
  5. Perform an action that is unusual for that type of file.
The block is based on the behaviour being attempted, not only on the file name or file type.

 

NOTE: If the document or attachment is required for work, report it through our chatbot service , by telephone on 25992777, or by emailing us at [email protected] and include the Protection history details where possible.
How do I apply for the Workstation Service?

Right Click → ‘Copy Link Address’

Procurement of a Workstation

Workstation for a new user or changing an obsolete one. Requests for the procurement of a new PC / Laptop have to be channeled through the respective IMU or IT department who will, in turn send a request from gethardware.gov.mt Unless otherwise requested, workstations that are procured through the standard MITA procurement process are automatically added to the support contract.


Adding a Workstation to Support Contract

In some cases it might be required to make use of a workstation that was procured by other means or was received as a donation. However, if such a PC / Laptop is required to be connected to a MITA managed NT domain and / or support is required then it has to be contracted. Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to submit Workstation Configuration – Add Workstation to Support Contract can be found in the ‘Resource Mgmt. – Other Services‘.


Removing a Workstation from Support Contract

Whenever support is no longer required on  a workstation, such as when it is written off, an RFS has to be raised to ensure that it is removed from the support contract. This change would be reflected in subsequent invoices. Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to submit Workstation Configuration – Remove Workstation to Support Contract can be found in the ‘Resource Mgmt. – Other Services‘.

How do I apply for Workstation Additional Options?

Right Click → ‘Copy Link Address’

Additional Microsoft Products Installation

Business Justification: Microsoft products which require a license, and which were not part of the standard workstation installation need to be procured before they can be installed. Since these products come at a cost it is important to ensure that the license is required and whether an alternative free product (such as a compatible viewer) can be used instead. Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to apply, transfer and remove license on MS Visio, MS Project, MS Dynamic 365 or MS Power BI Pro Contract can be found in theRFS Users Guide‘.


Line of Business Software Installation

Business Justification: The Workstations come pre-installed with a defined set of standard software. In several cases the user might need additional software to be able to perform the required work. In these cases, the Software Installation Procedure must be followed (including the SIRA form​) to ensure that licensing and security concerns are considered appropriately. If the request is approved by the respective CIO or IT manager then the below RFS has to be raised if MITA is required to assist in the software installation. In this case it is important that the user has the software installation medial / files before the RFS is raised except in those cases where the application is virtualised. Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to submit Line of Business Software Installation can be found in theResource Mgmt. – Other Services‘.

NOTE: If software that is part of the Security Classified List needs to be installed please refer to the Installing Software in the Security Classified List section found in the page Workstation – How do I apply for Non-Standard Requests?


Movement of Workstation

Business Justification: When PCs and Laptops are moved from one site to another both technical and administrative interventions might be required. The workstations might have to be commissioned as necessary (e.g. printer installation and configuration). The Asset Management System also must be updated for each computer that is moved. MITA and its Suppliers can provide technical assistance to move computers if notice is given in advance as per table below.

Whenever the Logging Process requires an RFS (RFS classification: Movement of Workstation) the current organisation (i.e. the organisation that currently own the asset, according to AMS) must raise an RFS, after obtaining the necessary approval from the asset destination organisation (i.e the new organisation the asset will go to).

N° of W/stationsAcross Orgs?MITA Assistance Required?​SLA PriorityLogging Process​
​​1 – 4​Yes​​​Yes​2​RFS
​No​n/a​RFS
​ No​Yes​2​Phone or Email
​No​n/a​n/a
​​​ 5 – 25​Yes​Yes​3​RFS
​No​n/a​RFS​
​ ​No​Yes​3​Phone or Email
​No​n/a​n/a
> 25​​ ​Yes​Yes​Separate project​RFS
​No​n/a​RFS
No​​​Yes​Separate project​​RFS​
​No​​n/a​n/a
 

File Sharing System (FSS)

Business Justification: FSS is a shared Network folder which allows users to upload data and share it with other members. FSS is similar to any other folder within the Operating System, however not effecting the workstation’s storage. Only users who are granted permissions can access and view data. Data is backed up regularly, therefore should there be any data loss, an RFS can be raised to restore the said data. Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to apply, transfer and remove license on MS Visio, MS Project, MS Dynamic 365 or MS Power BI Pro Contract can be found in the RFS Users Guide‘.

Backup DateAvailable Restore​
​​​1 – 30/31 daysAny day​
​1 – 6 Month(s)First Friday of any Month​

NOTE: Backups are retained by MITA for only 6 months.

How do I apply for Workstation Non-Standard Requests?

Right Click → ‘Copy Link Address’

Consideration should be given to all cases before non-standard request are made, ensuring that a valid business need for every request.  Such requests are submitted against a deviation from one or more policies or best practices. Additional charges might also be incurred to fulfil these requests.  In some instances, there might be additional risks and liabilities that will be carried by the respective user and/or department.

Approval from your department’s management as well as your CIO / IT Manager is required before proceeding with the request.


Removal of GPOs​

Business Justification: The government standard workstation is configured centrally via Group Policy Objects (GPO) to enhance the endpoint security.  Sometimes it might be required to remove the GPOs on a workstation and to grant local administrator rights on the same workstation.  Such cases might be to allow end users to install drivers on laptops that are being used outside government premises, or for legacy software that is not compatible with GPOs.  However to eliminate software issues it must be emphasised that before any software is procured, its compatibility with GPOs should be confirmed. Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to submit an RFS related to Remove/ Enforce GPOs can be found in theResource Mgmt. – Other Services‘.


Modify GPO for list of Trusted Sites ​

Business Justification: The government standard workstation is centrally configured via Group Policy Objects (GPO) to enhance the endpoint security.  One GPO which is centrally enforced is a list of sites that the workstations’ internet browser should trust.  Sometimes it might be required to modify (include/remove) this list of sites for a particular in-house built website to be allowed to function properly. To add / remove a website URL from the trusted site list, an Email from an RFS approver must be sent to [email protected].

NOTE: Proof of testing must be provided to make sure that this modification solves the intended issues without creating undesired impact. ​


Remove Power Management

Business Justification: Some workstations might have a business or technical (e.g. workstation has a local printer connected to it that is shared with other users) justification that requires the workstation NOT to have centrally set power management. Health Workstations are excluded from central Power Management configuration and thus should not be impacted. It can take up to 1 day (with workstation switched on) for Power Management settings changes to take effect after being centrally modified.​ Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to submit Remove/ Enforce Power Management Setting can be found in theResource Mgmt. – Other Services‘.


Screen Saver Timeout

Business Justification: Due to the nature of the work procedures within some specific departments (especially in Mater Dei Hospital and the Health sector in general), there is an option for a longer screen saver timeout period to be set.  Once can also apply for the removal of the centrally managed screen lock feature and set it to managed by user. The standard screensaver timeout is 15 minutes, but options for 45 minutes (Health only), 6.5 hours (Health only) and no screen saver.  If the option is selected the respective user must ensure that the required screen saver timeout has been configured. ​Such service can be applied for through the RFS Portal, https://rfs.gov.mt

NOTE: Instructions of how to submit User Screensaver Timeout  can be found in theResource Mgmt. – Other Services‘.


Installing Software in the Security Classified List

Business Justification: The Software Installation Procedure contains a Security Classified List which is essentially a list of application types that cannot be requested as part of this procedure.   If software that is part of the Security Classified List needs to be installed, then a deviation from policy has to be raised.Deviation​ from policy content:  Software Installation Procedure

How do I Backup on a Central Storage Repository?

Right Click → ‘Copy Link Address’

A Central Storage Repository is an online folder system that stores all of your files and documents in one place, that everyone could access with the right login credentials and permissions. Examples of Central Storage Repositories are, the File Sharing Services commonly known as the (P:) Drive and SharePoint Online.

To do a backup on one of these Central Storage Repositories, kindly follow the below steps according to your preferred storage repository.


How to do a backup on a Shared Drive? (File Sharing Service)
  1. Kindly select the file/s you wish to back up on your computer.
  2. Right click and click Copy, to copy file/s.
  3. Navigate to your preferred location within the Shared Drive and paste the file/s.

Kindly note that by default you cannot store the following file types on a Shared Drive: *.aac, *.aif, *.aiff, *.asf, *.asx, *.au, *.avi, *.flac, *.m3u, *.mid, *.midi, *.mov,*.mp1, *.mp2,*.mp3, *.mp4, *.mpa, *.mpe, *.mpeg, *.mpeg2, *.mpeg3, *.mpg, *.ogg, *.qt, *.qtw, *.ram, *.rm,*.rmi, *.rmvb, *.snd, *.swf, *.vob, *.wav, *.wax, *.wma, *.wmv, *.wvx, *.eml, *.idx, *.mbox,*.mbx, *.msg, *.ost, *.otf,*.pab, *.pst, *.bkf


How to do a backup on SharePoint Online?

SharePoint Online is a cloud-based collaborative platform integrated with Office365 which is used for storing and sharing content securely. To back up your data on SharePoint Online you may do so, by either clicking Upload from your SharePoint Online Location and selecting the files from your computer, or else you may Drag and Drop your files from your computer to your SharePoint Online Location and wait for them to Upload. For more information regarding this backup method kindly click here.

How do I Backup the Data on my Workstation?

Right Click → ‘Copy Link Address’

It is important to back up your files regularly from your workstation to minimize data loss especially in the case of a hard disk failure.​

You should always check your backed up data ensuring that you have the very latest copy of the data before you authorize activities such as erasing, wiping or reinstallation on your PC / laptop​.


Recommended Method: Microsoft OneDrive

It is recommended to use OneDrive as a form of backup. Click here for instruction on how to back up data using OneDrive.


Alternative Method: External Medium

Disclaimer: Use this method only if it is approved that the business needs require the use of external storage. Perform the following steps to back up data onto external mediums such as USB pen drives, Hard Disks, CDs/ DVDs, etc.

  1. Save any pending files and close all applications (including outlook, word, excel etc.)
  2. Open This PC

  3. Double click on the icon for the local drive C:~
  4. Open the Users
  5. Locate the profile folder with your username (e.g. surnn001) and double click to open it.
  6. To start copying all data in your profile right click on the profile folder and select Copy.
  7. Navigate to the external medium where the data will be backed up. (This will have a different drive letter other than C:) and can be found on the left-hand side of the window you were using.
  8. Paste the data to the External medium (One may wish to create subfolders). Right click and select Paste.
How do I connect peripherals?

Right Click → ‘Copy Link Address’

When a PC is moved from one place to another or is disconnected to facilitate maintenance work, the peripherals have to be connected again.

The below picture shows the back side of a typical computer.  As it can be seen there are a number of sockets / connectors / ports with the most important ones labelled.  Further below you can find a brief description on each of them.​  The ports can be located anywhere on the back (or even on the front) and not necessarily in the same place as shown in the sample layout below.

Name​Function / Description​
​1Mouse PS/2​​​Used to connect a PS2 mouse.  Note that in most cases the mouse is connected​ via USB instead, in which case this port is not used.
​2Keyboard PS/2​​Used to connect a PS2 keyboard.  Note that in most cases the keyboard is connected via USB instead, in which case this port is not used.
​3​VGA Video​Used to connect a monitor (or projector in the case of laptops).  Some monitors might use the DVI Video connector instead, in which case this port is not used.  If the monitor cable is not connected or not connected properly then the display can be blank, blurred, or having distorted colours.
​​4DVI Video​​Used to connect a monitor (or projector in the case of laptops).  Some monitors might use the VGA Video connector instead, in which case this port is not used. Not all computers have a DVI Video port since there might be only the VGA port available.   If the monitor cable is not connected or not connected properly then the display can be blank, blurred, or having distorted colours.​
​5USB 3​​Used to connect various USB devices such as a mouse, keyboard, printer, pen drive or external hard disk.  Note the blue colour of the plastic that indicates that this is the faster USB 3 (not USB 2) port.  Although USB 2 devices are compatible with this port, ideally such ports are used with USB 3 devices that require faster speed such as Pen Drives and external Hard disk.  Not all computers have USB 3 ports.
6​​USB 2Used to connect various USB devices such as a mouse, keyboard, printer, pen drive or external hard disk.  Note the black colour of the plastic that indicates that this is the slower USB 2 or USB (not USB 3) port.  Although USB 3 devices are compatible with this port, ideally faster USB 3 devices such as Pen Drives and external Hard Disks are connected to the faster USB 3 ports where available.​
​7Audio Speaker​​Connect audio speakers / speaker bar to the green jack socket.
​8​Network / LAN RJ45​Used to connect the network cable (that is also connected to the network wall port at the other end).  This port usually has green / orange LEDs to indicate network traffic.
NOTE: The power supply must also be connected to a power cord that is connected to the mains plug at the other end.  On some PCs there is also a power switch at the back that has to be switched on as well.​  When reconnecting a PC it is recommended that you connect all peripherals before connecting the power supply and switching it on.
 
How do I map a Network Drive (P Drive)?

Right Click → ‘Copy Link Address’

When using a workstation joined to a MITA managed domain, a number of shared folders are automatically mapped. These are normally the homes (H:), projects (P:) and apps (X:) drives. Users who have the Archive Spaces will also have the R: mapped to this service.

In some instances it might be required to map a drive manually. These scenarios are usually when using VPN or when you need to map a non standard shared folder.

Before you start you need to know the server name (as below) and the share name (e.g. OPM_Proj):
 

List of FSS shares
\\crt01-lj.corp.root.gov.mt
\\FSS-archive.corp.root.gov.mt​
\\FSS-entities.corp.root.gov.mt
\\FSS-entities2.corp.root.gov.mt
\\FSS-govapps.corp.root.gov.mt
\\FSS-govproj.corp.root.gov.mt
\\FSS-govproj2.corp.root.gov.mt
\\FSS-homes.corp.root.gov.mt
\\FSS-mdh.corp.root.gov.mt
\\FSS-mita.corp.root.gov.mt
\\FSS-mita.corp.root.gov.mt\msc_proj\SCCM_OSD_Images
\\oagz1-lg.corp.root.gov.mt
 

Important Note

The Windows operating system has a maximum file path length of 260 characters, but this limit is often reduced to 255 characters due to some reserved characters that take up extra space.

Example – If you have a folder structure like:

‘C:\Users\username\Documents\Projects\2025\Development\Testing\Reports\Final\Drafts\Version1\Images\Screenshots\UI\April\Meeting\Notes\Extra\Research\Backup\OldVersions\TeamReview\
PendingApproval\Archive\’

And you try to save a file with a very long name such as:

Detailed_Interface_Comparison_Report_For_Internal_Review_Version_3_Final_Draft.docx

The combined path length may exceed the 255-character limit. In this case, Windows will either prevent the file from being saved or give a random error.


To manually map shared folders on a Government connected Windows device please follow the below steps:
  • Press the Window Key + R from the keyboard.
  • In the Run command box, type the server name e.g. \\FSS-GovProj.corp.root.gov.mt and click on OK.
  • A list of all shares is then listed; Right Click on the share that needs to be accessed and select “Map network drive…”.
  • Select the required drive letter (standard drive letters are explained further above).
  • Check “Reconnect at sign-in” / “Reconnect at logon” so that you will keep using the mapped drive.
  • Click on Finish and type in your domain credentials to start using the share.

To manually map shared folders on a personal Windows device please follow the below steps:
  • Connect to the MITA VPN. Click here to find out how.
  • Press the Window Key + R from the keyboard.
  • In the Run command box, type the server name e.g. \\FSS-GovProj.corp.root.gov.mt and click on OK.
  • A list of all shares is then listed; Right Click on the share that needs to be accessed and select “Map network drive…”.
  • Select the required drive letter (standard drive letters are explained further above).
  • Check “Reconnect at sign-in” / “Reconnect at logon” so that you will keep using the mapped drive.
  • Check “Connect using Different credentials” so that you are able to use your CORP credentials to log in.
  • Click on Finish and type in your domain credentials to start using the share.

To manually map shared folders on a Macintosh device (MAC OS X) device please follow the below steps:
  • Press the Command key and the “k” key from the keyboard simultaneously.
  • In the Connect to server box, type the server name adding smb:// as a prefix e.g. smb://fss-govproj.corp.root.gov.mt/sharename and click on connect.
    Note that you have to use “/” and not “\”
  • Type in your domain credentials corp/username and password to start using the share.
  • Enter into System Preferences, from the Apple menu.
  • Click on ‘Accounts’.
  • Click on “Login Items”.
  • Click on the + button to add another login item.
  • Locate the network drive you previously mounted and click “Add”.
  • Exit out of System Preferences.
How do I retrieve BitLocker Key?

Right Click → ‘Copy Link Address’

BitLocker is Microsoft’s Windows encryption technology that protects your data from unauthorized access by encrypting the workstation’s hard drives.


When BitLocker is enabled, a unique 48-digit recovery key is provided. The BitLocker recovery key can be used to unlock your system if BitLocker is otherwise unable to confirm for certain that the attempt to access the system drive is authorized. This key may be stored in your Microsoft account, printed or saved on an external device as a file.

If the BitLocker recovery key is required, however is out of your possession, the below methods must be followed:


Method 1 – Using Microsoft’s Self-Service Portal.

This option is used at your convenience to retrieve your BitLocker recovery key.

Requirements:

  • A device connected to any network connection.
  • Current Corp password must be known.

Instructions:

  • Navigate to https://myaccount.microsoft.com.
  • Authenticate the portal using your Government Email Address and Password.
  • Click on View your devices.
  • Click on the name of the workstation (e.g. L123456) to expand more options.
  • Once detail is expanded, click on View BitLocker Keys.
  • Click on Show recovery key to reveal the BitLocker recovery key.

Method 2 – Submitting an RFS request.

This option allows you to be provided with your BitLocker recovery key. RFS are submitted by the respective IMU or IT department.

Requirements:

N/A

Instructions:

Users are to contact their respective IMU/ IT Department to submit the necessary request using rfs.gov.mt​. Once RFS request has been submitted and approved (by the respective IMU/ IT Department).

NOTE: Proxy is provided by the respective IMU/ IT Department when submitting the RFS request.

How do I save a file as PDF?

Right Click → ‘Copy Link Address’

PDF (Portable Document Format) is a file format that captures all data of a printed document as an electronic image. It ensures that when a file is viewed or printed it retains the intended format and the data in the file cannot be easily changed or edited.  PDF files retain their original format better than other file formats (e.g.  .doc, .xls) especially when viewed on mobile devices.

PDF format top benefit is its mobility and portability. PDF files can be viewed from most operating systems including mobile devices. This means that when you need to circulate a document, the other users only need a PDF viewer to read the document (i.e. there is no need for them to have e.g. Excel, Word, Publisher, Powerpoint, Project, Visio to read your file).

It is quite easy to convert files or web pages to PDF. Below you can find the different methods used to save as PDF depending on the Microsoft Office or Internet Browser version you are using. ​

​​​Software used​Method to save file as a PDF document
​Microsoft Office
  • ​Click on File
  • Select Save As (Save As dialog opens)
  • Select PDF (*.pdf) from Save As type

or

  • Click on File
  • From the Save As menu select Save as Adobe PDF (PDF or XPS​)
 
​Microsoft Edge Browser
  • ​Click the … icon (top right side of the window)
  • Select Print
  • Under Printer option select Print as a PDF
 
​Google Chrome Browser
  • ​Click on the Customize button (top right side)
  • Select Print
  • Change Destination to Save as PDF
  • Click Save
  • Select the File Name and Destination where the PDF file will be saved​
 
​Firefox Browser

To Save As PDF from a Firefox browser you need to install a plug in first.  Open the below link from the Firefox browser on which you want to install the plugin and click on the + Add to Firefox button on that web page :

https://addons.mozilla.org/en-US/firefox/addon/save-as-pdf/

  • Once the plugin is installed, to save a file as PDF from the Firefox browser just click on the Save as PDF icon found at the top left side of the browser window.
How do I set a Maltese keyboard?

Right Click → ‘Copy Link Address’

If you already have the Maltese keyboard installed (standard government PCs and Laptops have it pre-installed) you can select the Maltese fonts / language by clicking on the language (e.g. “ENG”) in the taskbar at the bottom right hand side of the screen.

To test if the Maltese keyboard is working properly open Microsoft Word, select the Maltese keyboard and try the below keys to see if ALL the Maltese characters are functioning.

NOTE: There can be multiple Maltese keyboards set (e.g. 47 and 48 key).  Try them both to see which one works best for your current keyboard.

​Key on Keyboard​Maltese Character
​\ż​
​`​ċ
​[​ġ
​]​ħ

If you need to install the Maltese keyboard on a Windows 10 / 11 PC / Laptop perform the following steps:

  • Click on Start
  • Type Control Panel
  • Click on Language
  • Click on Add a Language
  • Choose Maltese and click Add (kindly note that by default the Maltese 47-Key keyboard is going to be added)
  • Sort the Maltese language as the first option to set as default language
  • Try the Maltese keys by performing the below;
  •  Click on the right hand side of the task bar (bottom) and choose Maltese 47-Key Keyboard
If one or more keys are not properly translated into Maltese characters perform these additional steps:
  • Click on Start
  • Type Control Panel
  • Click on Language
  • Click on Maltese and click on Remove
  • Click on Add a language
  • Choose Maltese and click Add
  • Sort the Maltese language as the first option to set as default language
  • Click on Options
  • Click on Add an input method
  • Choose Maltese 48-Key and click Add
  • Click Save
No Network Access

Right Click → ‘Copy Link Address’

When a number of network dependent services (e.g. email, internet, OA shares) are not available on a workstation that used to access such services, the cause can be lack of network access.  This is identified by a red cross on the task bar at the bottom right hand of the screen (refer to screen shot below).

The following can be attempted to try to restore access or identify the cause if you are using a wired network (PCs are usually wired):

  • Ensure network cable is properly slotted both from the workstation side and from the wall port.
  • Try to change the network cable with a known working cable.  If this solves the issue and a new network cable is required contact your respective IT department or IMU.
  • If a number of workstations within the same area are impacted simultaneously, it is likely that some network equipment (e.g. a network switch) is switched off.  If possible ensure that the network cabinet is powered up.  Electricity related issues should be directed to the respective maintenance department, your IT department or your IMU.
  • If after performing the above the network is not yet restored you need to contact MITA to log a request as there can be other issues (such as a faulty network card on the workstation) that have to be seen to by MITA representatives.

NOTE: If the workstation is being connected for the first time to the network, the port has to be patched from the network equipment’s side.  You need to contact MITA to log a request to have the port patched.

 
If you are using a wireless network (all laptops have WIFI facility but not always used) please check the following:
  • Make sure that the laptop wireless switch is set to on.
  • If you are using MITA provided wireless access from a government department for the first time, you need to ask your respective IT Department / IMU to raise an RFS (xxxxx) to be granted access.
  • If you are using third party (i.e. not provided by MITA) wireless access, you need to ask your respective IT Department / IMU to provide you the respective wireless key and security settings.
  • If possible try to ask other users within the same area to check if they have wireless access.  If wireless access is not available to other users as well then there might be problems with the access point.  If the wireless service is provided by MITA then you need to raise a request with the MITA Service Call Centre.  If the wireless is provided by third party then please contact your respective IT Department / IMU.
Not Booting

Right Click → ‘Copy Link Address’

If your workstation is powering up but not booting (blank screen) try the following steps.  First try the below generic steps.  The steps further below are specific to whether you have a PC or a Laptop.

  • Ensure that all the workstation plugs (including monitor) are connected to a mains power socket that is switched on
  • Try to move the mouse or press a key on the keyboard to reactivate the workstation from hibernation / sleep mode
  • Press the power button once (short press)
  • Connect the mains plug to a different power outlet and try a different power cable / laptop charger
  • For laptops disconnect the battery and switch on the laptop using just the charger

For PC
  • Check that the display is powering on – if not check that the display power cable is properly attached
  • Check that the keyboard and mouse are properly connected – if not connect them and switch the PC off and on again (where possible try a different mouse / keyboard)
  • Disconnect the power cable from the PC
  • Press the power button for 10 times
  • Hold the power button for 10 seconds
  • Reconnect the power cable
  • Try to switch the PC back on

For Laptops
  • Disconnect the power adapter
  • Remove the battery from the laptop
  • Press the power button for 10 seconds
  • Press the power button for 10 times
  • Reconnect the power adapter and try to boot it.
  • If it boots, shutdown the laptop, disconnect the power, reconnect the battery and the power
  • Turn on the laptop
 
NOTE: If after performing these steps your workstation still does not boot, please contact us to report the issue.
Printing Issues

Right Click → ‘Copy Link Address’

There are two most common type of printer configuration as follows:

Network printer: This type of printer is connected directly to the network via a network cable or by means of an external print server.  This is the better option to share a printer between multiple users, and some models have other features such as scan to email.

USB printer: This type of printer is usually cheaper to purchase (although consumables might be more expensive) and is connected directly to a workstation via a USB cable.  Sharing this type of printer with other users is also possible but this requires the workstation that has the printer attached to be switched on.

If you cannot print from your printer, please make sure to check the below:

  • Make sure that the printer and print server are powered on and that the printer is loaded with papers.
  • If it is a Network printer, it is important to check that all the cables connecting the printer to the electric power supply, network wall port and/or network print server are properly connected from both ends. It is also important to check that if the printer is connected to a print server or network wall port, the LED lights on the printer’s network port are on and flickering.
  • If a workstation that has a USB printer shared with others also has power management enabled, the other users will not able to print when the workstation is set to sleep (refer to the Power Management section in the Workstation Service Definition page).  To learn how to apply for the removal of Power Management settings refer to the Remove Power Management section in the Workstation – How do I apply for Non-Standard Requests​ page.
  • If it is either a Network or a USB printer, go to StartControl Panel and select Devices and Printers and check that ​the printer is listed there.  If it is listed there, you can do the following steps in order to troubleshoot your issue:
    • 1. Set as Default Printer. This can be done by right clicking on your printer and selecting Set as Default Printer. This will ensure that every time you try to print, the required correct printer is chosen.
      2. Print a Test Page.  This can be done by right clicking on your printer and selecting Printer Properties and clicking on Print Test Page. This step will serve as a clear indication of whether this printer is accepting print jobs or not.
      3. Check for any stuck print jobs. This can be done by double left clicking on your printer and followed by a double left click on See what’s printing. A new window will show on screen with the pending (if any) print jobs pertaining to your printer. Right click on the stuck print job and select Cancel.
  • If it is a USB printer and showing as an Unknown Device in Devices and Printers under Control Panel, try to ​change the USB port on the workstation and the USB cable.​
Scan To Mail information

Right Click → ‘Copy Link Address’

For more information related to Scan to Mail, please access the following link

Why is my laptop not letting me sign in with the new password?

Right Click → ‘Copy Link Address’

When changing your CORP account password while your work laptop is not connected to MAGNET (Gov Network or VPN), the laptop will not be aware of the new password. Consequently, it will only allow you to log in using the old password. This can have an impact on the use of file shares (P: Drive) and other applications.

To resolve this issue, please follow the steps below:

  1. Connect to the MITA VPN using the new password.
  2. Once connected, lock your laptop by pressing the ‘Windows key’ and the ‘L’ key simultaneously on your keyboard.
  3. Log in using the new password.

By following this process, you will update the cached password on your laptop, allowing you to log in using the new password.

Windows Hello - Can I still use my password after setting up Windows Hello for Business?

Right Click → ‘Copy Link Address’

Yes, while Windows Hello for Business encourages the use of PINs and biometrics for faster and more secure sign-ins, you can still use your traditional password as a fallback authentication method if needed.

_


Windows Hello for Business Legend

To use the desired login method, click on the respective icon as per below.

Windows Hello - How do I set up Windows Hello for Business on my workstation?

Right Click → ‘Copy Link Address’

Once Windows Hello for Business is deployed, you will be prompted to set up your preferred sign-in method:

  • PIN Setup: Create a unique PIN that will be used for authentication.
  • Biometric Setup: If your device supports it, you can set up fingerprint or facial recognition by following the on-screen instructions.

Windows Hello - How does Windows Hello for Business improve security?

Right Click → ‘Copy Link Address’

Windows Hello for Business enhances security by storing authentication credentials locally on your device, reducing the risk of credential theft. Additionally, biometric data is stored securely and is not transmitted over the network, ensuring your personal information remains protected.
Windows Hello - What are the benefits of using Windows Hello for Business?

Right Click → ‘Copy Link Address’

  • Faster Sign-In: Authenticate quickly using a PIN or biometric methods, reducing the time spent entering passwords.
  • Enhanced Security: Utilizes local authentication, ensuring credentials are stored securely on your device.
  • Biometric Support: If your workstation supports biometrics, you can use fingerprint or facial recognition for authentication.
Windows Hello - What is Windows Hello for Business?

Right Click → ‘Copy Link Address’

Windows Hello for Business is a modern, secure authentication method that replaces traditional passwords with PINs, fingerprint recognition, or facial recognition. It enhances security and provides a faster, more convenient sign-in experience.

Workstation Recommendations of Use

Right Click → ‘Copy Link Address’

Data Backups
  • As specified in the Personal Computer Configuration Policy, it is every employee’s responsibility to ensure that all data that has a continuing value to the Government is stored on corporately governed and managed repositories.  Backups should be carried out on a regular basis and it is recommended that at least the latest 3 backups are kept. Thus, MITA is not responsible for backups on user’s workstations. However, if requested assistance is provided so that the User is able to perform data backup and restore.

Job Sheets
  • Job Sheets are used whenever a MITA agent or representative performs a site visit.  It is a means of confirmation by the user that a request has been serviced as described, as well to document any further required actions.  A Job sheet must be filled in for every site visit that is performed. There will be multiple job sheets for the same call if multiple site visits were performed.  It is the client’s responsibility to ensure that the details entered are correct and reflect the actual work carried out.  The client then fills in his details in the appropriate area and signs off the Job Sheet.

The client can request to take a photocopy of the filled in job sheet.  The client should always keep a copy of the job sheet whenever hardware is being picked up or delivered back.


Offline Mail
  • It is good practice to regularly clean up the mailbox (including the Deleted Items and Sent Items folders) to keep the mailbox size as low as possible.  An Offline folder can be created to further reduce the size of the online mailbox.  It is recommended that regular backups of the Outlook Offline files are taken on media such as DVDs, USB Pen Drives or External Hard Disks.

Since offline is in effect a local file, the offline file must be available to view or update offline email.  This means that although online features are available from anywhere using Microsoft Outlook Clients, the offline file must be available on the workstation being used to be accessed.


Sharing of Folders
  • Folders on workstations should not be shared to other users since the security levels of such setup is not robust enough.  Sharing of data between users should be made by using shared folders on OA servers.
Workstation Service Description

Right Click → ‘Copy Link Address’

Who is entitled for the Service?
  • All government employees using contracted workstations are entitled for workstation support within contracted sites.

Remote Support
  • Where possible and feasible MITA will try to connect remotely to contracted workstations to perform better first line support and attempt remote resolution. Remote support is done using Microsoft SCCM technology where the remote session is triggered by MITA and the user will be asked to approve the connection before it starts. If this fails MITA can also opt to use Bomgar by requesting the user to go to https://bomgar.gov.mt and select the appropriate agent from the list (as instructed by MITA). Simple on-screen instructions will guide the user to allow the MITA agent to connect to your workstation. MITA can also provide a session key that will be entered by the user in this website to initiate the remote support session. Alternatively, MITA can send an email with a link that will take the user directly to the remote support session after approval is granted.

Remote Support
  • Contracted Workstations have to be configured according to best operational practices adopted by MITA. This configuration includes the following:
    • Connection to the government network.
    • MITA standard antivirus software.
    • Standard NetBIOS naming convention that uniquely identifies each workstation according the the inventory label number.
    • Initial installation that contains a standard set of approved software.

Centralised Configuration
  • Workstations that are installed with the standard configuration benefit from the below centrally managed services:
      • Automatic antivirus definition updates
      • Automatic Windows updates
      • Version updates of specific software included within the standard configuration
    • Group Policies (GPOs and GPPs) configured in a way to protect the operating system files from accidental or malicious deletion and/or modification
    • Screen saver that triggers after 15 minutes of inactivity, automatically locking the workstation, requiring credentials to resume working for security reasons
    • Access to approved virtual applications, most of which are automatically installed when a user logs on a new workstation
    • Power management settings

Power Management
  • In collaboration with the Sustainable Energy and Water Conservation Unit (SEWCU), MITA sets power management settings on workstations connected to CORP domain. The scope of this change is to have the workstations configured in a more energy efficient manner, thus resulting in less power consumption. The settings configured are as below (any user settings are superseded):
    • PCs and Laptops connected to the mains / power adapter:
      • Display is turned off automatically after 10 minutes of inactivity.
      • PC / Laptop is put in sleep mode after 30 minutes of inactivity.
    • Laptops using the battery:
      • Display is turned off automatically after 5 minutes of inactivity.
      • Laptop is put in sleep mode after 15 minutes of inactivity.
Workstation Service Information

Right Click → ‘Copy Link Address’

A workstation is a desktop computer or a laptop within a site that is connected to the government network (MAGNET) and joined to a MITA managed windows domain. It also includes any government owned peripherals attached to it.

Support is only given on contracted workstations. All contracted workstations have an inventory label with a unique identification number, also referred to as the inventory number. This number is registered in systems within MITA to facilitate the identification of contracted workstations. For all workstation related requests, the respective inventory number has to be provided by the user before the request can be logged.

There are four different kinds of labels, with the old inventory labels being phased out. The inventory labels on PCs are usually attached on to the top left hand corner of the PC case, while on laptops these are normally found on the bottom side of the case.

The service provided on workstations can be software support, hardware support or both, depending on how the particular workstation is contracted. Hardware support is any intervention that requires the servicing of hardware components within the workstation.

 
The following is an overview of the software support provided:
  • Configuration of workstations for network access
  • Troubleshooting Operating System issues
  • Configuration of printers and other peripherals
  • Assistance in installing Line of Business software
  • Installing and supporting Corporate Software
  • Reinstallation of workstations (if required to solve technical issues) using a standard predefined image
  • Centrally managed Operating System patch updates
  • Centrally managed Power Management features (excluding health related workstations)
  • Centrally managed Antivirus / Endpoint updates and configuration
  • Remote support using Microsoft SCCM
  • Remote deployment of applications using SCCM where available
  • On Site support (where necessary) during Service Hours
 
The following is an overview of the hardware support provided:
  • Installation, configuration and commissioning for new workstations.
  • Diagnosis, troubleshooting and repair of hardware.
  • On Site Support during Service Hours.
 
The service explicitly excludes support on the following types requests (the standard SLAs are not applicable when servicing such types of requests) :
  • Support outside Normal Working Hours unless explicitly contracted.
  • Hardware Repairs and Replacements on workstations that are not contractually covered for this service.
  • Consumables such as mice, keyboards, laptop batteries, printer toner and cartridges.
 
When bulk installations or movement of workstations are required on a number of multiple workstations, the work has to be prioritized so as to minimize impact on the provision of service. For this reason and for the fact that such work usually takes more time to complete, different SLAs may apply in such scenarios as per the below table:
 
​​No of impacted workstation
​​SLA Priority
​1-4​2
​​​​5-25​3
​​​>25​​Time & Material​
 
 
This Service targets 90% of all requests to be solved within their respective Service Level.  Each workstation can have SLA 1 or SLA 2 assigned to it. This is set by MITA as requested by the respective CIO and stored within the MITA systems to facilitate the identification of the SLA during the provision of the service. SLA 3 is used for bulk requests as indicated above.
 

 
NOTE: These SLAs are applicable during respective Service Hours only unless indicated otherwise.
 
Workstation Incidents SLAs for Government (excluding schools)
​​Service Hours: Monday to Friday 07.45 – 17.15  (excludes Public Holidays)
Request DescriptionSLA
​SLA 1 workstation request​​4.5 hrs
​SLA 2 workstation request​12 hrs
​​SLA 3 workstation request​5 working days
Workstation Incidents SLAs for Schools
Service Hours: Monday to Friday 08.00 – 14.00  (excludes Public and School Holidays)
Request DescriptionSLA
​SLA 1 workstation request​​n/a
​SLA 2 workstation request​15 hrs​
​​SLA 3 workstation request​5 working days
 
MITA Support
Privacy Preference Center

When you visit any website, it may store or retrieve information on your browser, mostly in the form of cookies. This information might be about you, your preferences or your device and is mostly used to make the site work as you expect it to. The information does not usually directly identify you, but it can give you a more personalized web experience. Because we respect your right to privacy, you can choose not to allow some types of cookies. Click on the different category headings to find out more and change our default settings. However, blocking some types of cookies may impact your experience of the site and the services we are able to offer.